Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance Accept |
| 2 | L2₹2.9 L+₹3,067.94 (1.07%)Rejected-Finance | ₹2.9 L+₹3,067.94 (1.07%) | L2 | Rejected-Finance Reject |
Tender Value
₹3.1 L
EMD Value
₹3,068
Closing Date
15 May 2026, 5:30 pmClosed
SURESH KUMAR AHIRWAR
GWALIOR MUNICIPAL CORPORATION
( Moulik Nidhi) Construction of C.C. Road and Drian work at Kumaharpura Ambedkar Nagar . Ward 28. Zone 11 File No. 78/26X3/6.
2026_UAD_504376_1
MPGMC/78/26x3/6/jan/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
JANKARYA DEPARTMAENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3,068
21 Jul 2026
30 Apr 2026
18 May 2026
1 May 2026
15 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures by manual means comprising of masonry, cement concrete,woodwork, steel work, including T&P and scaf folding wher evern ecessary, sorting the dismantled material, disposal
of un serviceable material and stacking the serviceable material with all lifts and lead upto 1000 meter and as per relevant clauses of section-200 in.For pipe
For Drain | - | cum | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm
on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil
For pipe
For Drain | - | cum | - | - |
| 3 | Transportation By Mechanical means including loading, unloading and stacking 1km | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level.Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum
size of stone aggregate For Drain | - | Cum | - | - |
| 5 | Providingand laying inpositioncement concreteof specifiedgrade excluding thecost of centeringandshutteringAllworkup to plinth leve Cement concrete grade M-10 (NominalMix) with 40 mm maximum
size of stone aggregate For Drain | - | Cum | - | - |
| 6 | Centeringandshuttering includingstrutting, proppingstretchingetc. complete for and removal of formworkbysheet plateor plywood shuttering for | - | Sqm | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level.Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum
size of stone aggregate | 1 | Cum | - | - |
| 8 | Providing and laying non pressure pipe NP2 cllass cement concrete hume pipe for service ducts below concrete pavement or other 300 mm dia | - | mtr | - | - |
| 9 | 6.8Brickworkwillwellburntopenbhattabrickscrushingstrengthnotlessthan25kg/cm²andwaterabsoptionnotmorethan20infoundationandplinthIn cm 1:6. | - | Cum | - | - |
| 10 | 13.215 mm cement plaster on rough side of single or half brick wall of mix13.2.11:4 (1 cement: 4 sand | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
BOQ_607522.xls
BOQ • 0.24 MB
Estimete.pdf
Additional Documents • 3.48 MB
TenderDocument.pdf
Tender Documents • 2.87 MB
Drawing.pdf
Additional Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .