Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -12.01% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 CrAdmitted-Finance | -10.86% | ₹1.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.3 CrAdmitted-Finance | -8.13% | ₹1.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.4 CrAdmitted-Finance | -6.69% | ₹1.4 Cr | L4 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
25 May 2026, 6:00 pmClosed
SE PWD HMH
PWD Circle Hanumangarh
Construction of CC Road (Atal Path) under Package No RJ-15-08/Atal Path Roads/ 2026-27 (Pilibanga)
2026_CEPWD_557712_1
SE_NIB_No_04_Year_2026-27
Open Tender
Civil Works
EE PWD Pilibanga
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
EE PWD Pilibanga
₹3.5 L
Yes
27 May 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of CC Road From Surjaram Sharma's House towards Khen Wala Dher via Sohan Lal's House | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 0.65 | Hect. | 10,374 | ₹6,743.1 |
| 1.02 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification By Mechanical Means Clause 202 Cement Concrete interlocking Block | 360 | cum | 252 | ₹90,720 |
| 1.03 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Cement mortar | 50 | cum | 155 | ₹7,750 |
| 1.04 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Dry Brick Pitching or Brick Soling | 150 | cum | 94 | ₹14,100 |
| 1.05 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 Grade improvement | 4,860 | Cum | 33 | ₹1,60,380 |
| 1.06 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 Same as above use in embankment | 4,860 | Cum | 25 | ₹1,21,500 |
| 1.07 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. for grading VI in carriage way | 1,093.95 | Cum | 1,401 | ₹15,32,623.95 |
| 1.08 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. in carriage way | 729.3 | Cum | 2,418 | ₹17,63,447.4 |
| 1.09 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) Village Portion | 1,458.6 | cum | 4,811 | ₹70,17,324.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Cover_page.pdf
Tender Documents • 0.53 MB
Department_Circular.pdf
Tender Documents • 13.43 MB
escalation_components.pdf
Tender Documents • 0.21 MB
New_Special_Condition_of_Roads.pdf
Tender Documents • 1.13 MB
BOQ_992884.xls
BOQ • 0.29 MB
Correctness_certificate.pdf
Tender Documents • 0.18 MB
Agreement_RPWA.pdf
Tender Documents • 0.64 MB
engineering_cost.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid