| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹8.9 L (8.05%)Admitted-Finance | ₹1.2 Cr+₹8.9 L (8.05%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| 4 | Not Admitted-Fee/PreQual/Technical 456 1 AROOR KOOT ROAD SORAIYUR POST KALAVAI TALUK RANIPET 632318 | RANIPET | TAMIL NADU | 632318 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| Sl No | Description | Qty | Unit | M SHANTI L1 | T.RAMAR L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road from Okkur - Malampatti Road to Alangampatty Road km 0/0 - 0/900 R-137 | |||||
| 2.00 | Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers | 648 | Sqm | - | - |
| 3.00 | Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A | 378 | Cum | - | - |
| 4.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 5.00 | Km 0/0 - 0/900 | 54 | Cum | - | - |
| 6.00 | Picking the Existing Worn out BT Surface including all charges etc., complete. | 900 | Sqm | - | - |
| 7.00Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | |||||
| 8.00 | Km 0/0 - 0/900 | 204 | Cum | - | - |
| 9.00Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed. | |||||
| 10.00 | Km 0/0 - 0/900 | 204 | Cum | - | - |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
26 Nov 2019, 3:00 pmClosed
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
Strengthening of 6 Road work at Package No.TNSVG/1/SVG/ SCPAR 2019-20 in Sivagangai Block of Sivagangai District
2019_RDTN_147643_1
DIPR/4220/TENDER/Pk1svglSCPAR
Open Tender
Civil Works - Roads
Item Rate
180 days
Sivagangai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
O/o The Project Director, DRDA, Sivagangai
16 Jan 2020
19 Nov 2019
26 Nov 2019
19 Nov 2019
26 Nov 2019
19 Nov 2019
19 Nov 2019
Amount
Strengthening of the road from Okkur - Malampatti Road to Alangampatty Road km 0/0 - 0/900 R-137
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
HM Stone
Construction of 900mm Single Row Pipe culvert @ Chainage 0/400 , 0/600 -2 Nos
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of np3 pipe suitable collars including cost and conveyance
filling gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Sub total
Strenthening Of The Road From Paumpon Nagar Koothandan Roadb km 0/0 - 0/650 Sivagangai Block
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
HM Stone
Construction of 900mm Single Row Pipe culvert @ Chainage 0/500-1 Nos
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 Pipes including suitable collars including cost and coveyance
filling gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Construction of 1.50M Span Culvert @ Chainage 0/400Nos
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
centering , shuttering and strutting to the soffits of RCC Slab and beams including cost and conveyance of all materials
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
filling gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Sub total
Strengthening of the road from Kovanoor to Manaseri Road in Sivagangai Block
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
HM Stone
Construction of 900mm Single Row Pipe culvert @ Chainage 0/200, 0/400, 0/600 -3 Nos
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply of NP3 Pipes including suitable collars including cost and coveyance
filling gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Sub total
Strengthening of the road from Alaghumeinanapuram (Panagadi road) to Vandavasi Road km 0/0 - 0/580 R-519
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
HM Stone
Sub total
Strengthening of the road from Madhagupatti - Alagamanagari Road to Narayana Chettiyar School KM 0/0 - 0/580
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
HM Stone
Provision for Sign Board
Sub total
Strengthening of the road from Vembankudi - Alangulam Road km 0/0 - 0/600
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Picking the Existing Worn out BT Surface including all charges etc., complete.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.RAMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_177754.xls
BOQ • 0.32 MB
PriceBid1SVGscpar.pdf
Tender Documents • 0.25 MB
TechnicalBid1SVGscpar.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .