Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
14 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
15 conditions · 4 needing a document upload
If the earnest money deposited by the bidder is in shape of Bank Guarantee, it should be supported by proper stamp duty, rate prescribed as per section 13 & 24 of the UP Stamp Act, 2008 and amended from time to time at the time of submission of bank Guarantee.
Please submit bank details of the firm / individual/ JV / partnership etc. i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number and other necessary & relevant documents.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
The work will be executed under supervision of Railway Engineer in-charge or his authorized representative at site.
The schedule of quantity is only approximate and may vary as per site condition. Any items may be added or deleted as directed by Engineer-in-charge to complete the work in all respect.
Contractor will issue identity cards to all his supervisors/laborers working at site as per Proforma given by Railway.
Survey and other design related works for 220 kV Transmission line from UPPTCL Sub-Station to Railway Chunar 220/132 GSS and Survey for 132kv Transmission Line from Chunar GSS to existing Naini-Jeonathpur Transmission Line and preparation of various drawings and survey for 220/132kV GSS at Chunar of North Central Railway.
PRYJPU2627T03~NCR
PRYJPU2627T03
Open
Works - General
6 Months
Prayagraj, Uttar Pradesh
₹0
₹82,000
22 Aug 2026
22 Aug 2026
31 Aug 2026
16 items across 1 schedule · ₹40,97,155 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Reconnaissance & Identification of Three Alternate Routes for 220kV Double circuit Transmission Line from UPPTCL Substation to Railway Chunar GSS | Kilometre | 70.00 | 8,050 | 5,63,500 | |
| 2 | Detailed Survey of the Approved Route for 220kV Double circuit Transmission Line from UPPTCL Substation to Railway Chunar GSS | Kilometre | 35.00 | 12,075 | 4,22,625 |
| 3 | Reconnaissance & Identification of Three Alternate Routes for 132kV Double circuit Transmission Line from Railway Chunar GSS to Existing Naini-Jeonathpur Transmission Line | Kilometre | 40.00 | 8,050 | 3,22,000 |
| 4 | Detailed Survey of the Approved Route for 132kV Double circuit Transmission Line from Railway Chunar GSS to Existing Naini-Jeonathpur Transmission Line | Kilometre | 40.00 | 12,075 | 4,83,000 |
| 5 | Preparation and submission of general power supply on AUTOCAD supply diagram incorporating existing arrangements & required changes in the existing system based on RDSO/CORE guidelines/Standard. The corrections if any as and when required shall have to be carried out till it is finally approved by Railway authority (or its authorized representative as decided by Railway authority) six hard copies and soft copy to be supplied.( For 220KV & 132KV Transmission Line Network, 2x25 kV PSI system) | Job | 3.00 | 59,000 | 1,77,000 |
| 6 | Conducting Standard Penetration test as per IS : 2131 at the designated points At different locations, collecting soil samples (i. Moisture content/Dry Density, ii Alterberg Limit. iii Specific Gravity, iv Grain Size Analyst, V. natural density, vi. Direct Shear Test, vii consolidation test, viii unconfined compression test) Providing Reports of test results and recommendation of the safe bearing capacity on the basis of SPT and soil test results and submission of reports in a booklet. | Each | 45.00 | 17,742 | 7,98,390 |
| 7 | Measurement of Soil Resistivity of the Substation | Job | 1.00 | 5,900 | 5,900 |
| 8 | Preparation of Location Plan for Chunar GSS, TSSs, SPs & SSPs | Job | 23.00 | 3,540 | 81,420 |
| 9 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.(All Kinds of Soil) | cum | 300.00 | 82 | 24,600 |
| 10 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation to be paid separately). | cum | 15.00 | 32,891 | 4,93,365 |
| 11 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts and earth work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used (With GI Barbed Wire) | Metre | 2100.00 | 22 | 46,200 |
| 12 | Preparation of GAD/TAD for Building (s) including site data collection for the proposed 220/132 kV Grid Sub-Station (GSS) Building | Numbers | 1.00 | 5,590 | 5,590 |
| 13 | Preparation of LT Wiring plan of Chunar GSS Building showing details of Light, Power point along with SLD and Details of DB panels | Job | 1.00 | 11,800 | 11,800 |
| 14 | Supply and Erection of Retro- reflective Name Plate including fixing and other accessories as per directed by the site in charge | Square Foot | 15.00 | 851 | 12,765 |
| 15 | Preparation of GAD for 220/132kV GSS at Chunar | Job | 1.00 | 59,000 | 59,000 |
| 16 | Vetting of GAD of Chunar GSS by reputed institute IIT/NIT | Job | 1.00 | 5,90,000 | 5,90,000 |
| Schedule total | ₹40,97,155 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf GCC ACS 12
ATTACHMENT
TenderDcoumentT0322.08.2026.pdf
ATTACHMENT
BrandsofmaterialsintendersofDSR-CPWD.pdf
ATTACHMENT
2026_06_16Acceptanceofe-BankGuaranteee-BGinWorksContractsandPGMS_PMS_PSSAGC.pdf
ATTACHMENT
2023_09_05RBCE_CE-I-CTSystemofVerificationofTendererCredentials.pdf
ATTACHMENT
CorrectionSlip1-10.pdf
ATTACHMENT
PCECircularforFoundationworksnearTrack.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
Annexure-V.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].