| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹1.3 L (0.80%)Admitted-Finance | ₹1.6 Cr+₹1.3 L (0.80%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to not meeting upper tendering limit |
| Sl No | Description | Qty | Unit | M/S YOGESH CHANDRA AGARWAL L1 | M/S M. T. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART -I (For RCC wall of Ht 4 mtr above GL) | |||||
| 1.01 | Earth work in excavation of by mechanical means manual means over areas including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m as directed by Engineer -in-Charge. | 237.23 | Cum | 1,03,195.05 ₹1,03,195.05 Lowest | 1,04,381.2 ₹1,04,381.2 |
| 1.02 | Filling available excavated earth | 109.86 | Cum | 65,916 ₹65,916 Lowest | 66,465.3 ₹66,465.3 |
| 1.03 | Providing and laying in position cement concrete of specified grade with cement mortar1:4:8 (1 cement: 4 Coarse sand:8 graded stone aggregate 40mm nominal size aggregate) including centering and shuttering complete | 24.44 | Cum | 3,42,160 ₹3,42,160 Lowest | 3,44,604 ₹3,44,604 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from naturalsources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 105.05 | Cum | 22,06,050 ₹22,06,050 Lowest | 22,16,555 ₹22,16,555 |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 65.8 | Cum | 15,13,400 ₹15,13,400 Lowest | 15,13,400 ₹15,13,400 Lowest |
| 1.06 | Centering and shuttering including strutting, propping etc and removal of form for | 198.34 | Sqm | 1,33,879.5 ₹1,33,879.5 Lowest | 1,34,871.2 ₹1,34,871.2 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal
of form for wall (any thickness) including attached pilasters , butteresses , plinth and string course etc. | 376 | Sqm | 5,64,000 ₹5,64,000 Lowest | 5,67,760 ₹5,67,760 |
| 1.08 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. (Below G.L) | 6,166.46 | Kg | 12,94,956.6 ₹12,94,956.6 Lowest | 13,07,289.52 ₹13,07,289.52 |
| 1.09 | Steel reinfrocement for RCC work including starightening , cutting , bending , placing in position and binding all complete. (Above G.L) | 7,231.2 | Kg | 15,18,552 ₹15,18,552 Lowest | 15,33,014.4 ₹15,33,014.4 |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
11 Nov 2024, 10:00 amClosed
SO-1 (Wks), HQ DGAR
HQ DGAR, Laitkor, Shillong
Provision of protective works RCC Wall Drainage Work Gabion Wall and Hard Standing for Magazine Building at Bn HQ Somsai
2024_ARMHA_833061_1
VIII. 11014/8804/HQ 10 Sect AR/Engr-2024
Open Tender
Civil Works
Item Rate
270 days
Somsai
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Directorate General Assam Rifles
₹3.1 L
25 Nov 2024
29 Oct 2024
12 Nov 2024
29 Oct 2024
11 Nov 2024
29 Oct 2024
29 Oct 2024 - 7 Nov 2024
SCHEDULE `A' PART -I (For RCC wall of Ht 4 mtr above GL)
Earth work in excavation of by mechanical means manual means over areas including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m as directed by Engineer -in-Charge.
Filling available excavated earth
Providing and laying in position cement concrete of specified grade with cement mortar1:4:8 (1 cement: 4 Coarse sand:8 graded stone aggregate 40mm nominal size aggregate) including centering and shuttering complete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from naturalsources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc and removal of form for
Centering and shuttering including strutting, propping etc. and removal of form for wall (any thickness) including attached pilasters , butteresses , plinth and string course etc.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. (Below G.L)
Steel reinfrocement for RCC work including starightening , cutting , bending , placing in position and binding all complete. (Above G.L)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Providing and fixing PVC rain water pipes for weep holes 75mm dia
SCHEDULE `A' PART -II (PCC Drain)
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Supplying and stacking at site 63 mm to 45 mm size stone aggregate
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand)
SCHEDULE `A' PART -III (Gabion Wall)
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/ selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge.
SCHEDULE `A' PART -IV (Hard Standing)
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Supplying and stacking at site 90 mm to 45 mm size stone aggregate
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and filling in position bitumen mix filler of proportion 80 kg. of hot bitumen, 1 kg. of cement and 0.25 cubic metre of coarse sand for expansion joints.
M/S M. T. ENTERPRISES (BID ID -3117648)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .