Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAccepted-Finance E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | ₹46.5 L | L1 | Accepted-Finance Due to quoted lowest rates |
| 2 | L2₹46.7 L+₹14,976 (0.32%)Rejected-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | ₹46.7 L+₹14,976 (0.32%) | L2 | Rejected-Finance Due to quoted higher rates |
| 3 | L3₹52.9 L+₹6.4 L (13.7%)Rejected-Finance | ₹52.9 L+₹6.4 L (13.7%) | L3 | Rejected-Finance Due to quoted higher rates |
| 4 | L4₹58.3 L+₹11.8 L (25.3%)Rejected-Finance FIRST FOOR SCF 1 SECTOR 17 FARIDABAD FARIDABAD FARIDABAD HARYANA 121002 | FARIDABAD | HARYANA | 121002 | ₹58.3 L+₹11.8 L (25.3%) | L4 | Rejected-Finance Due to quoted higher rates |
| 5 | L5₹58.6 L+₹12.0 L (25.9%)Rejected-Finance | ₹58.6 L+₹12.0 L (25.9%) | L5 | Rejected-Finance Due to quoted higher rates |
Tender Value
₹67.0 L
EMD Value
₹1.3 L
Closing Date
12 Mar 2020, 3:00 pmClosed
Manager Electrical Division ITPO
Hall no.7 ,ITPO office Pragati Maidan New delhi
Operation and Annual Comprehensive Maintenance contract of Central AC Plant of Hall -12-12A at Pragati Maidan, New Delhi for the period of two years. (SH- Operation and Comprehensive Maintenance of 3 no. of 450TR Central AC Plant)
2020_ITPO_550750_1
169-ITPO(1)/E-E /2019-20/1917
Open Tender
Electrical Works
Item Rate
730 days
ITPO Pragati Maidan New delhi
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
Yes
ITPO
₹1.3 L
Yes
11 Jun 2020
6 Mar 2020
13 Mar 2020
6 Mar 2020
12 Mar 2020
6 Mar 2020
Amount
Annual Comprehensive maintenance of central air conditioning plant with details of equipment as under as per terms & condition attached (a) 450 TR Centrifugal Chilling Unit =3 Nos.(Carrier make) (b) Chilled Water Pumps (Primary)=3 Nos. (c) Chilled Water Pumps (Secondary)=3 Nos. (d) Condenser Water Pumps=3 Nos. (e) Cooling Tower=3 Nos. (f) Floor Mounted AHU’s =10 Nos. (g) Tube Axial Flow Fan=10 Nos. (h) All the Electrical Control Panel in AC Plant, Control Console Panel & AHU Room Panels (i) Associated work such as piping, valves and ducting etc.
Operation of central air conditioning plant installed at Pragati Maidan, with details of equipments as per Item No. 1 in one shift of 8 Hrs from 10AM to 6PM on all days excluding weekly rest days and Gazetted holidays, as per terms & condition attached and by deputing following man power. (i) HVAC operator – 2 nos. (ii) Khalasi - 1 no. (Note:Weekly rest for work man shall be shifted during non exhibition days)
snowmex engineers ltd
Dexter23 Building Solutions
swastik airconditioning co
VSAVE ELECTRONICS PRIVATE LIMITED
Blue Star Limited
Powermech Services Private Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .