| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.5 L+₹1.8 L (9.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Ramesh Enterprises | M.VELLATHURAI |
|---|---|---|---|---|---|
| 1.00 | Chipping and removing the deteriorated damaged concrete surface of RCC structures including all foreign materials and leaving behind only firm and solid concrete including cleaning with water, removing the loose rust deteriorated on the reinforcement by brushing and sand blasting or hydro blasting at a pressure not exceeding 7 Kg/cm²., cleaning with jet air etc., including applying one coat of Nitozinc primer to the exposed reinforcement rods, including all labours, tool equipment’s, staging propping etc., complete as directed by the Engineer at site. | 261.8 | M2 | 2,90,336.2 ₹3,42,596.72 Lowest | 3,18,348.8 ₹3,75,651.58 |
| 2.00 | Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc. complete. | 261.8 | M2 | 10,78,354.2 ₹12,72,457.96 Lowest | 11,81,241.6 ₹13,93,865.09 |
| 3.00 | Supplying, cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc., complete | 261.8 | M2 | 1,53,676.6 ₹1,81,338.39 Lowest | 1,68,337.4 ₹1,98,638.13 |
| 4.00 | Applying DEKGUARD/ equivalent primer by spraying to the newly gunitted concrete surfaces as per manufactures specifications rate including cost of all materials, labours, lead, lifts etc., complete. | 261.8 | M2 | 52,098.2 ₹61,475.88 Lowest | 57,334.2 ₹67,654.36 |
| 4.20 | Applying two coats of DEKGUARD S/ equivalent top coat to the exposed concrete surfaces by brush/ roller coating continuously rate including cost of all materials, labours, lead, lift, etc., complete. | 696.5 | M2 | 2,94,619.5 ₹3,47,651.01 Lowest | 3,23,176 ₹3,81,347.68 |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
23 Jun 2025, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Remedial measures to RCC PSC Structures of Coal Jetty 1 Conveyor System Conveyor 13A Short Span, JT 1AE Building and Long Span - 1 in Red Gate area North Break Water of VOC Port at ECHS areas
2025_EB_565416_1
CE SE C TTPS Spec. No 130 25 26
Open Tender
Civil Works - Others
Item Rate
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,700
Yes
15 Sept 2025
5 Jun 2025
24 Jun 2025
5 Jun 2025
23 Jun 2025
5 Jun 2025
Chipping and removing the deteriorated damaged concrete surface of RCC structures including all foreign materials and leaving behind only firm and solid concrete including cleaning with water, removing the loose rust deteriorated on the reinforcement by brushing and sand blasting or hydro blasting at a pressure not exceeding 7 Kg/cm²., cleaning with jet air etc., including applying one coat of Nitozinc primer to the exposed reinforcement rods, including all labours, tool equipment’s, staging propping etc., complete as directed by the Engineer at site.
Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc. complete.
Supplying, cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc., complete
Applying DEKGUARD/ equivalent primer by spraying to the newly gunitted concrete surfaces as per manufactures specifications rate including cost of all materials, labours, lead, lifts etc., complete.
Applying two coats of DEKGUARD S/ equivalent top coat to the exposed concrete surfaces by brush/ roller coating continuously rate including cost of all materials, labours, lead, lift, etc., complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .