| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 LAccepted-AOC MOULIVAKKAM 116 | NAGAPATTINAM | TAMIL NADU | 608002 | ₹7.8 L | 1 | Accepted-AOC lesser the estimate rate |
| 2 | 2₹8.2 LRejected-Finance | ₹8.2 L | 2 | Rejected-Finance higher the estimate rate |
| Sl No | Description | Qty | Unit | GOOD CARE ENVIRO SYSTEM PVT LTD L1 | T MARIYAPPAN L2 |
|---|---|---|---|---|---|
| 1.00 | Milling the existing BT surface 50 to 70mm depth Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all othe incidental charges etc. complete as per the direction of the departmental officers | 807.5 | m3 | 75.5 ₹60,966.25 | 80 ₹64,600 |
| 2.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 807.5 | m2 | 29 ₹23,417.50 | 31 ₹25,032.50 |
| 3.00 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 40.38 | m3 | 10,512 ₹4.2 L | 11,037 ₹4.5 L |
| 4.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG40 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 25.02 | m3 | 10,945 ₹2.7 L | 11,492 ₹2.9 L |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
5 Mar 2026, 3:00 pmClosed
commissioner
13,sendurai main rd,elil nagar,dindigul
TNCRUDP Fund-Improvement of BT Surface at West Arokia matha st.,(078020R643) in DCMC
2026_MAWS_666791_1
2855/2023/E4
Open Tender
Civil Works
13, sendurai main rd, elil nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
7 May 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Milling the existing BT surface 50 to 70mm depth Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all othe incidental charges etc. complete as per the direction of the departmental officers
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG40 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_801001.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_801001.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid