| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.0 CrAccepted-AOC | ₹40.0 Cr | 1 | Accepted-AOC L1 (awarded value excluded GST) |
| 2 | 2₹41.4 CrRejected-Finance | ₹41.4 Cr | 2 | Rejected-Finance L2 |
| 3 | 3₹42.9 CrRejected-Finance | ₹42.9 Cr | 3 | Rejected-Finance L3 |
| 4 | 4₹43.5 CrRejected-Finance 626 6TH FLOOR DLF TOWER A DLF TOWER 626 6TH FLOOR DLF TOWER A JASOLA JASOLA SOUTH DELHI DELHI 110076 | SOUTH DELHI | DELHI | 110076 | ₹43.5 Cr | 4 | Rejected-Finance L4 |
| 5 | 5₹45.1 CrRejected-Finance | ₹45.1 Cr | 5 | Rejected-Finance L5 |
Tender Value
₹59.7 Cr
EMD Value
₹1.2 Cr
Closing Date
26 Feb 2020, 6:00 pmClosed
Director
E 166 Yudhishtir marg c scheme jaipur
Construction of 220kV and 132kV Tr lines on turnkey basis
2020_RRECL_175197_1
LINES_TN_02_2019_20
Open Tender
Electrical Works
450 days
Nokh
Please refer Tender documents.
3 documents required · 3 mandatory
₹23,600
MD, RSDCL
₹1.2 Cr
Yes
RRECL Jaipur
15 May 2020
21 Jan 2020
27 Feb 2020
21 Jan 2020
26 Feb 2020
21 Jan 2020
31 Jan 2020
Amount
Fabrication, Galvanizing, testing & supply of steel towers/extensions including Stubs, U-Bolts, Hangers, D-Shakels, Bird Guards, Anti Climbing Devises, attachment for Danger Plate, Phase Plate & Number Plate, Flat Washers and Bolts & Nuts required for U-Bolts, Hangers and D-Shakels etc. (Quantity as per Annexure-VI(1A))
G.I. NUTS & BOLTS IN Assorted Size
A) OPGW 24 Fibre
B) OPGW 48 Fibre.
C) OPGW 96 Fibre
A) 120KN DISC INSULATOR /220KV TENSION PORCELAIN LONGROD INSULATOR/ Discs (18900/1350) Note:- for 220kV line, 1 string consists of 14 Nos. 120KN Disc Insulators
B) 70KN DISC INSULATOR/ 220KV SUSPENSION PORCELAIN LONGROD INSULATOR (13065/1005) Note:- for 220kV line, 1 string consists of 13 Nos of 70KN Disc Insulators.
High Amp alloy AL-59 (Moose-Equivalent) CONDUCTOR
CONDUCTOR HARDWARE FOR High Amp alloy AL59 MOSSE CONDUCTOR : A) SINGLE SUSPENSION
B) DOUBLE SUSPENSION
C) SINGLE TENSION
D) DOUBLE TENSION
CONDUCTOR ACCESSORIES FOR High Amp alloy AL-59 (Moose-Equivalent) CONDUCTOR: A) ARMOUR RODS
B)M.S.COMP JOINTS
C)REPAIR SLEEVS
D)VIBRATION DAMPERS
OPGW 24/48/96 Fibre HARDWARE FITTINGS: A) SUSPENSION ASSEMBLY for 24
B) SUSPENSION ASSEMBLY for 48
C) SUSPENSION ASSEMBLY for 96
D) DOUBLE TENSION ASSEMBLY (PASS-THROUGH) for 24
E) DOUBLE TENSION ASSEMBLY (PASS-THROUGH) for 48
F) DOUBLE TENSION ASSEMBLY (PASS-THROUGH) for 96
G) SINGLE TENSION ASSEMBLY for 24
H) SINGLE TENSION ASSEMBLY for 48
I) SINGLE TENSION ASSEMBLY for 96
J) VIBRATION DAMPERS for 24
K) VIBRATION DAMPERS for 48
L) VIBRATION DAMPERS for 96
M) SPLICE BOX FOR OPGW-OPGW ON TOWER(for line) for 24
N) SPLICE BOX FOR OPGW-OPGW ON TOWER(for line) for 48
O) SPLICE BOX FOR OPGW-OPGW ON TOWER(for line) for 96
P) SPLICE BOX FOR OPGW-OFAC ON TOWER(for PSS) for 24
Q) SPLICE BOX FOR OPGW-OFAC ON TOWER(for PSS) for 96
R) DOWN LEAD CLAMP FOR OPGW ON TOWER for 24,48 & 96
S) HOLDER BRACKET FOR OPGW ON TOWER for 24,48 & 96
T) OFAC FROM TOWER TO CONTROL ROOM 24
U) OFAC FROM TOWER TO CONTROL ROOM 96
V) DUCT PIPE FOR OFAC TOWER TO CONTROL ROOM 24
W) DUCT PIPE FOR OFAC TOWER TO CONTROL ROOM 96
X) Fibre optic distribution panel, 96 pair for termination of OFAC at PSS control room
Y) SPLICE BOX FOR OPGW ONE INCOMING(96 fibre) & TWO OUTGOING (48 fibre) for MCKT
Z) SPLICE BOX FOR OPGW ONE INCOMING(48 fibre) & TWO OUTGOING (24 fibre) for LILO Point
PHASE PLATES
DANGER PLATES
NUMBER PLATES (as per Line)
EARTHING SETS: A) PIPE TYPE
B) COUNTER POISE TYPE
SPRING WASHERS (unit weight:-0.009 kg)
STEP BOLTS 16 X 175 MM
AVIATION AIDS
A) Medium itensity obstruction light
B) Low intensity obstruction light
C) Solar batteries of capacity 160AH at 10Hrs rate suitalble for 10 sunless days required for one MI & two LI light per tower
D) Solar Photovoltaic moudles 60wp with module mounting frame & structure to care the load demand of one Ml & two LI lights for continuous operation for 13 hrs per day
E) Control panel complete with all accessories including charge controller
F) Cable & clamps
G) Battery box
H) Mounting bolts & fixures
I) Gloubles as per Civil aviation/defence authorities recommendations
Description of Work / Item(s)
Amount
Fabrication, Galvanizing, testing & supply of steel towers/extensions including Stubs, U-Bolts, Hangers, D-Shakels, Bird Guards, Anti Climbing Devises, attachment for Danger Plate, Phase Plate & Number Plate, Flat Washers and Bolts & Nuts required for U-Bolts, Hangers and D-Shakels etc. (Quantity as per Annexure-VI(2A))
Disc Insulators :
A) 120KN 11 KV DISC INSULATOR
B) 70KN 11 KV DISC INSULATOR
ACSR Panther Conductor
CONDUCTOR HARDWARE For ACSR Panther conductor:
A) SINGLE SUSPENSION
B) DOUBLE SUSPENSION
C) SINGLE TENSION
D) DOUBLE TENSION
CONDUCTOR ACCESSORIES for ACSR Panther Conductor:
A) ARMOUR RODS
B) M.S.COMP JOINTS
C)REPAIR SLEEVS
D)VIBRATION DAMPERS
PHASE PLATES
DANGER PLATES
NUMBER PLATES (as per Line)
Earth Wire 7/3.15mm
Earth Wire Accessories:
A) Suspemsion assembly
B) Tension assembly
EARTHING SETS :
A) PIPE TYPE
B) COUNTER POISE TYPE
G.I. NUTS & BOLTS IN Assorted Size
SPRING WASHERS (unit weight:-0.009 kg)
STEP BOLTS 16 X 175 MM
Bidder Name
Amount
KARNIMATA CONSTRUCTION COMPANY
Associated Power Structures Pvt. Ltd.,
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
Montecarlo Limited
JAKSON LIMITED
Bidder Name
Amount
KARNIMATA CONSTRUCTION COMPANY
Associated Power Structures Pvt. Ltd.,
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
Montecarlo Limited
JAKSON LIMITED
Description of Work / Item(s)
Amount
Lumsum Charges for dismentalling of 132 KV D/c towers (Type-A: 07 Nos. & Type- B: 03 Nos.) of single circuit line having super structures along with extension (if any), having tack welded nut bolts, removing of D-shackles, ACD, Hangers, U-Bolts, step bolts, danger plate, phase plate, number plate, De-stringing of Panther Conductor with Hardwares and Accessories as per procedure, dismentalling of earth wire by removing vibration damper, declipping of fitting in rollers and detensioning and collecting from site at one place, etc (Total 3.10 Km line).
Lump sum amount of dismantled material, payable by the bidder to RSDCL against retaining of dismantled material of 132kV line (This dismantled material of 132kV line shall be the property of bidder/ contractor).
Montecarlo Limited
KARNIMATA CONSTRUCTION COMPANY
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
JAKSON LIMITED
Montecarlo Limited
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
JAKSON LIMITED
KARNIMATA CONSTRUCTION COMPANY
Montecarlo Limited
KARNIMATA CONSTRUCTION COMPANY
Associated Power Structures Pvt. Ltd.,
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
KARNIMATA CONSTRUCTION COMPANY
Montecarlo Limited
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
Associated Power Structures Pvt. Ltd.,
KARNIMATA CONSTRUCTION COMPANY
Montecarlo Limited
Associated Power Structures Pvt. Ltd.,
SONAA ENGINEERS P Ltd PratapEnergySolutionsPLtd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid