| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.2 L+₹40,536.08 (7.01%)Admitted-Fee/PreQual/Technical/Finance | ₹6.2 L+₹40,536.08 (7.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.5 L+₹75,349.11 (13.0%)Admitted-Fee/PreQual/Technical/Finance | ₹6.5 L+₹75,349.11 (13.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.8 L+₹97,617.86 (16.9%)Admitted-Fee/PreQual/Technical/Finance | ₹6.8 L+₹97,617.86 (16.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Dhandayuthabani L3 | JNS ENTERPRISES L2 | ABDUL HAKEEM L4 | GOKULASREE CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 117.56 | Cum | 229.1 ₹26,933 Lowest | 263.78 ₹31,009.98 | 263.78 ₹31,009.98 | 263.78 ₹31,009.98 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance | 19.59 | Cum | 5,049.09 ₹98,911.67 | 5,339.63 ₹1,04,603.35 | 5,339.63 ₹1,04,603.35 | 2,500.66 ₹48,987.93 Lowest |
| 3.00 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete | 45.47 | Cum | 4,852.18 ₹2,20,628.62 | 5,082.99 ₹2,31,123.56 | 5,349.88 ₹2,43,259.04 | 2,756.36 ₹1,25,331.69 Lowest |
| 4.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labour charges etc complete | 388.65 | Sqm | 454.25 ₹1,76,544.26 | 250.04 ₹97,178.05 Lowest | 349.4 ₹1,35,794.31 | 546.61 ₹2,12,439.98 |
| 5.00 | Supply fabricating and placing in position Mild steel/ Ribbed tor steel grills for all RCC Works as per design given including cost of steel and G.I binding wire in all floors etc. complete complying with standard specification ( contractor has to make his own arrangements for the | 0.16 | MT | 197.5 ₹31.8 Lowest | 91,924.74 ₹14,799.88 | 91,924.74 ₹14,799.88 | 91,924.74 ₹14,799.88 |
| 6.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., | 2.07 | Cum | 4,412.23 ₹9,133.32 Lowest | 9,079.13 ₹18,793.8 | 9,000.25 ₹18,630.52 | 7,500.66 ₹15,526.37 |
| 7.00 | Plastering with CM 1:4 mix using 20mm Thick including cost and conveyance and all labour charges etc | 72.45 | Sqm | 298.62 ₹21,635.02 Lowest | 370 ₹26,806.5 | 339.44 ₹24,592.43 | 577.87 ₹41,866.68 |
| 8.00 | GST 18% | 1 | No | 99,687.18 ₹99,687.18 | 94,376.72 ₹94,376.72 | 1,03,084.11 ₹1,03,084.11 | 88,193.25 ₹88,193.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,350
Closing Date
20 Jul 2026, 3:00 pmClosed
The Panchayat President, Kilminnal Panchayat
The Panchayat office, Kilminnal Panchayat
Construction of Drain cum Culvert at Lakshmi Nagar Kilminnal H/O Kilminnal Panchayat
2026_RDTN_684661_1
A2/4755/2025
Open Tender
Civil Works
Works
90 days
The Panchayat office, Kilminnal Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,350
20 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 117.56 | Cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance | 19.59 | Cum | - | - |
| 3 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete | 45.47 | Cum | - | - |
| 4 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labour charges etc complete | 1 | Sqm | - | - |
| 5 | Supply fabricating and placing in position Mild steel/ Ribbed tor steel grills for all RCC Works as per design given including cost of steel and G.I binding wire in all floors etc. complete complying with standard specification ( contractor has to make his own arrangements for the | - | MT | - | - |
| 6 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., | 2.07 | Cum | - | - |
| 7 | Plastering with CM 1:4 mix using 20mm Thick including cost and conveyance and all labour charges etc | 72.45 | Sqm | - | - |
| 8 | GST 18% | 1 | No | - | - |
stage.html
html • 0.02 MB
finance_823032.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_823032.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .