| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC | ₹6.4 Cr Quoted ₹6.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.9 Cr+₹12.6 L (1.87%)Rejected-AOC | ₹6.9 Cr+₹12.6 L (1.87%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.1 Cr+₹32.5 L (4.79%)Rejected-AOC NO 10 2 KAVITHA GARDEN JOTHI NAGAR GOBICHETTIPALAYAM ERODE DISTRICT 638 478 | 638478 | ₹7.1 Cr+₹32.5 L (4.79%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RVJ CONSTRUCTIONS L1 | M K KANDASAMI L3 | KVCS CONSTRUCTIONS COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing Scrub jungle and destroying them effectively etc. complete complying with Standard Specifications and as directed by the Departmental Engineers. | 3,600 | sqm | 7 ₹25,200 Lowest | 7 ₹25,200 Lowest | 7 ₹25,200 Lowest |
| 2.00 | Earth work open excavating for foundation in all kinds of soils and sub soils and depositing on bank with intial lead of 10m and intial lift of 2m except hard rock requiring blasting to full depth as may be directed inclusive of shoring strutting ,bailing out water whenever necessary as per standard specification and as directed by the departmental officers. | 3,400 | cum | 116 ₹3,94,400 Lowest | 121 ₹4,11,400 | 118 ₹4,01,200 |
| 3.00 | Earth work open excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting as may be directed inclusive of shoring strutting ,bailing out water whenever necessary as per standard specification and as directed by the departmental officers. | 1,250 | cum | 206 ₹2,57,500 Lowest | 216 ₹2,70,000 | 210 ₹2,62,500 |
| 4.00 | Earth work open excavating and depositing on bank with initial lead of 10 m & initial lift of 2 m in medium rock and dense medium rock not requiring blasting as may be directed inclusive of shoring strutting ,bailing out water whenever necessary as per standard specification and as directed by the departmental officers. | 780 | cum | 362 ₹2,82,360 Lowest | 380 ₹2,96,400 | 369 ₹2,87,820 |
| 5.00 | Earthwork excavation for foundation in all kind of soils and sub soils to full depth except hardrock,medium rock,requiring blasting inclusive of shoring,strutting and bailing out water wherever necessary,refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and compacted and depositing the surplus excavated earth in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters clearing and levelling the site complete complying with standard specifications and as directed by the Departmental Engineers. (Narrow excavation) | 700 | cum | 247 ₹1,72,900 Lowest | 259 ₹1,81,300 | 252 ₹1,76,400 |
| 6.00 | Earthwork excavating for foundation depositing on bank with initial lead of 10m and initial lift of 2m Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting as may be directed inclusive of shoring, strutting ,bailing out water whenever necessary and refilling the sides of foundation with excavated earth as per standard specification and as directed by the departmental officers. | 370 | cum | 429 ₹1,58,730 Lowest | 449 ₹1,66,130 | 437 ₹1,61,690 |
| 7.00 | Earthwork excavating for foundation depositing on bank with initial lead of 10m and initial lift of 2m medium rock and dense medium rock not requiring blasting as may be directed inclusive of shoring, strutting ,bailing out water whenever necessary and refilling the sides of foundation with excavated earth as per standard specification and as directed by the departmental officers. | 290 | cum | 741 ₹2,14,890 Lowest | 776 ₹2,25,040 | 755 ₹2,18,950 |
| 8.00Supplying and erection of steel centering for sides and soffits with strutting up to 3m height for plain surface with all cross bracings using Mild Steel sheets of size 90cm. X 60cm. thickness of and B.G.10 stiffened with welded Mild Steel angles of size 25 X 25 X 3mm for boarding, laid over country wood joists of size 10cmX 6.5cm spaced at 90cm. Centre to centre and supported by casuarina props of 10 to 13cm dia (spaced at 75cm) Centre to centre etc. complete complying with Standard Specifications and as directed by the Departmental Engineers. | ||||||
| 8.01 | Below ground level with out strutting | 3,170 | sqm | 1,031 ₹32,68,270 Lowest | 1,080 ₹34,23,600 | 1,051 ₹33,31,670 |
| 8.02 | Above Ground Level with strutting | 1,720 | sqm | 1,144 ₹19,67,680 Lowest | 1,198 ₹20,60,560 | 1,165 ₹20,03,800 |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
16 Sept 2025, 11:00 amClosed
Superintending Engineer
Office of the Superintending Engineer, WRD, Middle Cauvery Basin Circle, Subramaniyapuram, Trichy-20
Construction of Check dam across Palar River in Akkiyampatti Village in Marungapuri Taluk ofTiruchirappalli District.
2025_WRD_599158_1
2/2025-26/DO1/MCBC25.08.25(8)
Open Tender
Civil Works
Lump-sum
Marungapuri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.3 L
28 Nov 2025
1 Sept 2025
18 Sept 2025
1 Sept 2025
16 Sept 2025
1 Sept 2025
Amount
Clearing Scrub jungle and destroying them effectively etc. complete complying with Standard Specifications and as directed by the Departmental Engineers.
Earth work open excavating for foundation in all kinds of soils and sub soils and depositing on bank with intial lead of 10m and intial lift of 2m except hard rock requiring blasting to full depth as may be directed inclusive of shoring strutting ,bailing out water whenever necessary as per standard specification and as directed by the departmental officers.
Earth work open excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting as may be directed inclusive of shoring strutting ,bailing out water whenever necessary as per standard specification and as directed by the departmental officers.
Earth work open excavating and depositing on bank with initial lead of 10 m & initial lift of 2 m in medium rock and dense medium rock not requiring blasting as may be directed inclusive of shoring strutting ,bailing out water whenever necessary as per standard specification and as directed by the departmental officers.
Earthwork excavation for foundation in all kind of soils and sub soils to full depth except hardrock,medium rock,requiring blasting inclusive of shoring,strutting and bailing out water wherever necessary,refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and compacted and depositing the surplus excavated earth in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters clearing and levelling the site complete complying with standard specifications and as directed by the Departmental Engineers. (Narrow excavation)
Earthwork excavating for foundation depositing on bank with initial lead of 10m and initial lift of 2m Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting as may be directed inclusive of shoring, strutting ,bailing out water whenever necessary and refilling the sides of foundation with excavated earth as per standard specification and as directed by the departmental officers.
Earthwork excavating for foundation depositing on bank with initial lead of 10m and initial lift of 2m medium rock and dense medium rock not requiring blasting as may be directed inclusive of shoring, strutting ,bailing out water whenever necessary and refilling the sides of foundation with excavated earth as per standard specification and as directed by the departmental officers.
Supplying and erection of steel centering for sides and soffits with strutting up to 3m height for plain surface with all cross bracings using Mild Steel sheets of size 90cm. X 60cm. thickness of and B.G.10 stiffened with welded Mild Steel angles of size 25 X 25 X 3mm for boarding, laid over country wood joists of size 10cmX 6.5cm spaced at 90cm. Centre to centre and supported by casuarina props of 10 to 13cm dia (spaced at 75cm) Centre to centre etc. complete complying with Standard Specifications and as directed by the Departmental Engineers.
Below ground level with out strutting
Above Ground Level with strutting
Providing and placing Plain cement concrete M10 grade using crushed broken hard granite course aggregate (well Graded) of Nominal maximum size of 40mm to Ls specified grading (to achieve the specified characteristicik strength of 10N /mm2 in 28 days) and mixing the ingredients in approved mixer including dewatering of the placement site by baling (pumping and dewatering wherever necess eng placing in layers and vibrating water curing finishing hte surface with all leades and lifts etc. complete complying with Standard Specifications and as directed by the Departmental Engineers. - Below Ground Level
Providing and placing Plain Cement concrete M15 grade using crusher broken hard granite course aggregate (well graded) of nominal maximum size of 20 mm and down graded to IS specified grading ( to achieve the specified characteristic strength of 15N/mm2 in 28 days) and mixing the ingredients in approved mixer placing in layers and vibrating , water curing , finishing the surface with all leads and lifts etc complete in all respects so as to attain the profile strength specified in the approved drawing and specifications etc., complete complying with standard specifications and as directed by the Departmental officers
Below ground level (upto 1.50m)
Below Ground level (1.50m to 4.50m)
Providing and placing Plain Cement concrete M15 grade using crusher broken ard granite course ageregate (well graded) of nominal maximum size of 40% of 20mm and 60% of 40 mm down graded to IS specified grading (to achieve the specified characteristic strength of 15N/mm2 in 28 days) and mixing the ingredients in approved mixer placing in layers and vibrating , water curing, finishing the surface with all leads and lifts etc, complete in all respects so as to attain the profile and strength specified in the approved drawing and specifications etc., complete complying with standard specifications and as directed by the Departmental Officers
Below Ground Level upto 1.50m
Above Ground Level (upto 4.50m)
Above Ground Level (4.50 m to 9.00) m
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Below ground level (up to 1.50 m)
Above ground level Upto 4.50 m
Providing and laying in position, Standardised Concrete Mix M-25 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS:456- 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kglm3 and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m’) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
Below Ground level Upto 1.50 m.
Below Ground level 1.50 m to 4.50m
Above Groung Level upto 4.5m
Supplying fabricating and placing in position of Mild Steel (MS) or Ribbed Tor Steel (RTS) of grills for all R C C works including cost of steel, binding wire and labour charges for decoiling cutting, bending and tying the grills etc. complete complying with standard specifications and as directed by the Departmental Engineers.
Supplying and filling in foundation, basement, etc with filling M- sand in layers of not more than 15 cm thick well watered, consolidation etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in position of 40cm thick graded metal using 20mm,40mm and 63 mm Hard Blue Granite jelly for longitudinal and transverse filter as etc., complete complying with standard specification and as directed by the Departmental Officers.
Manufacturing, supplying and fixing of cement concrete blocks of size 1.50x1.50x0.9 M in M15 using 40mm and 20mm hard broken granite stone jelly including cost of moulding charges, casting of slabs, finishing, curing and fixing in position and transportation etc., complete complying with standard specification and as directed by the Departmental Officers.
Supplying and Filling of Gravel inbetween the gap of CCBlock with 75mm thick,etc..complying with standard specification and directed by the departmental engineers in charge of the work.
Supplying and filling loose boulders of Size more than 300mm and weight more than 40kg in U/S and D/S apron using including conveyance,cost of materials etc.complying with standard specification and as directed by the departmental officers incharge of the work
Rough stone dry packing for apron and revetment using new stones for upstream and downstream return walls etc.,complete complying with standard specification and as directed by the Departmental Officers.
Supplying and Fixing of PVC Water bar 150mm with single bulp including cost of required accessories as directed by the departmental officers.
Supplying and Fixing of Bitumen pad 20mm thick for wall including fixing charges and cost of required accessories etc., complete and as directed by the departmental officers.
Supplying and fixing in position of seepage pipes of 100 mm dia PVC pipe having work pressure 4 Kg/cm2 required lengths with required filter media (excluding the cost of filter media) for abutment and wings including cost and conveyance of all materials to work site and labour charges for fixing etc.,complete. complying with standard specification and as directed by the Departmental Officers.
Dewatering using 7.5 HP diesal Engine pumpset inlcuding hire charges ,cost of diesel, Engine oil, pump operator, labour charges , conveyance of pumpset and fuel to site and back, loading and unloading anyother incidental charges etc., complete complying with standard specification and as directed by the Departmental Officers.
Supplying demarcation R.C.C. pre cast post in Cement concrete M20 grade with well graded aggregates and the nominal maximum size of coarse aggregate of size 20 mm of size 0.15 x 0.15 x 1.20 M and fixing the post 45 cm depth below ground level, the post includes using 4 numbers of 8 mm RTS main rod to a length of 1.325 M, using 6 mm MS 9 numbers as strrups with steel centering and painting the post with enamel paint to a height of 0.80 M alround the post etc. complete and conveying the post to the site of demarcation boundary such as tank bund and foreshore including earth work excavation for foundation in HSC, and the post embedded by using Cement concrete M7.5 grade with well graded aggregates and the nominal maximum size of coarse aggregate of 40 mm, as per the direction of the Engineers and complying with standard specification.
Earthwork excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on bank including the jungle clearence etc., complete. complying with standard specifications and as directed by the departmental officers.
Clearing the Julifloora with uprooting destroying them effectively as directed by the departmental officers.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m and extra lead of 200m deploying earth moving machineries and tippers including benching,formation of bunds,breaking clods, sectioning, compaction of power roller etc.complete complying with standard specifications and as directed by the departmental officers
Fabricating, Supplying and erection of Screw gearing steel shutters of size above 1.00 m and upto 2.00m width consist of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 100x50mm mild steel channel at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm thick mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipment. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc.complete complying with standard specifications and as directed by the departmental officers
Supplying and fixing of Head Set Assembly Heavy duty with hexagonal nut (Approximate 120 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assembly to the work site. Fixing the head set assembly to the top beam by using required rust free bolts and nuts in proper alignment including dismantling the existing damaged Head set assembly, conveying and stacking at section Store. The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc. complete complying with Standard Specifications and as directed by the Departmental Engineers.
Fabricating, Supplying and fixing of Top Beam made up of 200x100mm (ISMB 200) duly drilled to suit the Head Set Assembly with required bed bolt made out of 25mm mild steel round rod duly threaded with suitable anchorage arrangements to a height of 0.60m with necessary Fish plate made out of 16mm mild steel plate of size 0.20x 0.30m 2 Nos with required holes. Conveying and leading the top beam arrangements to the work site. Fixing the top beam arrangements at the top of the vent in correct position including dismantling the existing eroded top beam, conveying and stacking and the section stores. The top beam should be painted with two coats of AC black paint over one coat of Red Oxide primer. The Rate including cost of materials, labours, charges for all fabricating and hoisting equipments, cost of petty civil works conveyance charges for labours and materials and warranty for 5 years etc. complete complying with Standard Specifications and as directed by the Departmental Engineers.
Fabricating, supplying and fixing of Shutter Groove Angle made up of 100x100x10mm Mild Steel angle for required height including welding hold fast of size 40x40x6mm Mild steel angle 3 Nos on both sides and conveying and leading the groove angle to the vents. Fixing the angle to the grooves in proper alignment including dismantling the existing damaged groove angles, conveying and stacking at section store. The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, consumables, labours, charges for all fabricating and hoisting equipments, conveyance, petty civil works and warranty for 5 years etc. complete complying with Standard Specifications and as directed by the Departmental Engineers.
Fabricating, supplying and fixing of 80mm dia Screw Rod made up of Mild Steel duly machined and fully threaded to suit the Head set Assembly and provided with required holes. Conveying and leading the screw rod to the worksite. Fixing the screw rod to the shutter gusset plate with required bolt and nut in proper alignment to the head set including dismantling the existing damaged screw rod, conveying and stacking at section store. The Screw rod should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for all fabricating and hoisting equipments, conveyance charges for labours and materials and warranty for 5 years etc. complete complying with Standard Specifications and as directed by the Departmental Engineers.
GST at 18%
KVCS CONSTRUCTIONS COMPANY (BID ID -1459553)
M K KANDASAMI (BID ID -1459524)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .