| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC | ₹34.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹37.5 L+₹2.8 L (8.15%)Rejected-AOC | ₹37.5 L+₹2.8 L (8.15%) | L2 | Rejected-AOC L2 |
| 3 | L3₹39.1 L+₹4.4 L (12.8%)Rejected-AOC 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹39.1 L+₹4.4 L (12.8%) | L3 | Rejected-AOC L3 |
| 4 | L4₹40.0 L+₹5.3 L (15.2%)Rejected-AOC A 5 ACHARYA NIKETAN PATPARGANJ MAYUR VIHAR PHASE 1 DELHI 1100091 | 1100091 | ₹40.0 L+₹5.3 L (15.2%) | L4 | Rejected-AOC L4 |
| 5 | L5₹41.4 L+₹6.7 L (19.2%)Rejected-AOC | ₹41.4 L+₹6.7 L (19.2%) | L5 | Rejected-AOC L5 |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
10 Dec 2019, 3:00 pmClosed
DGM C and P
Admin Building Omkareshwar Power Station NHDC Limited Khandwa MP
Painting of Spillway Stop Logs Gates (02 Sets) at Omkareshwar Power station
2019_NHDC_519941_1
NHDC/3/C/033/NIT- 403/19/2719 Dated 18.11.2019
Open Tender
Civil Works
Works
90 days
Omkareshwar Power Station
Please refer Tender documents.
12 documents required · 12 mandatory
₹590
Yes
NHDC Limited
₹89,000
Yes
12 Mar 2020
19 Nov 2019
16 Dec 2019
19 Nov 2019
10 Dec 2019
19 Nov 2019
19 Nov 2019 - 3 Dec 2019
Amount
Painting of Spillway gates, sluice gates, canal gates (both vertical or radial), stop log gates, exposed embedded parts and all unmachined ferrous surface (hoist cylinders, cylinder heads, hydraulic pipeing, pipe fittings, bonnet covers), exposed to water as per IS 14177, for which surface preparation by blast cleaning of class "B" primer coat (one coat) of inorganic zinc silicate (preferably airless spary) or alternatively, two coats of zinc rich primer (containing not less than 85% zinc on dry film) to give dry film thickness of 70 ± 5 micron and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150±5 micron per coats. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 350 microns, this will be include expenses on mobilisation and demobilisation of equipments. For maintenance painting the surface preparation shall be done by appropriate hand and power tool cleaning, prior to hand power tool cleaning. Any heavy layer of rust should be removed by chipping visible oil, grease, dirt and other foreign material be cleaned using solvents like clean minerla sprits, xylot or white gasoline. After hand and power tool cleaning the surface should be cleaned of loose dust and debris and /or blast cleaned as laid down in para 7.0 of IS code 14177. After the surface preparation the primer and finishing coats shall be carried out as provided above for painting etc. complete upto 1.50 Meters Height.
M/S GALA CONSTRUCTIONS
MULTITECH ENGINEERS
VASU INFRATECH PVT. LTD.
Pioneer Diligence
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .