Tender Value
₹23.8 L
EMD Value
₹47,600
Closing Date
7 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
TRD BSP
190 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
GENERAL INSTRUCTIONS TO TENDERERS For e-Tenders
E-tender have been invited for and on behalf of the President of India through website www.ireps.gov.in for the work mentioned against the tender notice number available in the website. Tenderers are to bid online only in the above mentioned website. All Mandatory fields marked with (*) have to be filled in by the tenderer. No Manual offer is acceptable against this tender. No Tender document in hard copy will be sold against this tender Please read the Instructions to Tenderers for e- tendering, General Conditions of Contract, Special Condition of Contract before filling the e-tender through online.
E-Tender forms are not transferable and the same is to be submitted with digital signature by the Tenderer already registered with the site.
The submitted e-tender forms will be considered as digitally signed by the tenderer as a confirmation from the tenderer that the tenderer has read, agreed and accepted all the conditions and laid down documents as well as Schedule of Tender, General and Special Conditions.
The tender offer complete in all respect and with all documents is to be submitted online by e-tendering process through the website www.ireps.gov.in before the closing time/date of this tender as mentioned in the NIT (Notice Inviting Tender). Tenderer can revise the bids any number of times till the closing time/date of the tender. No manual offers shall be accepted.
The Railway may, of its own or in response to any clarification requested/suggested by any person including that from the tenderer, may modify this tender document at its sole discretion at least 15 days before the due date of closing of the tender as corrigendum.
Corrigendum as required may be issued atleast 15 days prior to the closing of the tender. These corrigenda of this tender, if any, as issued time to time will be available on website at least 15 days in advance of closing of tender. The tenderers are requested to check the website before submitting their offer whether any such corrigendum to the tender has been issued or not and revise the offer if required accordingly. Failure on the part of tenderer on this aspect will be solely tenderers responsibility.
This document is the Standard Tender Document which consists of the Instruction to the Tenderers, NIT (Notice Inviting Tender), General Conditions of the Tender, Special conditions of the tender, Tender schedules, Specifications of the works & various Annexures etc. All the above mentioned documents taken together if not scored off, shall constitute the complete tender document hereafter referred to as Tender Document & have to be read together & acted upon accordingly. No part of the tender document can be relied upon or acted upon in isolation.
The Railway and the website will have no responsibility for incorrect evaluation of cost and thereby incorrect cost of work and ranking of tenderers, if the schedule is not filled in correctly and unambiguously for each item. No claim or clarification of a tenderer regarding applicability, inclusion or exclusion of any element of tax or duty or any other change in the offer subsequently (after opening of the tender) will be entertained. For this the tenderers are advised to read the Instructions, General Conditions, Special Conditions and other Instructions carefully before submission of tender.
In case of any problem with the portal is faced while filling the e-tender, Tenderers are advised to contact with the Helpdesk of IREPS portal who will render all help and assistance related with the website and portal except that related with the details of the tender. Railway will not take any responsibility for non- participation in the e-tender online for the reasons related to the website and portal or server etc beyond the control of railways.
Railway and the IREPS website will not take the responsibility for any online payment made by the tenderer and debited from his/their account towards the tender cost or Earnest Money/Bid security due to wrong or mismanipulation or any reasons related with the IT or found unsuitable for the tender etc. In this regard Railway and IREPS website will not entertain any claim or refund the paid amount.
All documents uploaded or information furnished in the website are digitally signed by the competent authority.
TENDERERS POSTAL ADDRESS
Address of tenderer: The address, email - Id and Mobile phone, other phone nos. and other details given in the portal while registering will be considered as official address and all correspondences to the tenderer will be made in these registered modes. All communication sent in time to the tenderer by post at the said address shall be deemed to have reached the tenderer duly and in time. Important documents shall be sent by Registered Post. However, an undertaking has to be given in the enclosed annexure by uploading a scanned copy of duly filled in form in the portal.
THE SCHEDULE OF WORKS
The Schedules of Works is also available seperately in the website online and Rates are to be quoted online and submitted online duly signed digitally.
INSPECTION OF DATA
Drawings for the work can be seen in the office inviting this tender on any working day during working hours. The drawings are only for the guidance of tenderers. Detailed working drawings, if required based on the drawings mentioned above, will be given by the Engineer or his representative from time to time.
OPENING OF TENDER
Opening of e-tender online:- The e-tenders will be opened online using the IREPS portal. No representative is required to be present for opening of tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders in the website after the opening of the tender.
In case the date of closing mentioned in the Notice Inviting Tender is declared a holiday/bandh/strike etc. on any account, the date of closing tender online will not be changed as the application in the website of IREPS does not permit submission of any offer after closing date and time of the tender. However, opening of tenders online will be on any convenient day after the closing date/time of tenders.
SUBMISSION OF DOCUMENTS IN SUPPORT OF ELIGILIITY CRITERIA
All documents in support of fulfillment of the eligibility criteria with respect to completion of Similar nature of work for Technical Eligibility Criteria and Total gross contractual receipt value for Financial Eligibility Criteria should be uploaded online in the website with scanned copy in pdf format at the time of tender bidding with details showing in the Annexures.
SUBMISSION OF COST OF TENDER FORM & Bid Security (EMD):
E-Tender Forms shall be issued free of cost to all tenderers.
Tender must be accompanied with Bid security (EMD) of requisite amount as mentioned in NIT in A/c of F.A.& C.A.O.,S.E.C.Railway, Bilaspur deposited through Internet Banking or payment gateway only. (i) Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall beexempted from payment of earnest money deposit detailed above. (ii) 100%Govt. owned PSUs shall be exempt from payment of earnest money depositdetailed above. (iii) Labour Cooperative Societies shall deposit only 50% ofabove earnest money deposit detailed above.
The Bid Security shall be deposited either in cash through epayment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90 days beyond the bid validity period.
SOUTH EAST CENTRAL RAILWAY TENDER FORMS (FIRST SHEET)
I/ We have read the various conditions to tender attached hereto and have agreed to abide by the said conditions. I/ We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same and in default thereof, I/ We will be liable for forfeiture of my/ our "Bid security". I/ We offer to do the work for South East Central Railway, at the rates quoted in the attached schedule and hereby bind myself/ ourselves to complete the work in all respects within 06 months from the date of issue of letter of acceptance of the tender.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up-to-date for the present contract.
A sum of Rs. (as mentioned in NIT of this instant tender) has already been deposited online/ submitted as Bank Guarantee bond as Bid security. Full value of the Bid security shall stand forfeited without prejudice to any other right or remedies in case my/our tender is accepted and if:- (a) I/We do not submit the Performance Guarantee within the time specified in the Tender document; (b) I/We do not execute the contract documents within seven days after receipt of notice issued by the Railway that such documents are ready; and (c) I/We do not commence the work within fifteen days after receipt of orders to that effect.
I/We am/are a Startup firm registered by ........................ Department of Industrial Policy and Promotion (DIPP) and my registration number is ................ valid upto ...................... (Copy enclosed) and hence exempted from submission of Earnest Money.
We are a Labour Co-operative Society and our Registration No. is .................... with.......................and hence required to deposit only 50% of Earnest Money.
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
TENDER FORM (SECOND SHEET)
Instructions to tenderers and conditions of tender: - The following documents form part of Tender/Contract:
Tender forms- First sheet and second sheet.
Special Conditions/Specifications (enclosed)
Schedule of approximate quantities (enclosed)
Standard General Conditions of Contract and Standard Specifications (Works and Materials) of Indian Railways as amended/corrected upto latest correction slips, copies of which can be seen in the office of Sr. Divl. Electrical Engineer (Tr-D) or obtained from the office of the Chief Engineer, S E C Railway on payment of prescribed charges.
Schedule of Rates as amended / corrected upto latest correction slips, copies of which can be seen in the office of Sr. Divl. Electrical Engineer (Tr-D) or obtained from the office of the Chief Engineer, S.E.C. Railway on payment of prescribed charges.
All General and detailed drawings pertaining to this work will be issued by Sr.DEE(Tr-D)/BSP or the representative (from time to time) with all Changes and modifications.
Drawings for the Work: The Drawing for the work can be seen in the office of the Sr. Divl. Electrical Engineer (Tr-D) and / or Chief Engineer, S.E.C. Railway at any time during the office hours. The drawings are only for the guidance of Tenderer(s). Detailed working drawings (if required) based generally on the drawing mentioned above, will be given by the Engineer or his representative from time to time.
The Tenderer(s) shall quote his / their rates as a percentage above or below the Schedule of Rates of S.E.C. Railway as applicable to Bilaspur Division except where he/they are required to quote item rates and must tender for all the items shown in the Schedule of approximate quantities attached. The quantities shown in the attached Schedule are given as a guide and are approximate only and are subject to variation according to the needs of the Railway. The Railway does not guarantee work under each item of the Schedule. The tenderer(s) shall quote rates / rebates only at specified place in Tender Form supplied by Railway. Any revision of rates / rebates submitted (quoted) through a separate letter whether enclosed with the bid (Tender Form) or submitted separately or mentioned elsewhere in the document other than specified place shall be summarily ignored and will not be considered. Tenders containing erasures and / or alterations of tender documents are liable to be rejected. Any correction made by tender(s) in his/their entries must be attested by him / them.
The works are required to be completed within a period of 06 months from the date of issue of acceptance letter.
Bid Security (EMD):-
(a) Subject to exemptions provided under para 5(1) (a) of Part-1 (ITT) of GCC, the tender must be accompanied by a Bid Security as mentioned in tender documents, failing which the tender shall be summarily rejected.
(b) The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90 days) from the date of closing of the Tender. It is understood that the tender documents have been issued to the Tenderer(s) and the Tenderer(s), is / are permitted to tender in consideration of the stipulation on his / their part that after submitting his / their tender subject to the period being extended further, if required by mutual agreement from time to time, he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to S.E.C. Railway. Should the tenderer fail to observe or comply with the foregoing stipulation, the amount deposited or Bank guarantee bond submitted as Bid Security for the due performance of the above stipulation, shall be forfeited to the Railway.
(c)If his tender is accepted, (i)the Bid Security mentioned in sub para(a) above deposited in cash through e-payment gateway will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract; (ii)the Bid Security mentioned in sub para(a) above submitted as Bank guarantee bond, will be encashed as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation to the Bid Security that may happen thereto while in their possession, nor be liable to pay interest thereon.
(d)In case Contractor submits the Term Deposit Receipt/Bank Guarantee Bond towards either the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security so retained as per sub para(c) above, to the Contractor.
Rights of the Railway to deal with Tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender, and tenderer(s) shall neither demand any explanation for the cause of rejection of his/ their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders.
If the tenderer(s) deliberately gives / give wrong information in his / their tender or creates / create circumstances for the acceptance of his / their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer(s) expire(s) after the submission of his / their tender or after the acceptance of his / their offer, the Railway shall deem such tender cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled, unless the firm retains its character.
Tenderers credentials: Documents testifying tenderer previous experience and financial status should be produced alongwith the tender. Tenderer(s) who is / are not borne on the approved list of the Contractors of S.E.C. Railway shall submit alongwith his / their tender:
Certificates and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
Audited Balance Sheet duly certified by the Chartered Accountant etc regarding contractual payments received in the past.
The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway thereunder.
(a) In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Bid security besides banning of business for a period of upto five years. (b) In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Bid security, Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
A copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted alongwith bid are true and factual. Standard format of the certificate to be submitted by the bidder is enclosed in tender document. Non submission of a copy of certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document.
Non compliance with any of the conditions set forth there in above is liable to result in the tender being rejected.
Execution of Contract Documents: The successful Tenderer(s) shall be required to execute an agreement with the President of India acting through the Sr.DEE (Tr-D), S.E.C. Railway for carrying out the work according to Standard General Conditions of Contract, Special Conditions / Specifications annexed to the tender and Standard Specifications for (Works and Materials) of Railway as amended/corrected upto latest correction slips, mentioned in tender form (First Sheet).
Documents to be Submitted Along with Tender:-
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
Following documents shall be submitted by the tenderer:
(a)Sole Proprietorship Firm: (i)All documents in terms of Para 10 of the GCC 2022 Tender Form (Second Sheet) above.
(b)HUF: (i)A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and 19.2.2 he has the authority, power and consent given by other members to act on behalf of HUF. (ii)All other documents in terms of Para 10 of the GCC 2022 Tender Form (Second Sheet) above.
(c)Partnership Firm: (i)All documents as mentioned in para18 of the GCC 2022 Tender Form (Second Sheet).
(d)Joint Venture (JV): All documents as mentioned in para 17 of the GCC 2022 Tender Form (Second Sheet).
(e)Company registered under Companies Act2013: (i)The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii)A copy of Certificate of Incorporation (iii)A copy of Authorization/Power of Attorney 19.2.5 issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv)All other documents in terms Para 10 of the GCC 2022 Tender Form (Second Sheet) above.
(f)LLP (Limited Liability Partnership): (i)A copy of LLP Agreement (ii)A copy of Certificate of Incorporation (iii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from 19.2.6 participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (v)All other documents in terms of Para 10 of the GCC 2022 Tender Form (Second Sheet).
(g)Registered Society & Registered Trust: (i)A copy of Certificate of Registration (ii)A copy of Memorandum of Association of Society/Trust Deed (iii)A copy of Power of Attorney in favour of 19.2.7 the individual to sign the tender documents and create liability against the Society/Trust. (iv)A copy of Rules & Regulations of the Society (v)All other documents in terms of Para 10 of the GCC 2022 Tender Form (Second Sheet) above.
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender.
After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society / HUF etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted.
A tender from JV / Partnership firm etc. shall be considered only where permissible as per the tender conditions.
The Railway will not be bound by any change in the composition of the firm made subsequent to the submission of tender. Railway may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
Employment/Partnership etc. of Retired Railway Employees:
Should a tenderer i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc. have as one of its partners a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender THEN the tenderer will give full information as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender.
In case, upon successful award of contract, should a tenderer depute for execution of the works under or to deal matters related with this contract, any retired Engineer of gazette rank or retired gazetted officer working before his retirement in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, and now in his employment, then the tenderer will ensure that retired Engineer or retired gazetted officer had retired from government service at least 1 year prior to the date of his employment with tenderer and in case he had retired from service within a year then he possesses the requisite permission from the President of India or any officer, duly authorized by him in this behalf, to get associated with the tenderer.
Should a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons.
Note:- If information as required as per 20.1, 20.2 or 20.3 above has not been furnished, contract is liable to be dealt in accordance with provision of clause 62 of Standard General Condition of contract.
The contactor shall employ the following technical staff during the execution of this work: -
One qualified Graduate Engineer when the cost of the work to be executed is Rs.2 Crore and above.
One qualified Diploma Holder when the cost of the work to be executed is more than Rs.25 Lakhs but less than Rs.2 Crore.
Technical staff should be available at site whenever required by the Engineerin- charge to take instructions. In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to deduct or to pay an amount of Rs.40,000/- (Rupees Forty Thousand Only) for each month or part thereof for the default period in case of graduate engineer and Rs.25,000/- (Rupees Twenty five Thousand Only) for each month or part thereof for the default period in case of Diploma Holder (oversear).
The contractor shall furnish the relevant details/documents of technical staff proposed to be engaged by him within 15 days of issue of acceptance letter.
Technical personal engaged by the contractor shall regularly sign the site order book.
Conditions of Prices and Payment Terms:
Unit Prices: The rate quoted by the tenderer and accepted by the purchaser shall hold good till the completion of the work and no additional individual claim will be admissible on account of fluctuation in market rates or due to changes in tax structures.
The rate quoted by the tenderer shall include the cost of materials, all taxes and GST, erection, testing and commissioning including all incidental charges like freight, transport, loading/unloading, handling of materials, lifting, descent, insurance coverage or Bankers charges, Indemnity Bond etc. "D" form will be issued by the Railways only for items covered under supply portion of the contract on demand.
Terms and conditions to be followed by contractors
Obligation of the contractors :- The contractor shall fully comply with the following enactments:
(a)Contract labour (R & A) Act, 1970 and rules formed there in under the Central labour Department.(b)Wage Rates not less than that notified by Central/State labour Department from time to time.(c)Payment of wages Act.(d)ESI Act, 1948 and contribution of Employer/Contractor @ 3.25% of wages or latest. 23.1.1 (e) EPF & MP Act. 1952 and contribution of Employer / Contractor @ 13.00% of wages or latest.(f) Workmans compensation Act, 1923.(g)SECR instructions as issued from time to time in regard to working hours, holidays, or any other statutory provision.
The contractor shall obtain license from the assistant labour commissioner (Central), or appropriate government if he engages twenty or more workmen only.
The Contractor shall produce the following registers and forms before commencement of work, for verification by the Executing Officer. (a) Form XII - Register of contractors (b) FormXIII - Register of workmen employed by contractor (Rule 75) (c) FormXIV - Employment card issued by contractor (Rule 76) (d) FormXVI - Muster Roll (Rule 78(1)(a)(i) ) (e) FormXVII - Register of wages (Rule 78(1)(a)(i) ) (f) FormXVIII - Register of wages cum Muster Roll (in case of weekly payment ). (g) FormXIX - Wage slip (Rule 78(b)) (h)FormXX - Register of deduction for damages or loss (Rule 78(1)(a)(ii)). (i) FormXXI - Register of fines (Rule 78 (1)(a)(ii)) (j) FormXXII - Register of advances (Rule 78(1)(a)(ii)) (k) FormXXIII - Register of overtime (Rule 78(1)(a) (iii)) (l) FormXXIV - Return to be sent by the contractor to licensing officer (Rule 82(1))
The contractor shall maintain the above neatly, completely and legibly for inspection by various authorities even at short notice. The Executing Officer/staff Welfare inspectors of Bilaspur 23.3.1 Division of SECR shall periodically inspect these registers and forms, and shall send his inspection note to contract labour implementation cell of Sr.DPO/BSPs office.
The contractor shall observe weekly rest day according to normal norms.
Contractor shall obtain complete bio-data of the labour employment certificate and antecedent verification in the prescribed form for each labour and supervisor engaged by him and shall submit the same to the personnel department/IR section through the contract executing officers before commencement of the work.
Every contractor shall submit a notice regarding commencement and completion of work in Form-VI A & B [Rule 25(viii) & 81(3)] to personnel department, through his contract executing officer, for forwarding the same to Central Labour Department
The contractor shall make himself or his representative available at the work spot everyday during execution of work, for effective supervision
The contractor shall attend to all inspections notified/conducted by the personnel department, Labour department, P.F. authorities. Factory Inspectors, ESI inspectors or any other such authorities.
Non-compliance of any provision under the act/rule/instructions/guidelines shall make the contractor liable for penal action including termination of contract
Contractor shall in his absence keep competent agent constantly on the works and any directions or explanations 23.10 given by the Contract Signing Officer or his representative to such agent shall be held to have been given to the contractor himself.
The contractor shall give all notices required by the acts, regulation, By laws, legal acts and pay all fees in connection therewith unless and other wise arranged and decided in writing with SECR. In all such cases, contractor shall protect and 23.11 indemnify SECR against any claim or liability arising from or based on the violation of any such laws, ordinance, regulations, orders, decrees or attachment either by himself or by his employees.
It shall be contractors sole responsibility to protect the public and his employees against accident from any cause and provide required safety equipments and shall indemnify SECR against 23.12 any claims for damages for injury to the person or property resulting from any such accidents and losses shall, where the provisions of the workmens compensation Act apply, take steps to properly insure against any claims there under.
In the event of any accident in respect of which compensation may become payable under the workmens compensation Act VIII of 1923 whether by the contractor or by Principle-Employer 23.13 it shall be lawful for Bilaspur Division of SECR to retain out of monies due and payable to the contractor such sum or sums of money as may, in the opinion of SECR shall be final in regard to all matter arising in this clause.
The contractor shall keep his work place clean and safe to avoid injuries to men and damage to finished products/equipments.
On the occurrence of an accident, which result in the death of any of the workmen employed by the contractor or which is so serious as to be likely to result in the death of any such 23.15 workmen, the contractor shall within 24 hours of the happening of such an accident intimate in writing to the Principal Employer or official in charge of the work.
The contractor shall ensure abidance by all the labour laws especially including contract labour (R&A) Act, payment of 23.16 wages Act workmens compensation Act, minimum wages Act, ESI Act and provident fund act as amended from time to time, and contributes @ 3.25% of wages in favour of Labours.
The contractor shall comply with provident fund Act either through PF code allotted to him or by the code provided by PF 23.17 Department where 20 or more labours are engaged and contributes @ 13.00% of wages in favour of Labours.
The contractor should engage only those labourers who shall be more than 18(eighteen) years of age.
The contractor shall provide the required safety equipment to the labours engaged by him
Contractor shall issue Employment Card as per status to all labour and supervisors covered under the job work contract.
Contractor must ensure that payment of wages to workmen 23.21 should be made in presence of representative of Principal Employer or in presence of Staff welfare inspector.
No work shall be done on Sunday or on declared rest day by contractor.
The contractor shall be responsible to settle any grievances of the labour deployed by him.
Security Deposit:
The Earnest Money/Bid security deposited by the Contractor with his tender will be retained by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. The Security Deposit shall be 5% of the contract value. Security Deposit may be deposited by the Contractor before release of first on account bill in cash or Term Deposit Receipt issued from Scheduled Bank, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract.
The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract.
Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Refund of Security Deposit: Security Deposit mentioned in sub clause (1) above shall be returned to the Contractor after the following: (a)Final Payment of the Contract as per clause 51.(1) and (b)Signature of Final Supplementary Agreement or Certification by Engineer that Railway has No Claim on Contractor and (c)Issue of Maintenance Certificate on expiry of the maintenance period as per clause 50.(1).
Forfeiture of Security Deposit: Whenever the contract is rescinded as a whole under clause 62 (1) of GCC, the Security Deposit already with railways under the contract shall be forfeited. However, in case the contract is rescinded in part or parts under clause 62 (1) of GCC, the Security Deposit shall not be forfeited. 16.(3)No interest shall be payable upon the Earnest Money and Security Deposit or amounts payable to the Contractor under the Contract, but Government Securities deposited in terms of Sub-Clause 16.(4)(b) of this clause will be payable with interest accrued thereon.
Performance Guarantee (P.G.): The procedure for obtaining Performance Guarantee is outlined below:
(a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
(B) The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% (Five percent) of the contract value: (a) A deposit of Cash. (b) Irrevocable Bank Guarantee. (c) Insurance Surety Bond as per Annexure-XVII. Note: (1) The provision of Insurance Surety Bond shall be for all contracts having DOC within 36 months only. (2) In case DOC extends beyond 36 months, fresh Insurance Surety Bond or any other form of Performance Guarantee prescribed in GCC for the balance amount shall be submitted by agency, otherwise necessary action will be taken as per terms of Agreement. (d) Government Securities including State Loan Bonds at 5% below the market value. (e) Pay Orders & Demand drafts tendered by any Scheduled Commercial Bank of India; (f) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Banks of India. (g) A Deposit in the Post Office Saving Bank. (h) A Deposit in the National Savings Certificates. (i) Twelve years National Defence Certificates. (j) Ten years Defence Deposits. (k) National Defence Bonds and (l) Unit Trust Certificates of 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO/ SECR/Bilaspur may be accepted.
(c)The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days.
(d)The value of PG to be submitted by the Contractor is basedon original contract value and shall not change due tosubsequent variation(s) in the original contract value. (e)ThePerformance Guarantee (PG) shall be released after physicalcompletion of the work based on 'Completion Certificate' issuedby the competent authority stating that the Contractor hascompleted the work in all respects satisfactorily. (f)Wheneverthe contract is rescinded, the Performance Guarantee alreadysubmitted for the contract shall be encashed. (g)The Engineershall not make a claim under the Performance Guarantee exceptfor amounts to which the President of India is entitled under thecontract (not withstanding and/or without prejudice to any otherprovisions in the contract agreement) in the event of: (i)Failureby the Contractor to extend the validity of the PerformanceGuarantee as described herein above, in which event theEngineer may claim the full amount of the PerformanceGuarantee. (ii)Failure by the Contractor to pay President of Indiaany amount due, either as agreed by the Contractor ordetermined under any of the Clauses/Conditions of theAgreement, within 30 days of the service of notice to this effectby Engineer. (iii)The Contract being determined or rescindedunder clause 62 of these conditions.
If a tender is accepted on the quoted rates of bidder whichisbelow the advertised tender value, an additionalperformancesecurity shall be submitted by the bidder 25.4.1 as below:(i)Bidquoted in % of advertised cost: Below 0 (Zero) - 5%(inclusive)=Nil (ii)Bid quoted in % of advertised cost: Below 5%=5%
The Performance Guarantee (PG) shall be released afterphysical completion of the work based on 'CompletionCertificate' issued by the competent authority stating that theContractor has completed the work in all respects satisfactorily.
Whenever the contract is rescinded, the Performance Guaranteealready submitted for the contract shall be encashed in additionto forfeiture of Security Deposit available with railway
The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i)Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii)Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii)The Contract being determined or rescinded under clause 62 of the GCC
VARIATIONS IN EXTENT OF CONTRACT:
Modification to Contract to be in Writing: In the event of any of the provisions of the contract required to be modified after the contract documents have been signed, the modifications shall be made in writing and signed by the Railway and the Contractor and no work shall proceed under such modifications until this has been done. Any verbal or written arrangement abandoning, modifying, extending, reducing or supplementing the contract or any of the terms thereof shall be deemed conditional and shall not be binding on the Railway unless and until the same is incorporated in a formal instrument and signed by the Railway and the Contractor, and till then the Railway shall have the right to repudiate such arrangements.
Powers of Modification to Contract: The Engineer on behalf of the Railway shall be entitled by order in writing to enlarge or extend, diminish or reduce the works or make any alterations in their design, character position, site, quantities, dimensions or in the method of their execution or in the combination and use of materials for the execution thereof or to order any additional work to be done or any works not to be done and the Contractor will not be entitled, to any compensation for any increase/reduction in the quantities of work but will be paid only for the actual amount of work done and for approved materials supplied against a specific order.
Unless otherwise specified in the special conditions of the contract, the accepted variation in quantity of each individual 26.2.1 item of the contract would be upto 25% of the quantity originally contracted, except in case of foundation work.
The Contractor shall be bound to carry out the work at the agreed rates and shall not be entitled to any claim or any 26.2.2 compensation whatsoever upto the limit of 25% variation in quantity of individual item of works.
In case an increase in quantity of an individual item by more than 25% of the agreement quantity is considered unavoidable, then same shall be executed at following rates (a)Quantities operated in excess of 125% but upto 140% of the agreement quantity of the concerned item, shall be paid at 98% of the rate awarded for that item in that particular tender; (b)Quantities operated in excess of 140% but upto 150% of the agreement quantity of the concerned item shall be paid at 96% of the rate awarded for that item in that particular tender; (c)Variation in quantities of individual items beyond 150% will be avoided and would be permitted only in exceptional unavoidable circumstances and shall be paid at 96% of the rate awarded for that item in that particular tender. (d)Variation to quantities of Minor Value Item: The limit for varying quantities for minor 26.2.3 value items shall be 100% (as against 25% prescribed for other items). A minor value item for this purpose is defined as an item whose original agreement value is less than 1 % of the total original agreement value. d.(i) Quantities operated upto and including 100% of the agreement quantity of the concerned minor value item, shall be paid at the rate awarded for that item in that particular tender; d.(ii)Quantities operated in excess of 100% but upto 200% of the agreement quantity of the concerned minor value item, shall be paid at 98% of the rate awarded for that item in that particular tender; d.(iii) Variation in quantities of individual minor value item beyond 200% will be avoided and would be permitted only in exceptional unavoidable circumstances and shall be paid at 96% of the rate awarded for that item in that particular tender.
In case of earthwork, the variation limit of 25% shall apply to the gross quantity of earthwork and variation in the quantities 26.2.4 of individual classifications of soil shall not be subject to this limit.
In case of foundation work, no variation limit shall apply and the 26.2.5 work shall be carried out by the Contractor on agreed rates irrespective of any variation.
As far as Standard Schedule of Rates (SSOR) items are concerned, the variation limit of 25% would apply to the value of SSOR schedule(s) as a whole and not on individual SSOR 26.2.6 items. However, in case of Non Standard Schedule of Rates (SSOR) items, the limit of 25% would apply onthe individual items irrespective of the manner of quoting the rate (single percentage rate or individual item rate).
Explanatory Note: Explanatory Notes for various items of works included in the schedule are enclosed to this tender paper. Tenderer should carefully read and include all the cost of materials and erection, testing and commissioning as clearly explained in the Explanatory Note.
Inspection of the materials: All materials to be supplied by the Contractor have to be duly inspected by RDSO/RITES or authorized representative of Sr.DEE/Tr-D/Bilaspur. No payment will be made unless the Inspection Certificate has been submitted along with Supplier's original Challans. The materials have to be procured only from approved sources, as mentioned elsewhere in the Tender documents.
Terms of payment: Subject to any deductions or recoveries which the purchase may be entitled to make under the contract, the contractor shall unless otherwise agreed to be entitled to get the payments subject to conditions stipulated in the subsequent clauses.
On Account Payment/ Progress payment: No on Account payment will be processed for this work. Final Payment: After successful commissioning of the transformer with standing of conformity test i.e. completion of entire work, the entire amount quoted in schedule of rate shall be made. All invoices/bills of materials in good condition shall be accompanied with the following: a) Supplier's challan for supply of items only. b) Inspection certificate granted by RITES/authorized representative of Sr. DEE/Tr-D/ Bilaspur. c) Execution of indemnity bond on stamp duty in case of materials supplied by the Railways. d) Detailed entries made in the e-measurement book. e) Consignee's test certificate.
Tax Deduction:
Income tax @ 2% plus surcharge as applicable on the amount to be paid by the contractor in pursuance of the contract which will be deducted from the bills preferred by him in accordance with section 1204C of the Income Tax Act, 1961 as introduced through finance Act of 1972 or as amended from time to time.
GST shall be paid as per the prevailing rate of Govt. of India at that time. For claiming subsequent bills, the contractor will have to produce voucher/challan regarding submission of GST for previous bill. If the contractor failed to produce the voucher/challan of previous bill the equivalent amount will be deducted from contractor's bill. GST shall be paid as per the prevailing rate of Govt. of India at that time. For claiming subsequent bills, the contractor will have to produce voucher/challan regarding submission of GST for previous bill. If the contractor failed to produce the voucher/challan of previous bill the equivalent amount will be deducted from contractor's bill.
Contractor should quote the rate including GST as applicable.
All the bidders/tenders should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law.
As per Railway Board letter no 2017/CE-I/CT/4/GST dtd 23.06.2017, Subsequent to the enactment of GST Act, Board (ME) has approved modification to para (a) of clause 6, Part-I of Indian Railways Standard General Conditions of Contract. The Revised para (a) of clause 6 shall be read as under:-
Dismantling , shifting , erection, testing & commissioning of 21.6/30.24MVA , TELK ,Kerala Make Power Transformers from BPH TSS to BSP TSS.
TRD-BSP-317-26-27-11~SECR
TRD-BSP-317-26-27-11
Open
Works - General
6 Months
Bilaspur, Chhattisgarh
₹0
₹47,600
14 Aug 2026
14 Aug 2026
24 Aug 2026
17 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 23,81,266.33 | ||
| — | 2.00 | — | — | ||
| Dismantling of power trfs | — | — | — | 3,62,265.82 | |
| — | 400.00 | — | — | ||
| Dragging of 21.6/30.24 MVA power transformer at BPH TSS and BSP TSS | — | — | — | 3,25,316 | |
| — | 1.00 | Lumpsum 105018.95 | — | ||
| Loading of 21.6/30.24MVA power trf with all accessories & Oil in Vehicle and trailer at BPH TSS | — | — | — | 1,05,018.95 | |
| — | 250.00 | — | — | ||
| Transportation of 21.6/30.24 MVA power transformer with all accessories, bushings & Oil by using Vehicle from BPH TSS to BSP TSS , Bilaspur division including transit insurance. | — | — | — | 5,67,417.5 | |
| — | 1.00 | Lumpsum 106956.88 | — | ||
| Unloading of 21.6/30.24MVA power trf with all accessories & Oil in Vehicle at BSP TSS, Bilapsur division | — | — | — | 1,06,956.88 | |
| — | 1.00 | Lumpsum 339012.08 | — | ||
| Erection, Testing & Commissioning of 21.6/30.24 MVA power transformer with all accessories, bushings & Oil (with Oil Filtrations) at BSP TSS . | — | — | — | 3,39,012.08 | |
| — | 1.00 | Lumpsum | — | ||
| Lumsum spares | — | — | — | 47,179.1 | |
| — | 5000.00 | — | — | ||
| Transformer Oil (with filtration) | — | — | — | 5,28,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS1212.08.26_compressed.pdf
ATTACHMENT
Explantorynote.pdf
ATTACHMENT
Explantorynote_1.pdf
ATTACHMENT
Advancecorrectionslipno.1ofGCC2022.pdf Advance correction slip 1 GCC 2022
ATTACHMENT
Advancecorrectionslipno.2ofGCC2022.pdf Advance correction slip 2 GCC 2022
ATTACHMENT
13.03.2026ACS11_compressed.pdf
ATTACHMENT
Proforma.pdf
ATTACHMENT
GCC_April-2022_1.pdf
ATTACHMENT
GCCACS8.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
GCC2022ACS-3.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
GCCACS5.pdf
ATTACHMENT
GCCACS6.pdf
ATTACHMENT
GCCACS7.pdf
ATTACHMENT
Advancecorrectionslipno.1ofGCC2022.pdf
ATTACHMENT
Advancecorrectionslipno.2ofGCC2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].