Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC MADURAI MADURAI TAMIL NADU | MADURAI | TAMIL NADU | 625001 | ₹1.2 Cr | L1 | Accepted-AOC WORK ORDER |
| 2 | L2₹1.2 Cr+₹4.2 L (3.48%)Rejected-Finance | ₹1.2 Cr+₹4.2 L (3.48%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SRI KUMARAN CONSTRUCTION L1 | S VELLAICHAMY CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Strenthening of the road from Ettikulathupatty to Ananthapuram Km 0/0 - 1/0 H/O Sithuvarpatty (R-149). Estimate amount : Rs. 36.00 Lakhs | |||||
| 2.00A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | Km 0/0 - 1/0 | 840 | Sqm | 6 ₹5,040 Lowest | 6.1 ₹5,124 |
| 4.00Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A | |||||
| 5.00 | Km 0/0 - 1/0 | 360 | Cum | 140.45 ₹50,562 Lowest | 147 ₹52,920 |
| 6.00Picking of Old Wornout BT Surface including all cost etc complete | |||||
| 7.00 | Km 0/0 - 1/0 | 1,255.42 | sqm | 23 ₹28,874.66 Lowest | 24 ₹30,130.08 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/0 - 1/0 | 470.78 | Cum | 2,476.15 ₹11,65,721.9 Lowest | 2,575 ₹12,12,258.5 |
| 10.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
24 Feb 2026, 3:00 pmClosed
The Project Director,DRDA,DINDIGUL
The Project Director,DRDA,DINDIGUL
Strengthening and 5 years maintenance of 2 nos road works in Vadamadurai Block NABARD RIDF 2026-2027 in Dindigul District TN05-36
2026_RDTN_658243_1
DIPR-1062-Tender 2026
Open Tender
Civil Works
Item Wise
180 days
DRDA
Strengthening and 5 years maintenance of 2 nos road works in Vadamadurai Block NABARD RIDF 2026-2027 in Dindigul District TN05-36
3 documents required · 3 mandatory
₹0
₹1.3 L
DRDA,DINDIGUL
30 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
20 Feb 2026
Name of the work : 1. Strenthening of the road from Ettikulathupatty to Ananthapuram Km 0/0 - 1/0 H/O Sithuvarpatty (R-149). Estimate amount : Rs. 36.00 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Picking of Old Wornout BT Surface including all cost etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Sign board
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenance I year
Maintenance II year
Maintenance III year
Maintenance IV year
Maintenance V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Name of the work : 2. Strenthening of the road from Dindigul - Karur road to Chellapillaikottam road Km 0/0-2/2 H/O Paganatham (R-55). Estimate amount : Rs. 79.20 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Picking of Old Wornout BT Surface including all cost etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Construction of Retaining Wall
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth etc, complete
Cemant Concrete 1:4:8(One Cement four Sand and Eight Hard Broken Stone) Using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Provision for Km stone, Hm stone,Guardstone,Name board, Logo board and Cautionary sign boards etc.
KM Stone
HM Stone
Provision for Sign board
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenance I year
Maintenance II year
Maintenance III year
Maintenance IV year
Maintenance V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 1.55 MB
BOQ_789668.xls
BOQ • 0.31 MB
nabarddateext.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .