Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | ₹13.0 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹16.8 L+₹3.8 L (29.2%)Rejected-Finance | ₹16.8 L+₹3.8 L (29.2%) | L2 | Rejected-Finance REJECT |
| 3 | L3₹19.0 L+₹6.0 L (46.3%)Rejected-Finance ASWARIPATNA PO BARAKULA DIST KHURDA | KHORDHA | ODISHA | 751001 | ₹19.0 L+₹6.0 L (46.3%) | L3 | Rejected-Finance REJECT |
Tender Value
₹16.8 L
EMD Value
₹16,784
Closing Date
12 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BANPUR NAC
BANPUR NAC OFFICE, BANPUR, KHORDHA
Development and beautification of pond at Rankanath Patana 1 and 2 of w.no-4 in Banpur NAC.
2026_ORULB_126599_12
E.O-N.A.C-BNR- 03/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
OFFICE OF BANPUR NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,784
Yes
10 Sept 2026
25 Feb 2026
13 Mar 2026
25 Feb 2026
12 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all materials , Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15 depth of surface etc all complete as per the required specifications and direction of Engineer in Charge. | 765 | sqm | 4.67 | ₹3,572.55 |
| 2 | Dewatering of Sludge/ waste water by pumping pump with 5HP diesel engine including hire charges with fuel etc complete as per direction of Engineer- in charge. | 330 | Hr | 200.7 | ₹66,231 |
| 3 | Deweeding:-prooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth roots by forking repeatedly beraking clods rough dressing flooding with water uprooting fresh growths after 10 to 15days and then fine dressing for planting new grass including disposal of all rubbish with all leads and lift | 750 | sqm | 38.98 | ₹29,235 |
| 4 | Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. Initial lead and 1.5m initial lift as per the direction and specification of the Deparment. | 990 | cum | 236.11 | ₹2,33,748.9 |
| 5 | Earth work in excavation of founation in hard soil or gravelly soil including dressing and levelling the bed not exceeding 1.5m initial depth and depositing the soil within initial lead of 50m and as per specification approved by the Department. (F&P) | 48.42 | cum | 276.89 | ₹13,407.01 |
| 6 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 200mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 39.24 | cum | 519.79 | ₹20,396.56 |
| 7 | Supplying and providing of Cement concrete of proportion (1:4:8) by using 40mm sized CBHG metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect as per the direction of Engineer-In-Charge. | 12.24 | cum | 6,279.13 | ₹76,856.55 |
| 8 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills. | 66.3 | cum | 6,572.05 | ₹4,35,726.92 |
| 9.1 | Supplying all materials, labour, T&P for smooth centering and shuttering to RCC works etc all complete as per specification and direction of the E.I.C.
2x50 | 78 | sqm | 265.35 | ₹20,697.3 |
| 9.2 | Wall | 195 | sqm | 1,098.94 | ₹2,14,293.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582845.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
13DTCN348.PDF
Tender Documents • 1.46 MB
BOQ_582845.xls
BOQ • 0.26 MB
348_CORRIGENDUM.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .