Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹3.0 L+₹59.95 (0.02%)Rejected-AOC | L2 | Rejected-AOC High Rate | |
| 3 | L3₹3.0 L+₹89.92 (0.03%)Rejected-AOC | L3 | Rejected-AOC High Rate |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
2 Jun 2026, 3:00 pmClosed
General Manager
23B Netaji Subhas Road 3rd Floor Kolkata 700 001
Construction of Cement Concrete Open Platform without Shed
2026_WBAIC_1024593_1
AIC/AED/NIeT-04/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
Bankura
Please refer Tender documents.
4 documents required · 4 mandatory
₹885
₹6,000
Yes
West Bengal Agro Industries Corporation Limited
15 Jul 2026
18 May 2026
5 Jun 2026
18 May 2026
2 Jun 2026
19 May 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of ground in any kind of soil including removing vegitrian inequalaties not excedding 15cm depth and disposal of rubbish with in lead up to 75m as dircted. | 372 | Sqm | 10 | ₹3,720 |
| 2 | Earth work in excavation of foundation trenches or drains in all sors of Soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m as directed. The item includes ncessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc as requered complete. a) Depth of excavaion not exceding 1500 mm. | 57.6 | Cum | 119.27 | ₹6,869.95 |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). | 28.8 | Cum | 592.27 | ₹17,057.38 |
| 4 | Supplying and laying Polythene Sheet (150gm/sq,m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 383.99 | Sqm | 24 | ₹9,215.76 |
| 5 | Plain/ Reinforced Cement Concrete in open foundation with or without reinforcements, in any part of foundation of bridges/ culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse Bgregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including Cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling testing including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. | 38.4 | Cum | 5,562.93 | ₹2,13,616.51 |
| 6 | Display Board | 1 | Cum | 1,000 | ₹1,000 |
| 7 | Sub Total | - | - | - | - |
| 8 | GST 18% | 1 | Nos | - | - |
| 9 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tendernotice_2.pdf
PDF • 1.11 MB
Tendernotice_3.pdf
PDF • 2.07 MB
BOQ_2518007.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .