Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LONE₹10.4 CrAccepted-AOC NOT APPICABLE NOT APPICABLE 12 A PEENYA INDUSTRIAL AREA BALGALORE 5600458 PEENYA INDUSTRIAL AREA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560045 | ₹10.4 Cr | LONE | Accepted-AOC - |
Tender Value
Refer Docs
EMD Value
₹8.3 L
Closing Date
22 Jul 2020, 3:00 pmClosed
DGM (C)
3rd floor, Admin building, barauni refinery, begusarai - 851114, bihar
Overhaul of 12MW Generator and its Exciter with supply of new fully bladed Turbine rotor and new pedestal and internal along with Bottom and Top Casing with same foot print design with latest governing system and vibration monitoring system in BR
2020_BR_116516_1
BCCM204604
Open Tender
Mechanical Works
365 days
BARAUNI REFINERY
As per the NIT and the tender doc
6 documents required · 6 mandatory
₹8.3 L
Yes
Contract Cell
10 Mar 2021
5 May 2020
23 Jul 2020
5 May 2020
22 Jul 2020
20 May 2020
5 May 2020 - 18 May 2020
19 May 2020
Amount
Design, Engg. and Retrofit of STG2,12 MW
Generator and Exciter Overhaul &Testing Overhauling along with Testing of 12 MW Generator and Exciter. Details of Generator and Exciter:- GENERATOR:- MAKE :-RUSSIAN TYPE :-T2T-12-T Apparent output:-13333 KVA Active output:-12000 kw Rated power factor:-0.9 ,lag Rated voltage:-6900 +/-5% volts Rated current:-1115 amp Rated speed:-3000 rpm Rated frequency:-50 Hz Xd ( %):-137.9; Xd' (%):-12.9; Xd" (%):-9.2; X2 (%):- 11.2; X0 (%):- 4.1 Generator phase connection:-Star EXCITER:- MAKE:-RUSSIAN TYPE:-BT-120-3000T RATED CAPACITY:-75 KW RATED CURRENT:-325 AMP RATED VOLTAGE:-230 VOLTS No of Poles (Main):- 4 No of Poles ( auxiliary):-4 Scope of Job included in the above mentioned heading are elobrated in detail under Contractor scope of job mentioned in Tender
Instrumentation Job & Machine Monitoring Scope of Job included in the above mentioned heading are elobrated in detail under Contractor scope of job mentioned in Tender
Mechanical job for 12MW Steam turbine
IN-SITU LOW SPEED BALANCING OF COMPLETE TRAIN (TURBINE AND ALTERNATOR ROTOR WITH COUPLING) Insitu Balancing shall only be executed as per the requirement of machine and shall not a mandatory to be executed.
Erection and commisioning charge
Bidder Name
Amount in Words
TRIVENI TURBINE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid