| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC 4 243A LAKSHMI NAGAR ACHIPATTI PANCHAYAT POLLACHI COIMBATORE TAMILNADU 642002 | COIMBATORE | TAMIL NADU | 642002 | ₹1.4 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC ACCEPTED AS L1 CONTRACTOR |
| 2 | L2₹1.6 CrRejected-AOC | ₹1.6 Cr | L2 | Rejected-AOC REJECTED SINCE RATE QUOTED ARE HIGHER THAN L1 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-DOCUMENT NOT FULFILLED. BIDDER NOT FURNISHED RENEWAL CERTIFICATE AND LATEST INCOME TAX CLERANCE CERTIFICATE . |
| Sl No | Description | Qty | Unit | SABARI BUILDERS L1 | SHRI BRINDHAVAN BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Installation Charges inclusive of transportation to site and assembling the Bored Pile equipment employed for the works including setting up pile driving equipments with all accessories and tools at each of the pile location based on the sequence of operation approved by the departmental Engineers, in respect of the location and distance involved in movement of pile boring equipment for all sizes of piles and dismantling the bored pile equipment etc. complete. | 1 | No | 1,26,000 ₹1.3 L | 1,38,000 ₹1.4 L |
| 2.00Initial Load Test as per IS 2911 Part IV 1995 including cost of single pile (250% of pile capacity), labour, reinforcement charges and all other incidential charges including excavation, shoring, strutting, dewatering etc. as necessary hire charges for jacks, measuring devices, Structural Frame work for platform, Kent ledges etc, as required and providing pilecap. | |||||
| 2.01 | Initial pile Load test (excluding pile cost) (Design load) | 145 | MT | 1,572 ₹2.3 L | 1,723 ₹2.5 L |
| 3.00 | Routine Load Test as per IS 2911 Part IV 1995 (150% of pile capacity) including labour charges and all other incidential charges including hire charges for jacks, measuring devices, Structural Frame work for platform, Kent ledges etc, as required and as directed by the departmental officers. | 87 | MT | 1,056 ₹91,872 | 1,157 ₹1.0 L |
| 4.00Installation of Vertical Bored cast in situ RCC piles of following diameter in all types of soils, using Standardised Concrete Mix of following grade, with sulphate resistant Cement or OPC/PPC, etc and Crushed Stone Sand and 20mm and down graded HBGS jelly coarse aggregate. The rate includes cost for placing of reinforcement cage in bore hole in correct position, cost of boring to the required depth with Bentonite solution with temprory casing of required length, conveyance of RMC to site and pouring concrete using Tremine pipes, conveyance of all materials to the site including all tools and plants, shifting the plants and equipments from one point to another, excavtion of mud pits for circulation of Bentonite soultion, closing the mud pits to original level and mud removal with initial lead and lift but including dismantling the concrete above the cut off level etc complete as directed by the departmental officers including socketing. The reinforcement cage should be welded properly for lifting. The concrete cubes to be tested as per IS 456 2000. Acceptance criteria by clause 16.1. Frequency of testing as per 15.2.2. Testing to be conducted at both the ends at site as well as RMC plant. Pile driving depth should be decided by the departmental officers at site. The length of pile for payment shall be measured from top of shoe to the bottom of the pile cap.( Cost of Reinforcement provided for Pile and Welding charges shall be measured and Paid separately ) Grade of Concreter:M20. | |||||
| 4.01 | 450mm dia Pile | 72 | Rm | 2,520 ₹1.8 L | 2,760 ₹2.0 L |
| 5.00 | Supplying and fixing of 1.00 mm thick GI decking sheeting (120GSM 240MPA-JSW) above structural members with necessary screws etc., complete complying with standard specification. | 149 | Sq.m | 5,775 ₹8.6 L | 6,325 ₹9.4 L |
| 6.00 | Supply, Fabrication, Erection, alignment and levels as per approved shop drawing of structural steel work in built up sections comprising of ISMB, ISMC, angle, plates and round bar section etc., Necessary permanent rivets, bolts, washers and nuts, handling, straightening, cutting, drilling holes, welding, sand blasting, shop assembly, transport to erection site, storing, leading to erection site and apply a coat of anti-corrosive yellow primer paint of approved make and two coat of MRF enamel paint prior to erectiont complete job in all respect. a) Connection Bolt are E350 GR.8.8 (IS3757) b) Hot Rolled are E250 GR, or Equivalent , Plate Grade E350 and all structural steel confirm to IS2062.c) Specification for Cold formed Light gauge Structural Steel Sections Confirm to IS: 811d) Painting confirm to IS 1477 part 1& 2.The rate is inclusive of design ,shop drawing preparation, submission for approval etc., and also inclusive of any other incidental charges such as lifting using cranes, labour charges for erection, cost of all materials involved and painting two coats over one coat of primer and as directed by the departmental officers. | 25.7 | MT | 1,96,350 ₹50.5 L | 2,15,050 ₹55.3 L |
| 7.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 24 | Cu.m. | 300 ₹7,200 | 328 ₹7,872 |
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 9 | Cu.m. | 5,948 ₹53,532 | 6,515 ₹58,635 |
Tender Value
Refer Docs
EMD Value
₹81,000
Closing Date
8 Jan 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/o THE SUPERINTENDING ENGINEER PWD BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE COIMBATORE
Construction of Connecting Corridor between Centenary Block (Tower-1) and Super speciality Block at Second Floor Level in Coimbatore Medical College Hospital in Coimbatore District
2025_PWD_637627_1
67BCMCBE22122025
Open Tender
Civil Works - Buildings
Coimbatore Medical College Hospital in Coimbatore
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹81,000
11 Mar 2026
31 Dec 2025
8 Jan 2026
31 Dec 2025
8 Jan 2026
31 Dec 2025
Amount
Installation Charges inclusive of transportation to site and assembling the Bored Pile equipment employed for the works including setting up pile driving equipments with all accessories and tools at each of the pile location based on the sequence of operation approved by the departmental Engineers, in respect of the location and distance involved in movement of pile boring equipment for all sizes of piles and dismantling the bored pile equipment etc. complete.
Initial Load Test as per IS 2911 Part IV 1995 including cost of single pile (250% of pile capacity), labour, reinforcement charges and all other incidential charges including excavation, shoring, strutting, dewatering etc. as necessary hire charges for jacks, measuring devices, Structural Frame work for platform, Kent ledges etc, as required and providing pilecap.
Initial pile Load test (excluding pile cost) (Design load)
Routine Load Test as per IS 2911 Part IV 1995 (150% of pile capacity) including labour charges and all other incidential charges including hire charges for jacks, measuring devices, Structural Frame work for platform, Kent ledges etc, as required and as directed by the departmental officers.
Installation of Vertical Bored cast in situ RCC piles of following diameter in all types of soils, using Standardised Concrete Mix of following grade, with sulphate resistant Cement or OPC/PPC, etc and Crushed Stone Sand and 20mm and down graded HBGS jelly coarse aggregate. The rate includes cost for placing of reinforcement cage in bore hole in correct position, cost of boring to the required depth with Bentonite solution with temprory casing of required length, conveyance of RMC to site and pouring concrete using Tremine pipes, conveyance of all materials to the site including all tools and plants, shifting the plants and equipments from one point to another, excavtion of mud pits for circulation of Bentonite soultion, closing the mud pits to original level and mud removal with initial lead and lift but including dismantling the concrete above the cut off level etc complete as directed by the departmental officers including socketing. The reinforcement cage should be welded properly for lifting. The concrete cubes to be tested as per IS 456 2000. Acceptance criteria by clause 16.1. Frequency of testing as per 15.2.2. Testing to be conducted at both the ends at site as well as RMC plant. Pile driving depth should be decided by the departmental officers at site. The length of pile for payment shall be measured from top of shoe to the bottom of the pile cap.( Cost of Reinforcement provided for Pile and Welding charges shall be measured and Paid separately ) Grade of Concreter:M20.
450mm dia Pile
Supplying and fixing of 1.00 mm thick GI decking sheeting (120GSM 240MPA-JSW) above structural members with necessary screws etc., complete complying with standard specification.
Supply, Fabrication, Erection, alignment and levels as per approved shop drawing of structural steel work in built up sections comprising of ISMB, ISMC, angle, plates and round bar section etc., Necessary permanent rivets, bolts, washers and nuts, handling, straightening, cutting, drilling holes, welding, sand blasting, shop assembly, transport to erection site, storing, leading to erection site and apply a coat of anti-corrosive yellow primer paint of approved make and two coat of MRF enamel paint prior to erectiont complete job in all respect. a) Connection Bolt are E350 GR.8.8 (IS3757) b) Hot Rolled are E250 GR, or Equivalent , Plate Grade E350 and all structural steel confirm to IS2062.c) Specification for Cold formed Light gauge Structural Steel Sections Confirm to IS: 811d) Painting confirm to IS 1477 part 1& 2.The rate is inclusive of design ,shop drawing preparation, submission for approval etc., and also inclusive of any other incidental charges such as lifting using cranes, labour charges for erection, cost of all materials involved and painting two coats over one coat of primer and as directed by the departmental officers.
Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means
Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means
Brick work in Cement Mortar 1:6( One Cement and Six Crushed stone sand) using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for following including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge.
For Superstructure in Ground Floor
For Superstructure in First Floor
For Superstructure in Second Floor
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid)
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
For Foundation and Basement
For Superstructure in First Floor
For Superstructure in Second Floor
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
For Foundation and Basement
For Superstructure in First Floor
For Superstructure in Second Floor
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of 230mm x 230mm x 20mm size of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supply and Fixing of UPVC rain water gutter of approved design and drawing including clamping and all others works required to complete the job. The rate is inclusive of any other incidental charges such as labour charges, cost of all materials involved and as directed by the departmental officers.
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessery PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification and as directed by the departmental officers.
110mm dia PVC pipe- for Three Floor
Paving the floor with best quality vitrified Tiles of 600x600x8mm size and variety conforming IS 15622 with water absorbtion less than 0.08% of approved colour and shade laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors and the top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
The supply and installation of uPVC partitions with doors shall utilize uPVC profile sections with an outer wall thickness of 2.30mm (±0.2mm), featuring an outer frame of 74mm x 60mm x 56mm, a shutter of 104mm x 60mm x 66mm, a mullion of 72mm x 60mm x 36mm, a glazing bead of 35mm x 18mm, a 20mm multi-chambered hollow uPVC panel section of 150mm x 20mm, and a uPVC panel bead of 19mm x 16mm. All profiles of frames, sash, and mullion shall be reinforced, where required, with 1mm thick GI steel sections. The door will be equipped with 3D hinges for enhanced weight holding capacity, and security devices such as multipoint lock systems with a cylinder lock facilitated handle, all compliant with relevant specifications and departmental directives. Glazing or uPVC panels shall be 5mm thick Plain Toughened or uPVC panel grip, held by TPE (Grey) weather-sealed gaskets. All corners and mullion joints of the frame and sash shall be mitred cut and fusion welded without mechanical joints, with all welded joints neatly trimmed to a grooved nib finish, ensuring the finished products are free from sharp edges. The complete units shall be fixed into pre-finished openings by drilling and fastening through the outer frame using high-quality fasteners, and silicon sealant shall be applied to fill the gap between the wall and the frame for a leak proof installation and completion etc., Complete and as directed by the department officers.
Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug.
Providing and fixing of Aluminium Composite Panel (ACP) 4 sided having 50 x 25 x 1.50mm frame work vertical and horizontals out of specially designed extruded sections withstand wind pressure of 180 Kg/sq.m and fabricated fixed at all level elevation and heights. The extruded section cutting and fixing required space extruded section shall be of 6063 and alloy of BSH 9 confirming T is – 63400 rate shall included to fix the main frame with necessary clamps, fasteners, bolt nuts etc. The main frame of extruded section shall be of 22843 & 22739 (H9) grade conforming to BS 4174 (or) IS 8147. Rate shall included 4mm thick ACP sheet (0.25 + 3.5 + 0.25) fixing with spacer tape and the ACP sheet bounded with special type structural sealant of dow corning 789 or equivalent in dust free conditions the gaps between ACP sheet to be filed with whether sealant and backer rod or 12mm foam sheet to ensure water and air tightness in all complete complying with standard specification as directed by the departmental officer
Structural Glazing: Providing and fixing structural glazing fabricated from roll formed sections made of galvanized steel colour coated (Base steel as per IS 513 of ‘D’ quality, galvanized as per IS 277 with Zinc of 120 grams / sqm.) with total coated thickness of 0.72mm. The glass holding section made of 304 grade SS of 0.6mm thick. Galvanized steel sections are to be used as stiffeners inside the colour coated steel / powder coated sections as per the design requirement. Design calculations are made to suit wind pressures as given in IS 875. Paint specifications: Primer coat with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12 -16 microns thick and back coated with alkyd backer of 5-7 microns or powder coated with pure polyester powder upto 50-60 microns thick.Dimensions: The section should be of 37 x 53mm for frame vertical, 37 x 53mm for frame horizontal section and section for reinforcement should be of 31 x 55mm. glass holding section should be of 37 x 37mm for top and bottom grids in between should be of 37 x 18mm. Accessories: Brackets made of CRCA powder coated / electro plated should be used to fix vertical at top and bottom and vertical to slab as per site requirement. Polyurethane brackets should be used to connect horizontal section to vertical sections. Silicone: Natural cure, with good UV resistance to be used. The above frame should be fixed to brick / concrete masonry by using nylon self–expanding cap and driving MS electro plated 80mm long screws into the caps through frames. Glass: 5mm reflective
Supplying and laying of Rubber Moulded Hydraulic Pressed Paver Block 83mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shall included for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance, welding charges, electrical charges, etc. complete
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 12mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including mortar plasticizer at 200ml per 50Kg of cement used, finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Painting the wall with Texture Finish Paint including labour charges, over cement plastered wall surface etc., complete complying with standard specification.
Painting Old Plastered Wall Surface with Two finishing coats of weather proof Exterior Emulsion paint of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying and fixing in position best quality PVC soil / waste pipes of following dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level
160mm dia
110mm dia
Supplying and fixing in position PVC specials of the following dia and types of approved quality confirming to BIS and providing leak proof joints including fixing to the walls and giving connection to the PVC soil stacks, dismantling the masonry or RCC works and re-doing the dismantled portion to original condition etc., complete complying with standard specifications. (The PVC specials should be got approved by the Executive Engineer before use on works).
160mm dia Elbow
160mm dia Bend
110mm dia Elbow
110mm dia Bend
Supplying and fixing in position SFRC manhole covers with SFRC frames (Heavy duty) of size 90cm x 90cm of best approved quality as per standard specification etc., complete compying with standard specifications
Providing two legged scaffolding using 15cm diameter blue-gum posts or casuarina posts of best quality bamboo posts of 4m over all length (3m+0.5m projection+0.5m into the ground) the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at2m c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc.,in a complete form using coir and nails 1m run.
For a height from 11.00m upto 13.50m
Supplying and erecting in position of 500 liters capacity Industrial Model Reverse Osmosis Water-cum Purifier to deliver Potable Water with World Health Organisation (WHO) Standards with following accessories. (a) MS Skid - 1 No. (b) Media 11054 No. Vessel with 20 nb Multiport Valve (with Media Pubble and Fine Sand and Activated Carbon Filling) set (c) Feed Pump 0.50 HP – 1 No. (d) Vertical Pump 2-9, 2.00 HP / Single Phase – 1 No. (e) Membrane 40 x 40 filmtech (or) equilaents / Osmonic (USA) - 1 No. and Membrane Pressure Vessel 40 x 40 -1 No. & Pressure Gauge - 2 Nos. (f) Flow Meter - 1 No. 20 Filter with Housing - 1 No., Low Pressure Switch - 1 No., Level Switch - 1 No. & Necessary CPVC Pipes and Fittings. The system shall be provide with Two Panel Control System with necessary Stainless Valves and Fittings and Float Control etc. The rate should be inclusive of all civil works, wherever necessary to install the System in position and intact.
Supplying, laying and jointing UPVC pipes of Class 6 (having working pressure of 12.50 kg/sq.cm) conforming to IS 4985- 2000 of approved quality and best variety conforming to BIS of the following dia including cutting and fixing UPVC specials using UPVC adhesives (but excluding cost of such specials) in accordance with IS 7634-3 (2003) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges upto 4 metre height above ground level, etc., complete complying with standard specifications. The PVC pipes shall be got approved by Executive Engineer before use on works - External water supply Below ground level.
32mm dia pipe
Supplying, laying and jointing UPVC pipes of Class 6 (having working pressure of 12.50 kg/sq.cm) conforming to IS 4985- 2000 of approved quality and best variety conforming to BIS of the following dia including cutting and fixing UPVC specials using UPVC adhesives (but excluding cost of such specials) in accordance with IS 7634-3 (2003) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges upto 4 metre height above ground level, etc., complete complying with standard specifications. The PVC pipes shall be got approved by Executive Engineer before use on works - External water supply above ground level.
32mm dia pipe
25mm dia pipe
Supplying UPVC Specials in water supply arrangements (both in internal and external water supply arrangements. Since the labour for cutting, pasting, sundries have already been included under pipe line item of works, no separate provision for fixing UPVC specials needs to be allowed
32mm dia UNION
25mm dai UNION
32mm dai ELBOW
25mm dai ELBOW
32mm dai TEE
25mm dai TEE
32mmx25mm dia
25mmx20mm dia
20mmx15mm dia
25mm dia HEX Nipples
Supplying and fixing of PVC ready made WATER TANK of 1000 Litres capacity of best and approved quality with ISI specification and having inlet,outlet, overflow and clearing pipe arrangements and labour charges for fixing in position with all necessary accessories and transporting at site of work including necessary brick work conveyance loading, unloading labour for fixing etc., complete complying as directed by the departmental officers.
Supply and kept in position of Trolley Mounted Type 22.5 kg. Carbon-di-Oxide Fire Extinguisher as per IS15683, complete with control valve, gun metal cap, pressure gauge, operation sticker, discharge hose, mounting trolley with moving wheel, safety clip, etc., including conveyance, all incidental charges, neccessary scaffolding and re-doing the dismantled portions to its original condition wherever found neccessary, etc., complete as per standard specification and as directed by the Departmental Officers..
SHRI BRINDHAVAN BUILDERS (BID ID -1557589)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_763102.xls
BOQ • 0.45 MB
GenConditionconnectingcorridor.pdf
Tender Documents • 0.64 MB
Download all tender documents and submit your bid