| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -0.10% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 LAdmitted-Finance | +1.00% | ₹1.8 L | L2 | Admitted-Finance |
| 3 | L3₹1.8 LAdmitted-Finance 168 B S ROAD P O DIST COOCH BEHAR 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | +2.23% | ₹1.8 L | L3 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹3,550
Closing Date
23 Feb 2026, 2:00 pmClosed
EXECUTIVE ENGINEER (WATER SUPPLY
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
STRENGTHENING OF THREE NOS. PSC LEAKY PORTION ON 1500 MM DIA CC GRID OPPOSITE DBPL GATE NO 03 AND VESUVIOUS INDIA LTD. TOWARDS RAILGATE ON TARATALA ROAD.
2026_KMC_1002282_1
EEWS/KMC/GRWW/25-26/141
Open Tender
MECHANICAL
10 days
ON TARATALA ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,550
25 May 2026
9 Feb 2026
25 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m.
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(b) For additional depth beyond 1.5 m. and upto 3.00 m
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(c) For additional depth beyond 3.00 m.
Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point.
Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing (AMP-32) including supplying. Fitting and fixing all complete..
Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2456329.xls
BOQ • 0.35 MB
TD141.pdf
Tender Documents • 0.57 MB
OID.pdf
Additional Documents • 0.68 MB
Download all tender documents and submit your bid