| 1 | 1st₹4.1 CrAccepted-AOC BIRPARA PO BIRPARA DIST JALPAIGURI W B PIN 735204 | ALIPURDUAR | WEST BENGAL | 735204 | ₹4.1 Cr | 1st | Accepted-AOC 1st lowest |
| 2 | 2nd₹4.8 Cr+₹70.6 L (17.3%)Rejected-Finance 12 10 LOHIYA MARG DISTT PRAYAGRAJ U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹4.8 Cr+₹70.6 L (17.3%) | 2nd | Rejected-Finance 2nd lowest |
| 3 | 3rd₹5.0 Cr+₹91.6 L (22.5%)Rejected-Finance | ₹5.0 Cr+₹91.6 L (22.5%) | 3rd | Rejected-Finance 3rd lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Failed |
| 5 | Rejected-Technical ADD PADUMPUR NASRATPUR PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | - | - | Rejected-Technical Failed |
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
21 Mar 2020, 12:00 pmClosed
SuperintendingEngineerPrayagrajCirclePWDPrayagraj
Office of Superintending Engineer Prayagraj Circle PWD Prayagraj
Renewal with Special Repair of Tewa Paschim Shareera Road Under IRQP and Construcion of Culvert At Km 2 Ch 1.10, 1.80
2020_CEALD_436075_1
922/11Com B Pray Circle/19 Dt 04-02-2020
Open Tender
Civil Works - Roads
Fixed-rate
180 days
Kaushambi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,336
Online
₹9.6 L
Yes
Prayagraj
10 Jul 2020
18 Feb 2020
21 Mar 2020
18 Feb 2020
21 Mar 2020
18 Feb 2020
22 Feb 2020
Amount
Construction of embankment/ Patari with approved material obtained from RIGHT OF WAY with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per Morth Speci. Class 305(3.18). (local Earth)
Providing, laying, spreading and compacting graded stone aggregate (45 mm to 22.4 mm, 22.4 mm to 2.36 mm, 2.36 mm to 75 micron Kabrai/Bharatkoop Quarry) to (Stabilization with emulsion3.5% and cement 1% ) wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying tack coat with bitumen VG-10 Grade using Bitumen pressure distributor @ 0.30 kg per sqm on the prepared Existing surface which is cleaned with broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Dismentalling of old RCC Slab including stacingh of dismantied materials with in 60 m distance as directed by S/I, As per PWD SOR No 17.04 (694)
Dismentalling of Brick Work including stacingh of dismantied materials with in 60 m distance as directed by S/I, As per PWD SOR No 17.02 (692) For Abutment
Construction of embankment/ Patari with approved material obtained from RIGHT OF WAY with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per Morth Speci. Class 305(3.18). (local Earth)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/ tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD Specific - ations 401
Earth work in excavation of Foundation of Structure as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other delerious matter, dressing of sides and bottom, backfilling the excavation earth of the extend required and complete the work as per Direction of E/I
Providing concrete Reinforced concrete in open foundation complete , as per drawing and technical specification clause 802,803,1203 P.C.C. grade M-15.
Brick masonary work in 1:3 cement mortar in sub structure complete exepting pointing and plasterig, as per drawing and specification clause 602,603,604 and 1204
Providing and laying reinforced cement RCC-M-20 concrete in superstructure as per drawing and technical specifications Clause 800,1205.4 and1205.5
Providing and laying reinforced cement concrete RCC M-25 in superstructure as per drawing and technical specifications Clause 800,1205.4 and1205.5
Suplying, Fixing, and placing HYSD bar reinforcement in superstructure as per drawing and technical specifications Clause 1002,1010,1202
Pointing with Cement Mortar (1:3) 15mm. Thick on brick work in superstructure as per technical specification Clauses 613.4 and 1204
Plastering with cement mortar (1:3) 15 mm. thick on brick work in superstructure as per technical specification Clauses 613.4 and 1204
Supply of 600 mm dia NP3 Hume Pipe for Culvert
Laying of 600 mm dia NP3 Hume Pipe for Culvert
Bansal Highway Infratech Pvt Ltd
M/S A.P.S. And Co. Pvt. Ltd.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .