| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.0 LAccepted-AOC NO 21 C V NAIDU I STREET JAYA NAGAR TIRUVALLUR 602001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹61.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹61.8 LRejected-Finance | ₹61.8 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical The firm has not submitted required documents as per NIT |
| Sl No | Description | Qty | Unit | SAI SRI HARSHA ENTERPRISES L2 | S.B.RAJA RAO L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 22.49 | CUM | 300 ₹6,747 | 290 ₹6,522.10 |
| 2.00 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 22.49 | CUM | 2,700 ₹60,723 | 2,650 ₹59,598.50 |
| 3.00 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen emulsion. On bituminous surface @ 0.25kg/sqm. | 6,386.2 | SQM | 20 ₹1.3 L | 20 ₹1.3 L |
| 4.00 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen emulsion. On W.B.M / W.M.M. @ 0.4kg/sqm. | 2,319.6 | SQM | 50 ₹1.2 L | 50 ₹1.2 L |
| 5.00 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 115.98 | CUM | 12,000 ₹13.9 L | 11,950 ₹13.9 L |
| 6.00 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch type Hot Mix Plant of 100-120 TPH capacity. | 319.31 | CUM | 11,500 ₹36.7 L | 11,450 ₹36.6 L |
| 7.00 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P,cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 297.81 | SQM | 500 ₹1.5 L | 500 ₹1.5 L |
| 8.00 | Providing and fixing Glow studs of size 100x20 mm made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloretrite ) or HIP (High impact polystyrene) or ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud shall support a load of 13635 kg tested in accordance with ASTM D4280. The slope of retro- reflective surface shall be 35 (+/-5) degress to base .The reflective panels on both sides with at least 12 cm of reflective area up each side. The luminance intensity should be as per the specification and shall be tested as described in ASTM I: 809 as recommended in BS: 873 part 4 : 1973. The studs shall be fixed to the Road surface using the adhesive conforming to IS, as per procedure recommended by the manufacturer complete and as per direction of Engineer-in-charge. | 999 | EACH | 220 ₹2.2 L | 200 ₹2.0 L |
| 9.00 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. For Shoulder | 2,421.75 | SQM | 22 ₹53,278.50 | 20 ₹48,435 |
| 10.00 | Supplying and stacking at site. Moorum. | 242.18 | CUM | 950 ₹2.3 L | 900 ₹2.2 L |
Updated dates
Tender Value
₹61.4 L
EMD Value
₹1.2 L
Closing Date
28 Feb 2026, 10:00 amClosed
COMMANDANT ENGINEER CONTRACT CELL SZ HQR
CONTRACT CELL SOUTH ZONE HQR CRPF HYDERABAD TELANGANA PIN 500005
Recarpeting of external bituminous road in front of Gate No 1 at GC, CRPF, Avadi
2026_CRPF_898832_1
B.V-4/2025-26-SZ-Works (GC AVD) Major Work T/090
Open Tender
Civil Works - Roads
90 days
GC CRPF AVADI CHENNAI 600065
As per NIT
3 documents required · 3 mandatory
₹0
₹1.2 L
27 Apr 2026
17 Feb 2026
2 Mar 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_944775.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid