| 1 | L1₹60.8 CrAdmitted-Finance TIRUNELVELI TAMIL NADU 627001 INDIA UDYAM TN 18 0014241 | TIRUNELVELI | TAMIL NADU | 627001 | ₹60.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹62.5 CrAdmitted-Finance | ₹62.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹66.8 CrAdmitted-Finance | ₹66.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹68.2 CrAdmitted-Finance | ₹68.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹68.6 CrAdmitted-Finance | ₹68.6 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mohan Power Infrastructure Pvt Ltd L1 | KSA Powerinfra Private Limited L2 | TRANSGLOBAL POWER LIMITED L3 | S.M.Tower Technology L4 | Associated Power Structures Pvt. Ltd. L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Schedule I | 1 | No | - | - | - | - | - |
| 2.00 | Schedule II | 1 | No | - | - | - | - | - |
| 4.00 | Applicable GST Amount (Total GST Amount @18%) | 1 | No | - | - | - | - | - |
Tender Value
₹37 Cr
EMD Value
₹37 L
Closing Date
27 Dec 2019, 3:00 pmClosed
CE Civil Transmission
CE Civil Transmission, 2nd floor, eastern wing, NPKRR Maaligai, 144, Anna salai, Chennai - 600 002
Nanguneri 230KV Transmission Line
2019_EB_142431_1
T-29
Open Tender
Civil Works
455 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37 L
Yes
Chennai
5 May 2020
29 Oct 2019
30 Dec 2019
29 Oct 2019
27 Dec 2019
26 Nov 2019
29 Oct 2019 - 16 Nov 2019
11 Nov 2019
Amount
Schedule I
Schedule II
Applicable GST Amount (Total GST Amount @18%)
Description of Work / Item(s)
Amount
SUPPLY - Line I Tower parts: Fabrication Galvanising and supply of various type of normal, narrow base tower & towers parts and extension of , tower part body/leg extension complete (excluding bolts, nuts and stubs) .
Mild Steel tower parts
HT steel
Fabrication Galvanising and supply of stub & cleat for various type of normal, narrow base tower & towers parts and extension tower parts , leg extension complete (excluding bolts, nuts ) .
Mild steel
HT steel
Supply of hot dipped GI bolts & Nuts, step bolts, spring washers and pack washers etc.
Supply of following tower accessories
Danger plates
Number plates
Phase plate ( set of three)
Name Plate
Circuit plate(set of two)
Anti-Climbing Device (Set of Four)
Design, manufacture and Supply of following line materials as per technical specification
ACSR Zebra conductor as per technical specification
GI Earth wire 7/3.55mm as per specifications
90 KN ordinary disc insulator
120 KN ordinary disc insulator
Supply of following hard wares fittings for ACSR Zebra conductor & GI Earth wire
Single suspension hardware fittings suitable for Zebra conductor
Single Tenson hardware fitting suitable for zebra conductor
Mid span compression joint for ACSR Zebra conductor
Repair sleeve for ACSR Zebra conductor
Vibration damber for ACSR Zebra Conductor
P.A.Rod for Zebra
16mm U bolt & nut
D shackle
Tension clamp for 7/3.55mm Earth wire
Suspension clamp for 7/3.55mm Earth wire
Midspan Compression joint for 7/3.55mm Earth wire
Aluminium Earth bond
ERECTION - Line I
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.
Labour charges for removal of trees for line clearance
Check survey and Pit marking including clearing bushes, removing, levelling the location
Work Associated with tower foundation Excavation in various types of soil
HGS Earth work excavation and depostiting on bank with initial lead of 10m & lift of 2m in hard stif clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20 B
SDR (not requiring blasting) Earth work excavation and depostiting on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite soft rock or kankar not requiring blasting
MR & DMR (not requiring blasting)Earth work excavation and depositing on bank with intial lead of 10m and lift of 2m in medium rock and dense medium rock not requiring blasting
Earth work excavation in hard rock measured in solid including blasting and stacking
Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited
PCC 1:3:6 using 20mm metal without form work including cost of all materials labour lead lift etc complete
PCC 1:2:4 using 12mm to 20mm metal with steel formwork for foundation, chimney concrete etc
RCC 1:1.5:3 using 12mm to 20mm metal with steel formwork for foundation, chimney concrete etc
Placing reinforcements of MS/RTS rods in position as per drawing for all RCC works including cost of all materials, binding wire, labour for bending, tying, placing in position, lead, lift, etc. complete.
Refilling with excavated earth other than sand in foundation and basement including cost of all materials, labour, lead, lift etc., complete
Removal of surplus earth away from the site to 200 m distance as directed by the Engineer at site
Dewatering charges during excavation and concreting with 3/5 HP Diesel motor with Pump including hire charges, labour, fuel, oil, transport etc complete
Providing shoring and shuttering in foundation using wooden planks and scantling
Transportation, installation and assembling template, stub and cleat in position and alignment including fixing of bolts and nuts
Transportation and erection of various type of towers, tower extension complete including tack welding, bolt & nut, supply of zinc rich primer enamel paint and application of one coat of zinc rich primer and two coat of enamel paint over the welded portion
PCC 1:2:4 using 12 to 20mm metal for muffing and coping concrete including cost of all materials, labour, lead, lift etc., complete
Plastering with CM 1:3 12mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc., complete
Transportation and Installation of following tower accessories
Danger Board
Number plate
Phase plate (set of three)
Name plate
Circuit plate (set of two)
Transportation and Stringing of 6 nos zebra conductor including paying out jointing rough sagging, stringing, tensioning as directed with necessary trussels including cost of all materials, labour, lead, lift etc., complete
6 wires -km run under multiple span
6 wires -single span under normal condition
6 wires -single span under LC condition
Stringing of G.I. earth wire including single tension as directed with necessary trussels including cost of all materials, labour, lead, lift etc., complete
multiple span
single span under normal condition
single span under LC condition
Providing pipe type earthing for tower location including extra excavation in foundation of towers for fixing 3m long 25mm dia GI "B" class earth pipe using 7/3.55mm earth wire of 2.40 m long with lugs on both terminals for connecting the GI pipe with tower leg refilling with evcavated earth mixed with salt and charcoal as per standard specifiction including cost of 25mm GI B class pipe, other materials, transport all labour leads and lifts, etc., complete.
Painting with two coats of anti-corrosive black paint over stub and leg of tower for depth of 0.45m including cost of all materials, labour, lead, lift etc., complete
Labour charges for transportation and hoisting of 13 units 90KN suspension insulators with suspension fittings including cost of fittings all materials, labour, lead, lift etc. complete
Labour charges for transportation and hoisting of 14 units 120KN Tension insulators with Tension fittings including cost of fittings all materials, labour, lead, lift etc complete
Providing full welding of all bolt & nut in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolt & nut with two coats of best quality of cold galvanized paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges, for diesel generators and welding transformers, all labour, transport charges etc., complete
Providing temporary guys for tension locations including cost of earth work excavation, refilling, labour etc complete
Lowering HT/LT Line during stringing of power conductor and after restringing the HT/LT line.
Providing trussels for all road crossing including cost of all materials, labour, lead, lift etc complete
Releasing, lowering and rehoisting of 13 units of single suspension insulator with fittings including all labour, lead, lifts and T & P etc complete.
Releasing, lowering, cutting and restringing of existing 3 Nos. Kundah conductor into newly erected tower including all labour, lead, lifts, T&P etc complete.
Releasing, lowering, cutting and restringing of existing 1 No. GI earthwire into newly erected tower including all labour, lead, lifts, T&P etc complete.
Supply & Providing special type earthing including 50 mm dia G.I "C" class pipe inserted in 6" dia bore upto 3 m height and earthing with the tower and providing anti-climbing device on the railway crossing towers incuding cost of 2 nos 60 cm dia & 30 cm height RCC ring with cover (each tower having 2 nos earth pit ) but excluding cost of steel wire - 2 nos
Providing loop jumper for zebra conductor
Final checking of newly erected tower line to ascertain all towers and correct size of bolts and nuts hard ware fittings and insulators with cotter pin as per requirement and tools and plants to the TANTRANSCO authorised persons before commissioning of the line
Description of Work / Item(s)
Amount
SUPPLY - Line II Fabrication, Galvanising and supply of various types of normal, narrow base tower & towers parts and extension of , tower part body/leg extension complete (excluding bolts, nuts and stubs).
Mild Steel tower parts
HT steel
Fabrication Galvanising and supply of stub & cleat for various type of normal, narrow base tower & towers parts and extension tower parts , leg extension complete (excluding bolts, nuts ) .
Mild steel
HT steel
Supply of hot dipped GI bolts & Nuts, step bolts, spring washers and pack washers etc.
Supply of following tower accessories
Danger plates
Number plates
Phase plate ( set of three)
Name Plate
Circuit plate(set of two)
Anti-Climbing Device (Set of Four)
Design, manufacture and Supply of following line materials as per technical specification
ACSR Zebra conductor as per technical specification
GI Earth wire 7/3.55mm as per specifications
90 KN ordinary disc insulator
120 KN ordinary disc insulator
Supply of following hard wares fittings for ACSR Zebra conductor & GI Earth wire
Single suspension hardware fittings suitable for Zebra conductor
Single Tenson hardware fitting suitable for zebra conductor
Mid span compression joint for ACSR Zebra conductor
Repair sleeve for ACSR Zebra conductor
Vibration damber for ACSR Zebra Conductor
P.A.Rod for Zebra
16mm U bolt & nut
D shackle
Tension clamp for 7/3.55mm Earth wire
Suspension clamp for 7/3.55mm Earth wire
Midspan Compression joint for 7/3.55mm Earth wire
Aluminium Earth bond
ERECTION - Line II
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.
Labour charges for removal of trees for line clearance
Check survey and Pit marking including clearing bushes, removing, levelling the location
Work Associated with tower founation Excavation in various types of soil
HGS Earth work excavation and depostiting on bank with initial lead of 10m & lift of 2m in hard stif clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20 B
SDR (not requiring blasting) Earth work excavation and depostiting on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite soft rock or kankar not requiring blasting
MR & DMR (not requiring blasting)Earth work excavation and depositing on bank with intial lead of 10m and lift of 2m in medium rock and dense medium rock not requiring blasting
Earth work excavation in hard rock measured in solid including blasting and stacking
Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited
PCC 1:3:6 using 20mm metal without form work including cost of all materials, labour, lead, lift etc complete
PCC 1:2:4 using 12mm to 20mm metal with steel formwork for foundation, chimney concrete etc., complete
RCC 1:1.5:3 using 12mm to 20mm metal with steel formwork for foundation, chimney concrete etc.
Placing reinforcements of MS/RTS rods in position as per drawing for all RCC works including cost of all materials, binding wire, labour for bending, tying, placing in position, lead, lift, etc. complete.
Refilling with excavated earth other than sand in foundation and basement including cost of all materials, labour, lead, lift etc., complete
Removal of surplus earth away from the site to 200 m distance as directed by the Engineer at site
Dewatering charges during excavation and concreting with 3/5 HP Diesel motor with Pump including hire charges, labour,fuel,oil,transport etc, complete
Providing shoring and shuttering in foundation using wooden planks and scantling
Transportation, installation and assembling template, stub and cleat in position and alignment including fixing of bolts and nuts
Transportation and erection of various type of towers, tower extension complete including tack welding bolt & nut supply of zinc rich primer enamel paint and application of one coat of zinc rich primer and two coat of enamel paint over the welded portion.
PCC 1:2:4 using 20mm metal for muffing and coping concrete including cost of all materials, labour, lead, lift etc., complete
Plastering with CM 1:3,12mm thick for muffing coping concrete including cost of all materials labour, lead, lift etc., complete
Transportation and Installation of following tower accessories
Danger Board
Number plate
Phase plate (set of three)
Name plate
Circuit plate (set of two)
Transportation and Stringing of 6 nos zebra conductor including paying out jointing rough sagging and stringing tension as directed with necessary trussels including cost of all materials, labour, lead, lift etc., complete
3 wires - Km run under multiple span
3 wires -single span under normal condition
6 wires-single span under LC condition
3 wires -single span under LC condition
Stringing of G.I.earth wire including single tension as directed with necessary trussels including cost of all materials, labour, lead, lift etc., complete
multiple span
single span under normal condition
single span under LC condition and railway crossing single span
Providing pipe type earthing for tower location including extra excavation in foundation of towers for fixing 3m long 25mm dia GI "B" class earth pipe using 7/3.55mm earth wire of 2.40 m long with lugs on both terminals for connecting the GI pipe with tower leg refilling with excavated earth mixed with salt and charcoal as per standard specifiction including cost of 25mm GI B class pipe, other materials, transport all labour, leads and lifts, etc., complete.
Painting with two coats of anti-corrosive black paint over stub and leg of tower for depth of 0.45m including cost of all materials, labour, lead, lift etc., complete
Labour charges for transportation and hoisting of 13 units 90KN suspension insulators with suspension fittings incluing cost of fittings all materials, labour, lead, lift etc complete
Labour charges for transportation and hoisting of 14 units 120KN Tension insulators with Tension fittings incluing cost of fittings all materials, labour, lead , lift etc complete
Providing full welding of all bolt & nut in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolt & nut with two coats of best quality of cold galvanized paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generators and welding transformers all labour, transport charges etc., complete
Providing temporary guys for tension locations including cost of earth work excavation, refilling, labour etc complete
Lowering HT/LT Line during stringing of power conductor and after restringing the HT/LT line.
Providing trussels including cost of all materials, labour, lead, lift etc complete for.
All road crossing .
Major Road Crossing and Railway crossing
Final checking of newly erected tower line to ascertain all towers and correct size of bolts and nuts hard ware fittings and insulators with cotter pin as per requirement including cost of tools and plants along with TANTRANSCO authorised persons before commissioning of the line
Providing anti climbing device around the railway tower leg including cost of GI angle fencing wire, labour charges etc complete.
KSA Powerinfra Private Limited
TRANSGLOBAL POWER LIMITED
S.M.Tower Technology
Associated Power Structures Pvt. Ltd.
Mohan Power Infrastructure Pvt Ltd
TRANSGLOBAL POWER LIMITED
Associated Power Structures Pvt. Ltd.
S.M.Tower Technology
KSA Powerinfra Private Limited
TRANSGLOBAL POWER LIMITED
S.M.Tower Technology
Associated Power Structures Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.02 MB
Tender_Specification.pdf
Tender Documents • 1.14 MB
TowerScheduleLine-I.pdf
Tender Documents • 0.02 MB
TowerScheduleLine2.pdf
Tender Documents • 0.02 MB
KEY_PLAN-Abhshekpatti.pdf
Tender Documents • 0.14 MB
keyplan_Ngnr-samugarengapuram_230kv.pdf
Tender Documents • 0.09 MB
BOQ_170989.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid