| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41,200Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L1 | Accepted-Finance L1 | |
| 2 | L2₹42,500+₹1,300 (3.16%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹44,000+₹2,800 (6.80%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance L3 |
Tender Value
₹42,000
Closing Date
13 Sept 2021, 2:00 pmClosed
office of xen jal shakti phe mech div north jmu
office of xen jal shakti phe mech div north jmu
Repair to 500 mm dia. Sitlee Manda mild steel spirally welded rising main in Bazighar basti near RD-600.
2021_PHE_137154_1
e nit no. 141 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
5 days
sitlee nagrota
Please refer Tender documents.
10 documents required · 10 mandatory
₹200
office of xen jal shakti phe mech div north jmu
Exempted
13 Oct 2021
31 Aug 2021
14 Sept 2021
31 Aug 2021
13 Sept 2021
31 Aug 2021
Amount
Repair to 500 mm dia. Sitlee Manda mild steel spirally welded rising main near RD-600 in Bazighar basti. The job includes excavation of earth work by deploying the JCB machine which will be required for approx. 08 working hours until the completion of work. Excavating the earth and locating the rising main for its repairing which is approx.02 mtr. below the ground level. After excavating the earth and exposing the pipe carriage of gas cutter, oxyacetylene gas cylinders, welding cables, welding electrodes, dewatering pump set, flexible pipes and other allied material required as per site condition from workshop to the nearby site of work using mechanical transport and further carriage of material to actual site of work by manual labour. Job also includes carriage of DG welding set by connecting it with the mechanical transport to site of work. Laying of welding cable from DG welding set to the actual site of work. As the rising main is passing through the Bazighar Basti which is on the lower side and also beneath the ground and not having any provision of washout there is the need of dewatering the pipe by using dewatering pump set. After dewatering of the rising main welding job is to be done by first cleaning the damaged portion of pipe by using gas flame and cutting of the welding flux from the damaged joint / joints. Then welding the joint / joints by DG welding set with special purpose welding electrodes by welding the joint / joints in two layers. Properly chipping off the joint / joints in each successive layer to remove any welding defect and then reinforcing the joint by tagging the joint with MS strips across the joints. After completion the welding process cooling the pipe to atmospheric temperature and then testing the pipe on full lad condition for any leakages and then refilling, leveling and finishing the excavated earth by using JCB machine. Complete job includes cost of material, JCB machine charges, labour charges, hire and carriage charges etc. at site.
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
BEE AAR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .