Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
22 Jun 2026, 5:00 pm
EXECUTIVE ENGR. (C ), BR-XIV
516, D. H. ROAD, KOLKATA-700034
MAINTENANCE OF BITUMINOUS ROAD AT KASTA DANGA ROAD KANAI COACHING CENTRE NEAR PRE. NO. 28/1, 26/5 AND 26/11 ETC. IN WARD NO. 127
2026_KMC_1027994_1
KMC/XIV/127/003/26-27/R
Open Tender
CIVIL WORKS
14 days
WARD-127
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹6,000
13 Jun 2026
13 Jun 2026
24 Jun 2026
13 Jun 2026
22 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
5. Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (b) (i) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | 87 | CUBIC METER PERCENT | 379.82 | ₹33,044.34 |
| 2 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal /
Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & | 65.25 | CUBIC METER | 2,596.83 | ₹1,69,443.16 |
| 3 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018,
pg-228 item-1.03 (i), Pg-230,Table-I, It-4,) | - | SQUARE METER | 10.33 | - |
| 4 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture)
a) without paver finisher
i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 ) | - | SQUARE METER | 41 | - |
| 5 | Sub Total | - | - | - | - |
| 6 | GST 18% | 1 | Nos | - | - |
| 7 | CESS 1% | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TForm.pdf
Tender Documents • 0.40 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
BOQ_2525187.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid