| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | L1 | Accepted-AOC Award of Contracts | |
| 2 | L2₹14.9 L+₹2.2 L (17.5%)Rejected-Finance 9 NAROTTAM KUNJ MADHU NAGAR AGRA CANTT 282001 | AGRA | UTTAR PRADESH | 282001 | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹18.6 L+₹5.9 L (46.4%)Rejected-Finance D NO LIG 98 RAJEEV NAGAR KURMANNAPALEM VISAKHAPATNAM 530 048 | VISAKHAPATANAM | ANDHRA PRADESH | 530048 | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹21.7 L+₹8.9 L (70.3%)Rejected-Finance | L4 | Rejected-Finance Not being L1 | |
| 5 | Rejected-Technical 00 BEHIND CHARCH NAYAGOWAN LAKHERA BEHIND RAMA MANI DAIRY KATNI MADHYA PRADESH 483501 | KATNI | MADHYA PRADESH | 483501 | - | Rejected-Technical Firm is not enlisted in appropriate category |
| Sl No | Description | Qty | Unit | M/s SCHOLASTIC ENTERPRISES L2 | MONITOR ENGINEERING WORKS L3 | SHRI SAINATH ENGINEERS L4 | YAUK ENGINEERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance of 10 passenger (680 kg.) electrically operated passenger lift service to ground + 5 floors with fully automatic door with V3F drivn system at SRE building etc complete all as specified and directed. Make of lift Johnson. | 11 | Per Month | 22,000 ₹2,42,000 | 26,000 ₹2,86,000 | 30,000 ₹3,30,000 | 20,000 ₹2,20,000 Lowest |
| 2.00 | Comprehensive maintenance of 08 passenger(544 kg.) electrically operated passenger lift service to ground + 2 floors with fully automatic door with V3F drivn system at 251 SU building etc complete all as specified and directed. Make of lift Johnson. | 11 | Per Month | 19,000 ₹2,09,000 Lowest | 23,000 ₹2,53,000 | 28,000 ₹3,08,000 | 20,000 ₹2,20,000 |
| 3.00 | Comprehensive maintenance of 08 passenger(544 kg.) electrically operated passenger lift service to ground + 4 floors with fully automatic door with V3F drivn system at ATC building etc complete all as specified and directed. Make of lift Johnson
Note for item 1,2&3:-
(i) The entire work mentioned at item No. 1, 2 & 3 including comprehensive, preventive and periodical maintenance of lifts/ elevators shall be got executed through OEM such as M/S Johnson Lifts Pvt. Ltd. etc only. The contractor shall submit the hard copy of MOU for AMC with lifts manufacuturer to the deptt before commencement of workfor 11 months on stamp paper.
(ii) Contractor shall deploy trained trademen directly employed and supervised by OEM or reputed firm. The trademen shall be quailifed to keep equipment properly and take care to maintain the elevators equipment in proper and safe operating condition.
(iii) Contractor/OEM shall regularly and systematically examine, adjust, lubricate as required all elevator parts such as gear, motor, controller, V3F drive, lift cabin and all connected parts of lift and make them functional.
(iv) Contractor shall attend the break downs immeadiately on receipt of complaints verbal or written by User/JE/Engr-in-charge within 24 hrs. (v) In case of emergency, contracor shall attend to the break down within 24 hours, faiiling which a panel recovery of Rs 2000/- per day will be made from contractors dues for delay in rectification of breakdown.
(vi) Contractor shall provide all safety equipments to his tradesmen for their safety while working on lifts/cranes and with all electrical equipments without any extra cost to department.
(vii) Contractor/OEM rep shall periodically equalize the tension on the hoisting to maintain an adequate factor of safety. | 11 | Per Month | 22,000 ₹2,42,000 | 26,000 ₹2,86,000 | 31,000 ₹3,41,000 | 20,000 ₹2,20,000 Lowest |
| 3.10Note for item 1,2&3:- (viii) Contractor shall examine periodically all safety devices and make monthly, quarterly, half yearly and yearly safety tests as per OEM recommendedation. Monthly report to be submitted the concern GE office. (ix) Any number of complains attended shall deemed to be quoted rates. (x) The detailed lift mechnic of the firm shall report to the JE concerned at the lift complaint cell for receiving the compliants at round the clock daily including sunday and holiday. (xi) Cost of minor spare parts/ rountine material reuired for above mentioned maintenace is deemed to be included in the quoted rate. No additional cost of spares is admissible for the above maintenance. Decision of the accepting officer shall be final & binding regarding minor spares/routine material. (xii) The following routine materials required for above mentioned maintenance is deemed to be included in the qouted rate, decision of the accepting officer shall be final. (a) PCB contactors, transformers,chock and other controller component (b) VVVF drive (c) Rollers, Bearings, solenoids coils (d) Relays in controller, Push button, indiactors, door contacts (e) Push buttons, Limit switches (f) Brake shoe, Liners (g) Contacts, magnetic switches, magnets (h) Door motor& Drive, encoder (j) Car door safety device, infrared screen Governor, Interlocks on hoist way doors, Motors, Ropes, Travelling cable, Repairing of ARD unit, siren, ceiling light,ARD battery. | |||||||
| 4.00 | S&F car cabin fan suitable for lift LH6092 LD2518 and LE3171 as per existing shape size and capacity complete all as specified and directed. | 3 | Each job | 8,000 ₹24,000 | 12,000 ₹36,000 | 1,600 ₹4,800 Lowest | 4,500 ₹13,500 |
| 5.00 | M&L for servicing of EOT cranes of 2 ton capacity thoroughly and replacement of unserviceable parts/items after taking down complete including load testing for satisfactorly working of cranes all as specified and directed by Engr-in-Charge . Note: (i) Major Parts/items shall be measured and paid seperately . | 1 | Each job | 15,000 ₹15,000 | 18,000 ₹18,000 | 2,300 ₹2,300 Lowest | 8,000 ₹8,000 |
| 6.00 | M&L for servicing of EOT cranes of 10 ton capacity thoroughly and replacement of unserviceable parts/items after taking down complete including load testing for satisfactorly working of cranes all as specified and directed by Engr-in-Charge . Note: (i) Major parts/items shall be measured and paid seperately . | 1 | Each job | 30,000 ₹30,000 | 33,000 ₹33,000 | 38,000 ₹38,000 | 12,000 ₹12,000 Lowest |
| 7.00 | M&L for servicing of HOT/TLTS cranes of 1 ton capacity thoroughly and replacement of unserviceable parts/items after taking down complete including load testing for satisfactorly working of cranes all as specified and directed by Engr-in-Charge . Note: (i) Major Parts/items shall be measured and paid seperately. | 8 | Each job | 7,000 ₹56,000 | 10,000 ₹80,000 | 14,000 ₹1,12,000 | 5,000 ₹40,000 Lowest |
| 8.00 | Checking of over head cranes any size,type , capacity and location for functioning of motors, unusual noise and nut bolt washers etc including testing for smooth functioning and inform Engr in Charge for repair if required complete all as directed by Engr-in-charge.
Note: Contractor shall provide all safety equipments to his tradesmen for their safety while working on cranes and with all electrical equipments without any extra cost to department. | 20 | Each Job | 1,000 ₹20,000 | 1,400 ₹28,000 | 1,700 ₹34,000 | 500 ₹10,000 Lowest |
| 9.00 | S&F in replacement Limit switch of suitable size for 2 ton capacity crane as per sample. | 3 | Each | 3,000 ₹9,000 | 3,300 ₹9,900 | 3,800 ₹11,400 | 1,000 ₹3,000 Lowest |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
1 Nov 2025, 6:00 pmClosed
CWE (AF) AGRA
CWE(AF) Agra
COMPREHENSIVE MAINT AND REPAIR TO LIFTS, GANTRY AND CRANES INSTALLED UNDER GE (AF) TECH AREA AGRA
2025_MES_726532_2
80025-11/E8
Open Tender
Miscellaneous Works
Item Rate
330 days
Agra (Airforce Station)
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) TECH AREA, AGRA
₹30,000
Yes
9 Dec 2025
18 Oct 2025
8 Nov 2025
18 Oct 2025
1 Nov 2025
25 Oct 2025
18 Oct 2025 - 21 Oct 2025
Amount
Comprehensive maintenance of 10 passenger (680 kg.) electrically operated passenger lift service to ground + 5 floors with fully automatic door with V3F drivn system at SRE building etc complete all as specified and directed. Make of lift Johnson.
Comprehensive maintenance of 08 passenger(544 kg.) electrically operated passenger lift service to ground + 2 floors with fully automatic door with V3F drivn system at 251 SU building etc complete all as specified and directed. Make of lift Johnson.
Comprehensive maintenance of 08 passenger(544 kg.) electrically operated passenger lift service to ground + 4 floors with fully automatic door with V3F drivn system at ATC building etc complete all as specified and directed. Make of lift Johnson Note for item 1,2&3:- (i) The entire work mentioned at item No. 1, 2 & 3 including comprehensive, preventive and periodical maintenance of lifts/ elevators shall be got executed through OEM such as M/S Johnson Lifts Pvt. Ltd. etc only. The contractor shall submit the hard copy of MOU for AMC with lifts manufacuturer to the deptt before commencement of workfor 11 months on stamp paper. (ii) Contractor shall deploy trained trademen directly employed and supervised by OEM or reputed firm. The trademen shall be quailifed to keep equipment properly and take care to maintain the elevators equipment in proper and safe operating condition. (iii) Contractor/OEM shall regularly and systematically examine, adjust, lubricate as required all elevator parts such as gear, motor, controller, V3F drive, lift cabin and all connected parts of lift and make them functional. (iv) Contractor shall attend the break downs immeadiately on receipt of complaints verbal or written by User/JE/Engr-in-charge within 24 hrs. (v) In case of emergency, contracor shall attend to the break down within 24 hours, faiiling which a panel recovery of Rs 2000/- per day will be made from contractors dues for delay in rectification of breakdown. (vi) Contractor shall provide all safety equipments to his tradesmen for their safety while working on lifts/cranes and with all electrical equipments without any extra cost to department. (vii) Contractor/OEM rep shall periodically equalize the tension on the hoisting to maintain an adequate factor of safety.
Note for item 1,2&3:- (viii) Contractor shall examine periodically all safety devices and make monthly, quarterly, half yearly and yearly safety tests as per OEM recommendedation. Monthly report to be submitted the concern GE office. (ix) Any number of complains attended shall deemed to be quoted rates. (x) The detailed lift mechnic of the firm shall report to the JE concerned at the lift complaint cell for receiving the compliants at round the clock daily including sunday and holiday. (xi) Cost of minor spare parts/ rountine material reuired for above mentioned maintenace is deemed to be included in the quoted rate. No additional cost of spares is admissible for the above maintenance. Decision of the accepting officer shall be final & binding regarding minor spares/routine material. (xii) The following routine materials required for above mentioned maintenance is deemed to be included in the qouted rate, decision of the accepting officer shall be final. (a) PCB contactors, transformers,chock and other controller component (b) VVVF drive (c) Rollers, Bearings, solenoids coils (d) Relays in controller, Push button, indiactors, door contacts (e) Push buttons, Limit switches (f) Brake shoe, Liners (g) Contacts, magnetic switches, magnets (h) Door motor& Drive, encoder (j) Car door safety device, infrared screen Governor, Interlocks on hoist way doors, Motors, Ropes, Travelling cable, Repairing of ARD unit, siren, ceiling light,ARD battery.
S&F car cabin fan suitable for lift LH6092 LD2518 and LE3171 as per existing shape size and capacity complete all as specified and directed.
M&L for servicing of EOT cranes of 2 ton capacity thoroughly and replacement of unserviceable parts/items after taking down complete including load testing for satisfactorly working of cranes all as specified and directed by Engr-in-Charge . Note: (i) Major Parts/items shall be measured and paid seperately .
M&L for servicing of EOT cranes of 10 ton capacity thoroughly and replacement of unserviceable parts/items after taking down complete including load testing for satisfactorly working of cranes all as specified and directed by Engr-in-Charge . Note: (i) Major parts/items shall be measured and paid seperately .
M&L for servicing of HOT/TLTS cranes of 1 ton capacity thoroughly and replacement of unserviceable parts/items after taking down complete including load testing for satisfactorly working of cranes all as specified and directed by Engr-in-Charge . Note: (i) Major Parts/items shall be measured and paid seperately.
Checking of over head cranes any size,type , capacity and location for functioning of motors, unusual noise and nut bolt washers etc including testing for smooth functioning and inform Engr in Charge for repair if required complete all as directed by Engr-in-charge. Note: Contractor shall provide all safety equipments to his tradesmen for their safety while working on cranes and with all electrical equipments without any extra cost to department.
S&F in replacement Limit switch of suitable size for 2 ton capacity crane as per sample.
S&F in replacement Limit switch of suitable size for 10 ton capacity crane as per sample.
S&F in replacement Contactor of 40 Amps 3 pole.
S&F in replacement Dog with spring as per sample.
S&F in replacement bearing 2310 & 2305 with pedastal in transmission shaft.
S&F in replacement Ratchet gear as per sample
S&F in replacement Operation switch as per sample.
S&F in replacement Emergency switch as per sample.
S&F in replacement Gear oil for gear box of crane with suitable grade complete all as specified and directed.
S&F in replacement brake oil for gear box of crane with suitable grade complete all as specified and directed.
S&F in replacement ARD Battery (12V-18 AH) complete all as specified and directed.
S&F in replacement Charger Battery (12V-2.5 AH) complete all as specified and directed.
S&F in replacement Pit switch with box & Cover (Round Type)complete all as specified and directed.
S&F in replacement Controller cooling fan complete all as specified and directed.
S&F in replacement Cable 3 core 1 sqmm complete all as specified and directed.
S&F in replacement Push Button KA131 BRAILLE UP-Orange complete all as specified and directed.
S&F in replacement Push Button KA131 BRAILLE DN-Orange complete all as specified and directed.
S&F in replacement Emergency Lamp Board (LED) complete all as specified and directed.
S&F in replacement 12 Volt Siren complete all as specified and directed.
S&F in replacement Cross Flow fan complete all as specified and directed.
S&F in replacement Bearing Oil complete all as specified and directed.
S&F in replacement Nylon Roller U Assy complete all as specified and directed.
S&F in replacement Metal Roller V Assy complete all as specified and directed.
S&F in replacement POD latch LH complete all as specified and directed.
S&F in replacement POD latch RH complete all as specified and directed.
S&F in replacement Oil Tank Assy-10mm complete all as specified and directed.
S&F in replacement Charger Unit complete all as specified and directed.
S&F in replacement Door Slipper (POD) complete all as specified and directed.
S&F in replacement Pickle skate moving Assy complete all as specified and directed.
S&F in replacement Three way intercom complete all as specified and directed.
S&F in replacement Telephone cable 4 core complete all as specified and directed.
S&F in replacement Door Rope (C.0 700mm) complete all as specified and directed.
S&F in replacement BCD interface board with GONG driver SG 602 complete all as specified and directed.
S&F in replacement DOT matrix with Dynamic scrolling complete all as specified and directed.
S&F in replacement KDS Break realising cable -05 Mtr length complete all as specified and directed.
S&F in replacement Add ON block 3 NO+1 NC (TC) complete all as specified and directed.
S&F in replacement ADD on Block 4 N/O complete all as specified and directed.
S&F in replacement ADD ON block (2NO+2NC+Siemens) complete all as specified and directed.
S&F in replacement Door Limit switch wit 2NO+2NC-LH complete all as specified and directed.
S&F in replacement Door Limit switch wit 2NO+2NC-RH complete all as specified and directed.
M/s SCHOLASTIC ENTERPRISES (BID ID -3461233)
MONITOR ENGINEERING WORKS (BID ID -3462480)
SHRI SAINATH ENGINEERS (BID ID -3462885)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_824042.xls
BOQ • 0.30 MB
retenderdocs17oct25.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .