Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-AOC A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹1.3 Cr Quoted ₹1.1 Cr | L-1 | Accepted-AOC BEING L-1 BIDDER |
| 2 | L-2₹1.2 Cr+₹5.0 L (4.43%)Rejected-Finance CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | ₹1.2 Cr+₹5.0 L (4.43%) | L-2 | Rejected-Finance REJECTED NOT BEING L-1 BIDDER |
| 3 | Rejected-Technical MAIN ROAD JARHI POST BHATGAON DISTT SURAJPUR C G PIN 497235 | SURAJPUR | CHHATTISGARH | 497235 | - | - | Rejected-Technical REJECTED DUE TO UNDERTANKING NOT UPLOADED |
Tender Value
₹1.3 Cr
EMD Value
₹1.6 L
Closing Date
22 Mar 2023, 5:00 pmClosed
STAFF OFFICER (M), SECL, BHATGAON AREA
STAFF OFFICER (M), SECL, BHATGAON AREA
Roof bolting for roof support with DGMS approved portable hydraulic roof bolting machine with drilling arrangement to drill 1.50m long hole in roof having hard strata with 27 mm dia. drill bit for anchoring of 20/22 mm dia roof bolt with resin capsul
2023_SECL_273994_1
GM/BHAT/SUR/eTender/2022-23/36 DT 06/03/2023
Open Tender
Civil Works - Others
Item Rate
365 days
BHATGAON COLLIERY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.6 L
26 Apr 2023
6 Mar 2023
24 Mar 2023
6 Mar 2023
22 Mar 2023
7 Mar 2023
6 Mar 2023 - 17 Mar 2023
Amount
Item Description/ Heading
Roof Support of Roof bolting:-(a) Including loading of roof bolt bearing plate W-strap and resin capsule in to tub at Incline mouth and unloading the same at destination at U/G (b) Drilling of 1.50 mtr.long hole at the roof (Shale or stone) (c) Fixing jamming of roof bolt (1.0mtr.interval) with fitting of bearing plates and tightening of nuts. Note:(1) Roof bolt rod bearing plate resin capsule electric power and water will supply departmently on free of cost. (2) Transportation of roof bolts rod bearing plate nut resin capsule power cable water hoses and shifting of power pack shall be done by contractor . (3) Power cable and water hoses from power pack to drill machine shall be supplied by contractor. (4) Shifting of power pack and drill machine shall be done by contractor. (5) Hydraulic oil for power pack shall be supplied by contractor (6) Drill rod drill bit and other necessary parts hoses etc of the drilling machine required there is will be arranged by contractor (7) All maintenance and related shifting by contractor. (8)Hudraulic wet drilling shall be used to avoid manual drilling in roof (9) Hydraulic roof drilling machine with power pack will be supplied by contractor.
TOTAL IMPACT OF GST FOR THE PURPOSE OF CTC
Ram Awadh Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .