Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance 202 1ST FLOOR VIVEKANAND PURI MALKAGANJ SARAI ROHILLA NORTH DELHI DELHI 110007 UDYAM DL 01 0065084 | NORTH DELHI | DELHI | 110007 | ₹1.3 L | L1 | Accepted-Finance ok |
| 2 | L2₹1.5 L+₹19,890 (14.8%)Accepted-Finance | ₹1.5 L+₹19,890 (14.8%) | L2 | Accepted-Finance ok |
| 3 | L3₹3.3 L+₹2.0 L (147.5%)Accepted-Finance | ₹3.3 L+₹2.0 L (147.5%) | L3 | Accepted-Finance ok |
| 4 | L4₹4.3 L+₹3.0 L (219.9%)Accepted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | ₹4.3 L+₹3.0 L (219.9%) | L4 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | M/S. R. K. Electricals L3 | M G Traders and Engineers L4 | MITTAL TRADING COMPANY L1 | Gupta Brothers L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Running & Operation of Pump sets i/c operation of LT panel Switch Gears, isolation system & all other electrical & mechanical Equipment’s to maintain the water supply from B.P.S. to command area of the pump house. The work is also involve cleaning & sweeping of the pump house area including watch & ward at of BPS/SPS with following total staff who will be deployed in shift of the days as per site requirement:-
Total staff:-
Semi-Skilled:- Total – 02 Nos.
Unskilled:- Total – 03 Nos.
Total no. of shift of APD (Semi-skilled) | 90 | Days | 1,66,410 ₹1,66,410 | 1,80,000 ₹1,80,000 | 70,560 ₹70,560 Lowest | 81,000 ₹81,000 |
| 1.02 | Total no. of shift of Beldar (Unskilled) | 90 | Days | 1,66,410 ₹1,66,410 | 2,50,200 ₹2,50,200 | 63,900 ₹63,900 Lowest | 73,350 ₹73,350 |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
23 Mar 2026, 3:00 pmClosed
Ex. Engineer (E and M) M-10
Office of the Ex. Engineer (E and M) M-10 Pocket 1 Sector 7 Dwarka
Deployment of operation staff for running and operation of online Booster at Gulmohar Park in Malviya Nagar Constituency AC-43
2026_DJB_288402_30
NIT NO. 26 (2025-26)/EE(EnM)M-10
Open Tender
Miscellaneous Works
Works
90 days
Office of the Ex. Engineer (E and M) M-10
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Account No SB 06121000095461
₹8,600
Yes
31 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
Running & Operation of Pump sets i/c operation of LT panel Switch Gears, isolation system & all other electrical & mechanical Equipment’s to maintain the water supply from B.P.S. to command area of the pump house. The work is also involve cleaning & sweeping of the pump house area including watch & ward at of BPS/SPS with following total staff who will be deployed in shift of the days as per site requirement:- Total staff:- Semi-Skilled:- Total – 02 Nos. Unskilled:- Total – 03 Nos. Total no. of shift of APD (Semi-skilled)
Total no. of shift of Beldar (Unskilled)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
NIT26.pdf
Tender Documents • 1.33 MB
BOQ_382507.xls
BOQ • 0.31 MB
corr.pdf
PDF • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .