Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹5.7 L+₹5,341.90 (0.95%)Accepted-Finance | L2 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹11,400
Closing Date
25 Oct 2022, 11:15 amClosed
Executive Engineer (EnM) M-7
Office of the Executive Engineer (EnM) M-7 Nangloi Phase-III, Near Surajmal Statdium Metro Station New Delhi-110041.
S. I. T. C. of Pump Set (90 KW) with all allied equipments at Y- Block Mangolpuri Pump House comes under AC-10 (Electrical Works).
2022_DJB_231135_20
e-NIT No.05 / (EnM) M-7/ 2022-23
Open Tender
Miscellaneous Works
Works
30 days
Nangloi Ph-III EE EnM M-7
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
Account No SB 50448339804
₹11,400
Yes
11 Nov 2022
18 Oct 2022
25 Oct 2022
18 Oct 2022
25 Oct 2022
18 Oct 2022
S/O Manually operated oil immersed sheet steel clad floor mounted type auto transformer starter as per IS: 13947(Part 1&4) with 1 No. under voltage release, 3 Nos. magnetic overload release with oil dashpot time lags 1 No. stop leaver, plain entries for PVC cables & auto transformer with 50%, 65% & 80% tapping, 415V, 3 phase, 50Hz without oil filling, Heavy duty with double contact & strip wound overload coil 81-100 HP. Make: Advance / or any other make approved by DJB.
Supply of Transformer oil for starter Make – Savita / Power
Installation of above new starters at site along with required material i/e end termination with copper thimble, copper flexible wire for making end termination as per site requirement ,flexible pipe for cabling from starter to motor etc. The job also includes grouting of new ATS with fastener and also making of base to support the starter with allied works as per site requirement.
Providing of 185 Sq. mm Single core Aluminum Conductor, XLPE insulated, Armored as per IS,PVC Type ST2 sheathed Make: Havells/Universal/ DJB approved
Laying of cables between ACB/LT Panel and motor and also between the motor and the starter in cable trench/tray as per site requirement. SOR 37.4.3
Testing and Commissioning of the complete system - Pump / Motors / starter / ACB after completion of all the above works first at No Load & then at On Load The job further includes any left out items required during execution of work will be responsibility of firm& no extra payment will be paid.
HYDROCON ENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .