| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹3.2 L (2.33%)Admitted-Finance | ₹1.4 Cr+₹3.2 L (2.33%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical INVALIED |
| Sl No | Description | Qty | Unit | MEGHALAYA CONSTRUCTION AND SUPPLY CO. L1 | M/s TOVISHE ACHUMI L2 |
|---|---|---|---|---|---|
| 1.00 | SCHEDULE ‘A’ PART- I ( Internal Roads Shokhuvi) : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: (All kinds of soil) | 829.5 | sqm | 84,609 ₹84,609 Lowest | 87,097.5 ₹87,097.5 |
| 2.00 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 829.5 | sqm | 1,40,185.5 ₹1,40,185.5 Lowest | 1,45,162.5 ₹1,45,162.5 |
| 3.00 | Supplying and stacking at site, 90 mm to 45 mm size stone aggregate. | 235.95 | Cum | 4,66,237.2 ₹4,66,237.2 Lowest | 4,67,181 ₹4,67,181 |
| 4.00 | Supplying and stacking at site, 63 mm to 45 mm size stone aggregate. | 476.4 | Cum | 7,86,060 ₹7,86,060 Lowest | 7,90,824 ₹7,90,824 |
| 5.00 | Supplying and stacking at site, Stone screening 11.2 mm nominal size (Type B). | 51.91 | Cum | 1,10,773.81 ₹1,10,773.81 Lowest | 1,11,085.26 ₹1,11,085.26 |
| 6.00 | Laying spreading and compacting stone aggregate of specified size to WBM specification in unifrom thickness, hand picking rolling with 3 sheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and cambe, applying and brooming requisite type of screeing/binding material to fill up interstices of coarse aggregate, watering and compacting to the required density | 712.36 | Cum | 5,86,984.64 ₹5,86,984.64 Lowest | 5,91,258.8 ₹5,91,258.8 |
| 7.00 | Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity. | 2,845.5 | Sqm | 73,983 ₹73,983 Lowest | 85,365 ₹85,365 |
| 8.00 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On W.B.M @ 0.75 Kg/sqm | 2,235 | Sqm | 1,00,575 ₹1,00,575 Lowest | 1,11,750 ₹1,11,750 |
| 9.00 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : on bituminous surface @0.50Kg/sqm | 610.5 | Sqm | 22,588.5 ₹22,588.5 Lowest | 24,420 ₹24,420 |
| 10.00 | 2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectivley per 100 sqm abd 52 kg and 56 kg of hot bitumenper cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidtion with road roller of 6 of 9 tonne capacity etc. completer(rack coat to be paid for separeately) With paving asphalt grade VG-10 heated and the mixed with solvent at the rate of 70 grams per kg of asphalt | 2,845.5 | Sqm | 6,34,546.5 ₹6,34,546.5 Lowest | 6,40,237.5 ₹6,40,237.5 |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
24 Nov 2023, 10:30 amClosed
SO-I(Wks)
SO-I(Wks) ARTC and School Shokhuvi
Special repair to internal roads of firing range by widening, re-carpeting, pot holes, culverts, etc at ARTC S at Shokhuvi (Nagaland) and culvert, storm water drains, boundary walls, by re-plastering, strengthening allied services at ARTC S Diphu (As
2023_ARMHA_778260_2
8021/ARTCS/ENGR/SRW-2023/33
Open Tender
Civil Works
Works
270 days
Shokhuvi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Commandant, ARTC and School
₹2.8 L
23 Jan 2024
11 Nov 2023
25 Nov 2023
11 Nov 2023
24 Nov 2023
11 Nov 2023
11 Nov 2023 - 23 Nov 2023
SCHEDULE ‘A’ PART- I ( Internal Roads Shokhuvi) : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: (All kinds of soil)
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
Supplying and stacking at site, 90 mm to 45 mm size stone aggregate.
Supplying and stacking at site, 63 mm to 45 mm size stone aggregate.
Supplying and stacking at site, Stone screening 11.2 mm nominal size (Type B).
Laying spreading and compacting stone aggregate of specified size to WBM specification in unifrom thickness, hand picking rolling with 3 sheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and cambe, applying and brooming requisite type of screeing/binding material to fill up interstices of coarse aggregate, watering and compacting to the required density
Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity.
Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On W.B.M @ 0.75 Kg/sqm
Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : on bituminous surface @0.50Kg/sqm
2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectivley per 100 sqm abd 52 kg and 56 kg of hot bitumenper cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidtion with road roller of 6 of 9 tonne capacity etc. completer(rack coat to be paid for separeately) With paving asphalt grade VG-10 heated and the mixed with solvent at the rate of 70 grams per kg of asphalt
SCHEDULE ‘A’ PART- I ( Hume pipe Culvert, Shokhuvi ) :Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means in foundation trenches ( not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m for all kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all work upto plinth level 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregates 40 mm nominal size)
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : (Use 600 mm dia. R.C.C. pipe)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all work upto plinth level 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregates 20 mm nominal size)
Filling available excavated earth ( excluding rock) in trenches, plinth sides of foundations etc in layers not exc 20 cm in depth, consolidating each deposited layers by ramming and watering lead upto 50 m and lift upto 1.5m.
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand)
Providing and laying 20 mm thick Cement plaster 1:2 (1 Cement : 4 stone dust) on joints of hume pipe. (Out Side)
Providing and laying 15 mm thick Cement plaster 1:4 (1 Cement : 4 Coarse sand) on rough side of single or half brick wall. (Out Side)
SCHEDULE ‘A’ PART- I ( Drain with cover, Shokhuvi ) : Earth work in excavation in fdn trenches incl dressing of sides and ramming of bottoms lift upto 1.5 m incl getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50 m in all kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (Use 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
M & L for brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: (Use cement mortar 1:4 (1 cement : 4 coarse sand))
M & L for 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : (Use 1:4 (1 cement: 4 fine sand)
Providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size).
M/L for steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (use Thermo-Mechanically Treated bars.) Note: Schedule of Credit mentioned at page No.17 of NIT shall be deducted from tender amount
SCHEDULE ‘A’ PART- II (Boundary Wall, Diphu ) : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed
Repair to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm M/L for earth work in excavation in trenches n exc 1.5m deep and wide and getting out in soft soil.
Providing and laying in position PCC (1:3:6) mix using 40 mm graded stone aggregates in foundation trenches.
Providing and constructing brick wall in cement mortar 1:6 using non modular brick .
Providing and laying in position reinforced cement concrete (1:1½ : 3 ) with 20 mm nominal size stone aggregates , excluding the cost of centering, shuttering, finishing and reinforcement , all work upto plinth level.
- Ditto - but in column.
- Ditto – but in beams and coping.
Providing and placing steel reinforcement for RCC work incl straightening, cutting, bending , placing in position and binding etc all complete. ( TMT bar)
Providing and laying formwork to sides of concrete including strutting, propping etc and removal of form for foundations, footings, bases of columns etc.
- Ditto - but for plinth beam, copping and link beam.
- Ditto - but for Columns.
Providing and laying 15 mm thick cement plaster 1:4 ( 1 cement : 4 coarse sand) in brick wall.
Providing and finishing walls with two or more coats water proofing cement paint of reqd shade in new work incl one coat of water thinnable cement primer of approved brand and manufacture on wall surface.
Providing and fabricating, erecting of steel work in built up section/frame work incl cutting, hoisting, fixing in position and applying a primer coat of approved steel primer all complete
Providing and fixing GI barbed wire with angle iron post placed at reqd distance embedded in cement concrete, of barbed wire weighing 9.38 kg per 100m ( minimum) fixed with GI staples, turn buckles etc complete
Providing and painting with two or more coats aluminum paint of approved brand and manufacture to give an even shade ..
SCHEDULE ‘A’ PART- II (Protective work, Diphu) : Earth work in excavation in fdn trenches incl dressing of sides and ramming of bottoms lift upto 1.5 m incl getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50 m in all kind of soil.
Providing and laying in position cement concrete of specified grade with cement mortar 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agge 40 mm nominal size) excluding the cost of centering and shuttering.
Providing and laying 50 mm thick cement concrete 1;2;4 (1 cement: 2 coarse sand :4 graded stone 20 mm nominal size agg) excluding the cost of centering and shuttering in copping
RR masonry with hard stone in fdn and superstructure incl leveling up with cement concrete 1:6:12 (1 cement:6 coarse sand: 12 graded stone agg 20mm nominal size) with cement mortar 1:6 (1 cement : 6 coarse sand)
Pointing on stone work with cement mortar 1:3 (1 cement : 3 sand) with raised and cut pointing.
Providing and fixing on wall unplasticised rigid PVC pipes 75 mm dia weep holes
Centering and shuttering incl strutting, propping etc complete and removal of form work for copping.
SCHEDULE ‘A’ PART- II (Drain work, Diphu ) :Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches (not exc 1.5m in width or 10 sqm on plan), incl dressing of sides and ramming of bottoms lift upto 1.5m incl getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m in all kind of soil.
Providing and laying in position plain cement concrete with cement mortar 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregates 40mm nominal size) excluding the cost of centering and shuttering.
Providing and laying in position plain cement concrete with cement mortar 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregates 20 mm nominal size) excluding the cost of centering and shuttering.
Providing and laying 15mm thick cement plaster with cement mortar 1:4 (1 Cement : 4 Coarse sand) on brick wall and RCC pillars.
SCHEDULE ‘A’ PART-II (Culvert, Diphu ) :Earth work in excavation in fdn trenches incl dressing of sides and ramming of bottoms lift upto 1.5 m incl getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m in all kind of soil.
Supply and laying of hard core with stone agg of 63 mm size deposited, spread and leveled in layers n.exc 15 cm thick, watered and ramming to true surface etc complete.
Providing and laying in position cement concrete of specified grade with cement mortar 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone agg 40 mm nominal size) excluding the cost of centering and shuttering.
Centering and shuttering including strutting, propping etc. and removal of form for foundation, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for walls (any thickness ) including attached pilasters and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for suspended slab and access platform. with water proof ply 12mm thick.
Providing and placing steel reinforcement for RCC work incl straightening, cutting, bending and binding etc. all complete of (TMT bar).
Providing and laying in position specified grade of reinforcement concrete (1:1½:3) with 20 mm nominal size stone aggregates, excluding the cost of centering, shuttering, finishing and reinforcement all work upto plinth level.
M/s TOVISHE ACHUMI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .