Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35,347Accepted-AOC P METTUPALAYAM PILLANATHAM P O TIRUCHENGODE TK NAMAKKAL 637 205 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637205 | L1 | Accepted-AOC aoc | |
| 2 | L2₹35,518+₹171 (0.48%)Rejected-Finance | L2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | G MOHANRAJ L1 | S S INFRA L2 |
|---|---|---|---|---|---|
| 1.00Patch work Type-B - Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 and Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which should consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) and Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper, trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required, including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 - INCL GST 18% | |||||
| 1.01 | Patch work Type-B | 11 | sqm | 696 ₹7,656 Lowest | 699 ₹7,689 |
| 2.00Patch work Type-C- Earthwork excavation complete direction as per the Deptl. Officers (100mm) and Conveyance of Excavated earth Complete Direction as per the Dept officers (5 KM) (40% of earth work qty) and Wet Mix Macadam, Providing, laying spreading and compacting Wet Mix Macadam with clean, crushed.graded aggregates and granular material and finised in accordance with the requirements of the specifications and thickness as per approve plans or as directed by the engineer (100mm) and Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 and Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5- INCL GST 18% | |||||
| 2.01 | Patch work Type-C | 22 | sqm | 828 ₹18,216 Lowest | 832 ₹18,304 |
| 3.00Patch work Type-A - Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 and Premix carpet with seal coat to 20mm thick, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. - INCL GST 18% | |||||
| 3.01 | Patch work Type-A - | 25 | sqm | 379 ₹9,475 Lowest | 381 ₹9,525 |
Tender Value
₹36,000
Closing Date
17 Nov 2025, 3:00 pmClosed
THE COMMISSIONER
TIRUCHENGODE MUNICIPALITY
Rectification of pot holes in BT/CC road due to natural calamaties, water supply and other works in Tiruchengode Municipality.
2025_MAWS_622826_1
4110/2025/E1
Open Tender
Civil Works - Roads
Works
30 days
TIRUCHENGODE MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
3 Dec 2025
12 Nov 2025
17 Nov 2025
12 Nov 2025
17 Nov 2025
12 Nov 2025
Amount
Patch work Type-B - Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 and Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which should consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) and Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper, trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required, including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 - INCL GST 18%
Patch work Type-B
Patch work Type-C- Earthwork excavation complete direction as per the Deptl. Officers (100mm) and Conveyance of Excavated earth Complete Direction as per the Dept officers (5 KM) (40% of earth work qty) and Wet Mix Macadam, Providing, laying spreading and compacting Wet Mix Macadam with clean, crushed.graded aggregates and granular material and finised in accordance with the requirements of the specifications and thickness as per approve plans or as directed by the engineer (100mm) and Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 and Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5- INCL GST 18%
Patch work Type-C
Patch work Type-A - Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 and Premix carpet with seal coat to 20mm thick, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. - INCL GST 18%
Patch work Type-A -
S S INFRA (BID ID -1513426)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
BOQ_744766.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .