Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39,600Admitted-Finance | ₹39,600 | L1 | Admitted-Finance |
| 2 | L2₹50,920Admitted-Finance | ₹50,920 | L2 | Admitted-Finance |
| Rank | Bidder | Total Amount |
|---|---|---|
| L1 | M/S RELIANCE ELECTRICALS Bid ID 2732788 | ₹39,600 |
| L2 | Competent Engineering Works Bid ID 2732892 | ₹50,920 |
| Sl No | Description | Qty | Unit | M/S RELIANCE ELECTRICALS L1 | Competent Engineering Works L2 |
|---|---|---|---|---|---|
| 1.00 | Repairs to the 50 KVA voltage stabilizer of WSS Ompora Colony
(i) Shifting 50 KVA voltage stabilizer to workshop and then raising the core assembly from the oil bath and removing damaged bush rods, damaged Bakelite plate, damaged voltage Regulator.
(ii) Providing and fitting of hand operated Bakelite plate drum type with minimum capacity of 60 Amp heavy duty voltage Regulator having suitable copper Contacts recessed in Bakelite plate having minimum,06 Boosting steps.
(ii) Providing and filling of 10 liters transformer oil of required grade and dielectric strength for topping up.
Re-assembling the unit and connecting it to the circuit and the testing on no load and full load. All tools, tackles and skilled & unskilled labours required for the job shall be arranged and brought to site by the contractor. The old scrap shall be retained by the firm. | 1 | Complete Job | 9,000 ₹9,000 | 16,750 ₹16,750 |
| 2.00 | Providing and fitting of G.I Channel including nuts and bolts for transformer bed at WSS Ompora Colony
ISMC 100 = 1x 2.7432 m = 2.7432 @9.2 kg/m = 25 kg
Nuts Bolts = 5 kg
Total - 30 Kgs | 30 | Kgs | 130 ₹3,900 | 174 ₹5,220 |
| 3.00 | Providing, fitting, installation and testing of cable end termination kits to 50mm Sq. 3core XLPE HT Aluminum cable at Water Supply Schemes Baghi Shakoor Shah and Qazipora, The Job includes: -
1. Taking proper shut down from the concerned electric division.
2. Lowering of cable from two poles HT Structure by involving skilled labor and allied items required at site.
3 Dismantling of the damaged cable kits from the lowered HT cable.
4. Providing and fitting of heat shrinkable 11 KV cable end termination kit for connecting 50 Sq mm XLPE cable with the existing HT line near tapping point / HT transformer as per site requirement by the skilled worker with all tools tackles required for the same.
5. The job further includes lifting up the cable back on the poles properly.
6. Connecting to electric circuit and testing on no load and on full load. | 3 | Complete Jobs | 8,900 ₹26,700 | 9,650 ₹28,950 |
Tender Value
₹44,700
Closing Date
16 Feb 2026, 11:00 amClosed
Executive Engineer JS PHE Mech. Rural Div. Sgr.
Executive Engineer JS PHE Mech. Rural Div. Sgr.
Electrical works to be carried out at various Water Supply Schemes of Sub-Division Budam
2026_PHE_302656_1
PHE/MRD/TS 69 OF 02/2026
Open Tender
Miscellaneous Works
5 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹50
Executive Engineer JS PHE Mech. Rural Div. Sgr.
3 Mar 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Repairs to the 50 KVA voltage stabilizer of WSS Ompora Colony (i) Shifting 50 KVA voltage stabilizer to workshop and then raising the core assembly from the oil bath and removing damaged bush rods, damaged Bakelite plate, damaged voltage Regulator. (ii) Providing and fitting of hand operated Bakelite plate drum type with minimum capacity of 60 Amp heavy duty voltage Regulator having suitable copper Contacts recessed in Bakelite plate having minimum,06 Boosting steps. (ii) Providing and filling of 10 liters transformer oil of required grade and dielectric strength for topping up. Re-assembling the unit and connecting it to the circuit and the testing on no load and full load. All tools, tackles and skilled & unskilled labours required for the job shall be arranged and brought to site by the contractor. The old scrap shall be retained by the firm.
Providing and fitting of G.I Channel including nuts and bolts for transformer bed at WSS Ompora Colony ISMC 100 = 1x 2.7432 m = 2.7432 @9.2 kg/m = 25 kg Nuts Bolts = 5 kg Total - 30 Kgs
Providing, fitting, installation and testing of cable end termination kits to 50mm Sq. 3core XLPE HT Aluminum cable at Water Supply Schemes Baghi Shakoor Shah and Qazipora, The Job includes: - 1. Taking proper shut down from the concerned electric division. 2. Lowering of cable from two poles HT Structure by involving skilled labor and allied items required at site. 3 Dismantling of the damaged cable kits from the lowered HT cable. 4. Providing and fitting of heat shrinkable 11 KV cable end termination kit for connecting 50 Sq mm XLPE cable with the existing HT line near tapping point / HT transformer as per site requirement by the skilled worker with all tools tackles required for the same. 5. The job further includes lifting up the cable back on the poles properly. 6. Connecting to electric circuit and testing on no load and on full load.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_982356.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid