Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹16.2 LAWARDED | AWARDED |
Tender Value
₹20.8 L
EMD Value
₹25,000
Closing Date
19 Jun 2025, 10:00 pmClosed
Directorate of Municipal Administration
Construction of road and drain work at 3rd main 3rd cross Vasavi nagara ward no 3 under Tumkur city corporation limits.
DMA/2025-26/RD/WORK_INDENT40915
DMA/2025-26/RD/WORK_INDENT40915
Reserved
Roads
Electronic Documents, First(One Cover)
DMA City Corporation Tumakuru
₹530
₹25,000
4 Jun 2025
4 Jun 2025
10 Jun 2025
Construction of road and drain work at 3rd main 3rd cross Vasavi nagara ward no 3 under Tumkur city corporation limits
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacte...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), c...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 35% of item concrete rate for drain wa...
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 5% of item concrete rate for drain bed...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired stee...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .