Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
14 Sept 2026, 12:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
W3
17 conditions · 5 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The Balance Sheet and all other Financial documents attested/certified by the Chartered Accountant (CA) to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN failing which the offer shall be considered as incomplete and will be summarily rejected without any further reference.
As Per Clause No. 10 of IR GCC-2022, For participating in tender,The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
(A)Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or (B) Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or (C) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender).
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered atleast 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates.In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Any P.Way work.
10 conditions · 4 needing a document upload
Experience, financial status and ability: Tenderer is required to submit documents detailed here under for evaluation of his credentials.
Employment/Partnership etc. of Retired Railway Employees.:- The tenderer has to give required information regarding association of Retired Railway Employees either as Employee or Partnership etc. in the per-forma as enclosed Annexure-I to this chapter of this tender document as per clause No. 16(a) of IR GCC-2022.
List of works completed & in hand: Tenderer is required to submit, along with his tender, particulars of all works completed by him including works in hand for the Railways or for any other client in the Per-forma enclosed as Annexure-II to this chapter of this tender document. Figures of cost shall not include cost of materials supplied free of cost by the client to the contractor. The tender without this information may be treated as if the tenderer has no works in hand. Supportive documents from the organizations with which the tenderer is workings should be enclosed giving description of work, contract value, date of award, approximate date value of balance work.
List of court cases and arbitration cases: Tenderer is also required to submit, along with his tender, list of arbitration's demanded from any clients during the last five years preceding the date of opening of this tender as per Annexure-III/A to this chapter of this tender document. The tenderer is also required to submit, along with his tender, list of court cases filed against any clients during the last five years preceding the date of opening of this tender as per Annexure-III/B to this chapter of this tender document.
List of plant and machinery: Tenderer has to make his own arrangements for execution of works. The tenderer is required to submit, along with his tender, list of plant and machinery available on hand (own) and proposed to be inducted (own and hired to be given separately) for the subject work in Proforma given in Annexure-IV to this chapter of this tender document. The tender without this information may be treated as if the tenderer has no plant and machinery available on hand (own) and that no plant and machinery are proposed to be inducted for the subject work.
List of personnel and organization: Tenderer is required to submit, along with his tender, list of Personnel and organization available on hand (own) and proposed to be engaged for the subject work in Proforma given in Annexure-V to this chapter of this tender document. The tender without this information may be treated as if the tenderer has no personnel and organization and that no personnel and organization are proposed to be engaged for the subject work.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per clause no. 14 of GCC-2022, The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (A)HUF: A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (B)Partnership Firm: (i)A notarized copy of the Partnership Deed or a copy of the Partnership deed registered with the Registrar. (ii)A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm. (iii)An undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP in which they were / are partners/members. Any Concealment / wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the Standard General Conditions of Contract. (C)Company registered under Companies Act2013: (i)The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii)A copy of Certificate of Incorporation (iii)A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (D)LLP (Limited Liability Partnership): (i)A copy of LLP Agreement (ii)A copy of Certificate of Incorporation (iii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (E)Registered Society & Registered Trust: (i)A copy of Certificate of Registration (ii)A copy of Memorandum of Association of Society/Trust Deed (iii)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv)A copy of Rules & Regulations of the Society.
Undertaking:- An undertaking regarding not blacklisted or debarred by Railway or any other Ministry/Department of the Govt. of India from participation in tender/contracts on date of opening of bids to be submitted by all partner/member in case of partnership firm/LLP as per clause 14 of GCC 2022. Concealment/wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.
As per clause No. 15 of GCC-2022, The tenderer whether sole proprietor / a company or a partnership firm /registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required.
Special Track Maintenance of Newly handed over KUMB-BTH Section of Sagauli- Valmikinagar doubling project under ADEN/BMKI.
TC-126-2026-SPJ~ECR
TC-126-2026-SPJ
Open
Works - General
6 Months
Samastipur, Bihar
₹0
₹2.9 L
21 Aug 2026
21 Aug 2026
31 Aug 2026
74 items across 1 schedule · ₹1,42,83,419.22 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Up to 40 m long rail panel | RM | 500.00 | 8.15 | 4,075 |
| 2 | For Casual/Scattered Rail Renewal work | RM | 500.00 | 31.36 | 15,680 |
| 3 | For Casual/Scattered Rail Renewal work | RM | 500.00 | 33.22 | 16,610 |
| 4 | For location of work not involving deep screening | TRM | 2600.00 | 147.58 | 3,83,708 |
| 5 | Lubrication of Elastic Rail Clips on PSC sleepers as per procedure prescribed in latest edition of IRPWM with Railway's grease. | ERC | 100000.00 | 2.1 | 2,10,000 |
| 6 | By using Railway's Grease graphite | Each | 5002.00 | 26.73 | 1,33,703.46 |
| 7 | Rail section of 52Kg and above | Each | 300.00 | 123.11 | 36,933 |
| 8 | Sleepers up to 2.85 m length | Each | 25.00 | 541.35 | 13,533.75 |
| 9 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 50.00 | 746.26 | 37,313 |
| 10 | Sleepers of more than 4.20 m length | Each | 50.00 | 1,176.8 | 58,840 |
| 11 | 1 in 8½ Turnout | Set | 5.00 | 3,335.64 | 16,678.2 |
| 12 | 1 in 12 Turnout | Set | 15.00 | 3,658.38 | 54,875.7 |
| 13 | 1 in 8½ Switch Assembly | Set | 5.00 | 11,811.93 | 59,059.65 |
| 14 | 1 in 12 Switch Assembly | Set | 15.00 | 13,179.08 | 1,97,686.2 |
| 15 | For 1 in 12 Turnouts | Set | 15.00 | 7,393.72 | 1,10,905.8 |
| 16 | For 1 in 8.5 Turnouts | Set | 5.00 | 5,914.97 | 29,574.85 |
| 17 | Turnout sleepers of length up to 2.85 m | Each | 10.00 | 121.83 | 1,218.3 |
| 18 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 20.00 | 146.19 | 2,923.8 |
| 19 | Sleepers of length more than 4.20 m | Each | 20.00 | 158.38 | 3,167.6 |
| 20 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge. | TRM | 1000.00 | 159.09 | 1,59,090 |
| 21 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 10000.00 | 23.36 | 2,33,600 |
| 22 | Under Traffic Block Conditions: | cum | 2000.00 | 46.52 | 93,040 |
| 23 | 25mm gap 'in-situ' welding during traffic block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. | Each | 200.00 | 1,454.36 | 2,90,872 |
| 24 | For PSC Sleeper | TRM | 1000.00 | 79.61 | 79,610 |
| 25 | Without Rail tensor | TRM | 10000.00 | 49.22 | 4,92,200 |
| 26 | One Gang comprising of 20 physically fit labours plus 1 Mate.Note: In case, contractor provides less no. of Labour/Mate, payment will be deducted for each such labour @ 10% of the accepted item rate. | Gang Day | 360.00 | 13,697.07 | 49,30,945.2 |
| 27 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 118.00 | 1,576.35 | 1,86,009.3 |
| 28 | For Day shift | Each | 100.00 | 612.88 | 61,288 |
| 29 | For Night shift | Each | 100.00 | 761.09 | 76,109 |
| 30 | For 60 Kg Rails | TRM | 10000.00 | 100.43 | 10,04,300 |
| 31 | For day time block working | TRM | 20000.00 | 16.74 | 3,34,800 |
| 32 | For night time block working | TRM | 10000.00 | 18.8 | 1,88,000 |
| 33 | Removing and refixing of guard Rails over slab bridges during machine packing with all contractor's men and materials duly removing fittings, leading guard rails to bridge approaches, lifting, dragging, positioning and crossing of track etc, and as directed by Engineer In charge. | TRM | 50.00 | 92.28 | 4,614 |
| 34 | 1 in 8½ Turnouts (Under Traffic Block Conditions) | Set | 5.00 | 8,262.23 | 41,311.15 |
| 35 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 25.00 | 9,629.38 | 2,40,734.5 |
| 36 | Derailing Switch (Under Traffic Block Conditions) | Set | 3.00 | 3,009.96 | 9,029.88 |
| 37 | Carrying out ancillary works required for UTV working under line block i.e., turning of rails/ Sleepers and keeping in position for fixing of UTV clamps to rail, keeping rails/PSC Sleepers in position while loading into BFR, removal of clamps on BFR for releasing loaded rail/Sleepers, adjusting of rails/Sleepers on BFR etc. by providing minimum of three men in a shift of 8 hours, with all contractor's tools, all lead, lift, crossing of tracks etc., complete and as directed by the engineer - in - charge. Note: In case, contractor provides less no. of Labour, payment will be deducted for each such person @ 2/3 rd of the accepted item rate. | Shift | 200.00 | 2,043.37 | 4,08,674 |
| 38 | CSM / DUO / 3X with or without DGS (7.5 KVA generator and 8x500 W) | Night | 200.00 | 6,220.22 | 12,44,044 |
| 39 | 60 Kg - 110/90 UTS - Outside Track | Each | 300.00 | 311.53 | 93,459 |
| 40 | 60 Kg - 110/90 UTS - On Running Line | Each | 300.00 | 390.78 | 1,17,234 |
| 41 | Outside Track | Each | 301.00 | 52.01 | 15,655.01 |
| 42 | On Running Line | Each | 301.00 | 66.12 | 19,902.12 |
| 43 | For lead up to 500 metre. | MT | 100.00 | 340.23 | 34,023 |
| 44 | For lead beyond 500 metre and up to 1 Km. | MT | 50.00 | 439.46 | 21,973 |
| 45 | For lead up to 500m | MT | 100.00 | 385.05 | 38,505 |
| 46 | For lead beyond 500 metre and up to 1 Km | MT | 50.00 | 560.83 | 28,041.5 |
| 47 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 500.00 | 337.04 | 1,68,520 |
| 48 | All type of PSC sleepers | MT | 25.00 | 368.44 | 9,211 |
| 49 | P.Way fittings of all types and other similar loose items | MT | 100.00 | 343.98 | 34,398 |
| 50 | Opening of level crossing up to required width from centre line of track for replacement of sleepers by digging of pucca road surface up to bottom of sleeper, removing of ballast, muck etc., screening of ballast & stacking the same near level crossing and disposing of all debris, replacing the required sleeper duly packing the sleeper to make fit for normal traffic and closing of LC surface with screened ballast to original level by proper ramming and consolidation to smooth motarable surface as directed by engineer in-charge. | Sqm | 600.00 | 325.34 | 1,95,204 |
| 51 | Dismantling existing check rail of Level Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge. | RM | 300.00 | 158.68 | 47,604 |
| 52 | Drilling of parabolic shaped holes to the web of check rail as per drawings & specifications and as directed by engineer in- charge. | Each | 200.00 | 135.18 | 27,036 |
| 53 | Fixing check rails to running rails on level crossings with MS brackets, MS packing plates, bolts & nuts, spring washers etc. including lubrication as per approved drawing & specifications, as directed. Rails, MS brackets, packing plates, bolts & nuts, spring washers will be supplied by Railways. Note: One set consists two check Rails. | Set | 20.00 | 4,408.6 | 88,172 |
| 54 | Dismantling existing whistle boards along with post including demolishing base concrete and levelling of ground, stacking released materials at the level crossing concerned including clearing of debris, with contractor's labour, tools, vehicles, consumables, all lead and lift etc., complete without damage as directed by the Engineer-in-charge. | Each | 20.00 | 162.56 | 3,251.2 |
| 55 | Manufacture & supply of tested GI wire rope of 6mm dia. and 6 ply to suit lifting barrier gates at nearby P.Way Stores / Depot / Level Crossing gate, as directed. | Kg | 500.00 | 327.03 | 1,63,515 |
| 56 | Supplying and driving into ground 'C' class G.I. pipes of 20mm dia. x 150mm length for planting red flags and lamp at 5 metre on both sides from the centre of road at level crossings with all leads & lifts. Payment shall be made for complete work at one Level Crossing. Note: Two pipes make one set. | Set | 20.00 | 442.33 | 8,846.6 |
| 57 | Fabrication, supplying and fixing Stop Boards of 600mm dia. to lifting barriers as per approved drawing, made of 3mm thick plate, using MS clamps, providing 6 nos. of 50mm dia. red retro-reflector on stop board, painting iron works with two coats of synthetic enamel paint over one coat of primer of approved quality & colour and writing STOP mark over the board. | Each | 20.00 | 2,712.79 | 54,255.8 |
| 58 | Involving Rubber Pad | Each | 200.00 | 51.93 | 10,386 |
| 59 | Manufacture of flared portion of Guard Rail by cutting and bending to required shape & RDSO's approved drawings. Note: (1) Rails shall be supplied by Railways. (2) One set consists of two rails i.e. both left and right. | Set | 10.00 | 3,913.98 | 39,139.8 |
| 60 | Providing and fixing of flared portion of guard rails of any rail section over PSC sleepers including fixing of with all fittings, including leading of rails and fittings, squaring and adjusting spacing of sleepers as required, providing nose blocks duly cutting wooden blocks supplied by railways and fixing it with bolts of 16mm dia as directed complete and finished as per RDSO's approved drawing. Note: 1.One set consists of LH & RH side rails of one end. 2.Required P.Way fittings will be supplied at SSE stores depot. | Set | 10.00 | 3,221.31 | 32,213.1 |
| 61 | Drilling holes 25mm to 40mm dia. with drill twist in the foot of guard rails for fixing guard rails on bridge as directed. | Each | 205.00 | 64.89 | 13,302.45 |
| 62 | MS chequered plates 6 to 8mm thick including removal of existing chequered plates on Bridges. NOTE: Payment shall be made only as per weight of new Chequered Plate fixed. | Kg | 500.00 | 67.37 | 33,685 |
| 63 | Bilingual Whistle Boards for level crossing of size 600mm x 600mm of each board with back support frame welded to vertical post of MS T section of size 75mm x 75mm x 6mm x 3950mm | Set | 40.00 | 8,258.49 | 3,30,339.6 |
| 64 | Speed Breaker / Rumble Strips Board of size 900 mm equilateral triangular shape and 600mmx200mm boards with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm | Set | 40.00 | 7,545.37 | 3,01,814.8 |
| 65 | Manned Level Crossing Indicator Board of size 900 mm equilateral triangular shape with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm | Set | 10.00 | 6,837.31 | 68,373.1 |
| 66 | Single Strip / Double Strip Level Crossing Road Warning Board of size 900 mm equilateral triangular shape and 900x300 board with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm | Set | 10.00 | 8,113.76 | 81,137.6 |
| 67 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 20.00 | 6,797.31 | 1,35,946.2 |
| 68 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 20.00 | 5,787.12 | 1,15,742.4 |
| 69 | Stop Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 10.00 | 6,797.31 | 67,973.1 |
| 70 | Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately) | Each | 50.00 | 1,135.81 | 56,790.5 |
| 71 | Supplying and spraying in specified proportion Weedicide Chemical, capable to kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in all respect. Scientific name of the chemical is Isopropylamine Salt of Glyphosate, in which active ingredient is Glyphosate (41%), colour is light amber to brownish, very low in toxicity and has favourable environmental characteristics. It will be ensured that no weed growth occurs up to six months period, otherwise re-spraying shall be done by the contractor free of cost. | Sqm | 200000.00 | 0.6 | 1,20,000 |
| 72 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 200.00 | 868.52 | 1,73,704 |
| 73 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 50.00 | 996.76 | 49,838 |
| 74 | Tractor with Trolley for local transportation or other misc. works. | Hour | 100.00 | 194.7 | 19,470 |
| Schedule total | ₹1,42,83,419.22 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ANNEXUREItoVforIREPS_2.pdf
ATTACHMENT
JPOCircular.pdf
ATTACHMENT
Annexure-VIA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].