| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.5 Cr+₹10.0 L (7.18%)Rejected-AOC 1897 TS NO 6 5 VELLIANGKATTU RAMASAMY GOWNDER LAY OUT 60 FEET ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹1.5 Cr+₹10.0 L (7.18%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SARASWATHI & CO L1 | SENTHILKUMAR L2 |
|---|---|---|---|---|---|
| 1.001.Strengthening the road from Devarayapuram to Jallipalayam Km 0/0-4/60 (R23) | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete | 8,028 | Sqm | 5.93 ₹47,606.04 Lowest | 6.5 ₹52,182 |
| 3.00 | Picking the existing BT surface and sectioning including all labour charges etc, complete. | 5,472 | Sqm | 21.83 ₹1,19,453.76 Lowest | 23.5 ₹1,28,592 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 2,051.95 | Cum | 2,207.16 ₹45,28,981.96 Lowest | 2,362.5 ₹48,47,731.88 |
| 5.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 16,415.63 | Sqm | 82.85 ₹13,60,034.95 Lowest | 89 ₹14,60,991.07 |
| 6.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 16,415.63 | Sqm | 19.55 ₹3,20,925.57 Lowest | 21.5 ₹3,52,936.05 |
| 7.00 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 410.39 | Cum | 11,594.99 ₹47,58,467.95 Lowest | 12,410.5 ₹50,93,145.1 |
| 8.00 | Collection of Carted earth from approved quarry an average lead 1Km including cost and conveyance of all materials to site and labour charges etc., | 988.57 | Cum | 135.71 ₹1,34,158.83 Lowest | 145.5 ₹1,43,836.94 |
| 9.00 | Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete | 4 | Nos | 2,729.18 ₹10,916.72 Lowest | 2,921 ₹11,684 |
| 10.00 | Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete | 18 | Nos | 779.76 ₹14,035.68 Lowest | 835 ₹15,030 |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
19 May 2025, 3:00 pmClosed
Additional Collector (Dev)
Collectorate, Drda, Coimbatore
Strengthening the road from Devarayapuram to Jallipalayam Km 0/0-4/60 (R23) in Thondamuthur Block - Package No TN 02-27 in Thondamuthur Block of Coimbatore District under MGSMT-Phase II 2025-2026 Scheme
2025_RDTN_555535_1
DIPR/1714/Tender/2025 dated 29.04.2025
Open Tender
Civil Works - Roads
Item Rate
180 days
drda
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.5 L
drda,coimbatore
12 Aug 2025
8 May 2025
19 May 2025
8 May 2025
19 May 2025
9 May 2025
9 May 2025
Amount
1.Strengthening the road from Devarayapuram to Jallipalayam Km 0/0-4/60 (R23)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking the existing BT surface and sectioning including all labour charges etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508.
Collection of Carted earth from approved quarry an average lead 1Km including cost and conveyance of all materials to site and labour charges etc.,
Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision of 5 Nos.Rumble strips covered with premix bituminous carpet 15-20mm high at centre 250mm wide placed at 1m centre to centre at approved locations to control speed,marked with white strips of road marking paint
Sign board
Major road
Stop signal
Provision for Name board
Wearing coat for Hardbed at Km1/400
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement
Wearing coat for Hardbed at Km 3/737
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
SENTHILKUMAR (BID ID -1341269)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .