Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹41,854
Closing Date
25 Aug 2026, 3:00 pm
Superintending Engineer, North Circle, GAP Wing
Superintending Engineer, North Circle, GAP Wing, Water and Sanitation Sector, KMDA, Unnayan Bhawan, Block D
Installation of Chlorination unit in Rejuvenated STPs (22 MLD STP , WSP Type) at Kanaipur STP,Hoohgly District, West Bengal along with 05 (Five) year Operation and Maintenance Period under Namami Gange Mission -II.
2026_KMDA_1033823_1
KMDA/WS/GAP/SE(N)/NIT-02/26-27 Sl No 02
Open Tender
CIVIL AND ELECTRICAL WORKS
Turn-key
450 days
KANAIPUR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹41,854
Superintending Engineer, North Circle, GAP Wing
24 Jul 2026
24 Jul 2026
27 Aug 2026
24 Jul 2026
25 Aug 2026
24 Jul 2026
24 Jul 2026 - 31 Jul 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Disinfection Module (Part A) Installation of Chlorination unit in Rejuvenated (22 MLD STP , WSP Type) at Kanaipur STP,Hooghly District, West Bengal | |||||
| 1.01 | (1) (a) Civil Work
Construction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Labour Room, Installation of deep tube well ,Chlorination Room and all allied works related with Disinfection Modules for rejuvenation of 22.00 MLD Waste Stabilization Pond (WSP) | 1 | Job | - | - |
| 1.02 | 2) (a) Electro-mechanical Work: Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory works for Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for 22.00 MLD Waste Stabilization Pond (WSP) . | 1 | Job | - | - |
| 2Disinfection Module (Part B) Operation and Maintenance (Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both, all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment upto Threshold Flow ( For 22 MLD WSP=12.05 MLD ) at 10 MLD STP for 05 years, excluding GST. | |||||
| 2.01 | 1st year | - | Year | - | - |
| 2.02 | 2nd year | - | Year | - | - |
| 2.03 | 3rd year | - | Year | - | - |
| 2.04 | 4th year | - | Year | - | - |
| 2.05 | 5th year | - | Year | - | - |
| 3Disinfection Module (Part C ) Additional Operation and Maintenance(Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment beyond Threshold Flow ( For 22 MLD WSP=12.05 MLD ) at 22 MLD STP for 05 years, excluding GST. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.63 MB
Form1.pdf
Additional Documents • 0.25 MB
BOQ_2539095.xls
BOQ • 0.30 MB
BD.pdf
Tender Documents • 8.04 MB
scope_of_work.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].