| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 CrAccepted-Finance | ₹18.1 Cr | L1 | Accepted-Finance Among the Two bidders, the lowest rate quoted by M/s. Thirumalagiri Infra Projects Pvt Ltd. |
| 2 | L2₹19.0 CrRejected-Finance | ₹19.0 Cr | L2 | Rejected-Finance Among the Two bidders, the highest rate quoted by M/s. SAMRAT CONSTRUCTIONS |
| Sl No | Description | Qty | Unit | Thirumalagiri Infra Projects Pvt Ltd L1 | SAMRAT CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of concrete or stone masonry in Cement Mortar walls under 3 (Three) meter high etc, complete as directed by the Engineer in charge of works and as per the technical specifications - Plain Cement Concrete | 590 | Cubic meter | 520 ₹3.1 L | 546 ₹3.2 L |
| 2.00 | Dismantling RCC by manual / by using deploying machineries and etc., complete as directed by the Engineer in charge of works and as per the technical specifications - Reinforcement Cement Concrete | 40 | Cubic meter | 4,610 ₹1.8 L | 4,841 ₹1.9 L |
| 3.00 | Clearing scrub jungle etc, complete complying with standard specifications and as directed by the departmental officers | 86,400 | Square meter | 6 ₹5.2 L | 6 ₹5.2 L |
| 4.00 | Earth Work Excavation for foundation in all soils and sub soils and to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers.
(Open excavation) | 7,500 | Cubic meter | 125 ₹9.4 L | 131 ₹9.8 L |
| 5.00 | Earth Work Excavation for foundation in all soils and sub soils and to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers.
(Narrow excavation) | 400 | Cubic meter | 235 ₹94,000 | 247 ₹98,800 |
| 6.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching,formation of bunds,breaking clods and sectioning etc.,complete complying with standard specifications and as directed by the departmental officers. | 9,200 | Cubic meter | 63 ₹5.8 L | 66 ₹6.1 L |
| 7.00Providing and placing in position of plain cement concrete M10 grade using M sand graded hard blue granite broken stone jelly of 40 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers | |||||
| 7.01 | For works upto 1.50 m depth below ground level and upto 1.00 m height above ground level | 655 | Cubic meter | 6,118 ₹40.1 L | 6,424 ₹42.1 L |
| 7.02 | For works above 1.50 m to 4.50 m below ground level | 125 | Cubic meter | 6,257 ₹7.8 L | 6,570 ₹8.2 L |
| 8.00Providing and placing in position of plain cement concrete M 15 using M sand hard blue granite broken stone jelly of size 20 mm mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers | |||||
Tender Value
₹18.1 Cr
EMD Value
₹9.1 L
Closing Date
25 Feb 2026, 12:00 pmClosed
Superintending Engineer
Superintending Engineer, WRD., Vellar Basin Circle, Cuddalore 1
Rehabilitation and Flood Protection Works in Keeliruppu Check Dam at Keeliruppu Village in Panruti Taluk of Cuddalore District.
2026_WRD_661564_1
shortterm/11/VBC/13.02.2026
Open Tender
Civil Works
Keeliruppu
As per PQ documents
9 documents required · 9 mandatory
₹0
₹9.1 L
28 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of concrete or stone masonry in Cement Mortar walls under 3 (Three) meter high etc, complete as directed by the Engineer in charge of works and as per the technical specifications - Plain Cement Concrete
Dismantling RCC by manual / by using deploying machineries and etc., complete as directed by the Engineer in charge of works and as per the technical specifications - Reinforcement Cement Concrete
Clearing scrub jungle etc, complete complying with standard specifications and as directed by the departmental officers
Earth Work Excavation for foundation in all soils and sub soils and to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers. (Open excavation)
Earth Work Excavation for foundation in all soils and sub soils and to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers. (Narrow excavation)
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching,formation of bunds,breaking clods and sectioning etc.,complete complying with standard specifications and as directed by the departmental officers.
Providing and placing in position of plain cement concrete M10 grade using M sand graded hard blue granite broken stone jelly of 40 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers
For works upto 1.50 m depth below ground level and upto 1.00 m height above ground level
For works above 1.50 m to 4.50 m below ground level
Providing and placing in position of plain cement concrete M 15 using M sand hard blue granite broken stone jelly of size 20 mm mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers
For works upto 1.50 m depth below ground level and upto 1.00 m height above ground level
For works above 1.50 m to 4.50 m below ground level
Providing and placing in position of Reinforced Cement Concrete M15 using M sand hard blue granite broken stone jelly of 20 mm size mixing with mixer machine and laying in layers of not exceeding 15 cm thick excluding form works, centring, shuttering and steel fabrications including laying, compacting, consolidation by using vibrators, finishing, watering, curing, etc complete complying with standard specifications and as directed by the departmental officers
For works upto 1.50 m depth below ground level and upto 1.00 m height above ground level
For works above 1.50 m to 4.50 m below ground level
Providing and placing in position of plain cement concrete M 15 grade using M sand graded hard blue granite broken stone jelly of 60% of 40 mm size and 40% of 20 mm size mixing with mixer machine and laying in layers oincluding the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers
For works upto 1.50 m depth below ground level and upto 1.00 m height above ground level
For works above 1.50 m to 4.50 m below ground level
For works above 1.00 m to 4.50 m height above ground level
Providing and placing in position of Reinforced Cement Concrete M20 using M sand hard blue granite broken stone jelly of 20 mm size mixing with mixer machine and laying in layers of not exceeding 15 cm thick excluding form works, centring, shuttering and steel fabrications including laying, compacting, consolidation by using vibrators, finishing, watering, curing, etc complete complying with standard specifications and as directed by the departmental officers
For works upto 1.50 m depth below ground level and upto 1.00 m height above ground level
For works above 1.00 m to 4.50 m height above ground level
Supplying and laying of ready mix for M 25 grade of concrete having charaterstic strength not less than specified in the IS 456 - 2000 using Ordinary portland cement with minimum cement content of 300 Kg / cum confirming to IS 8112. Coarse aggregates having a specific gravity of 2.60 using 20 mm down graded hard blue granite broken stone jelly and fine aggregate without flyash as per IS 383 - 1970 ( 2007 ) with suitable water cement ratio not less than 0.45 and not exceeding 0.50 of water quality confirming to IS 456 - 2000 including use of plasticizer of approved make & dosage of required grade at all locations and levels with specified high workability as per IS 1199 - 1959 ( 2004 ). The initial & final setting time confirming IS 12269 - 1987 ( 2004 ) with maximum temperature of concrete at the time of placing should not exceed 32 0 C. The admixtures affecting the quality and strength of the concrete should not be used and should confirm IS 9103 - 1979 [ usual admixture - Air entraining & water reducing ]. including the cost of hire charges for pump and pumping charges to the required locations & levels as specified by the Engineer - in - charge,. laying, compacting, consolidation by using vibrators, finishing, watering, curing, testing charges as per IS 456 - 2000, 4031 - ( Part 3 & 6 ) / 1988 ( 2005 ) & ( Part 2 ) / 1999 ( 2004 ) and 516 / 1959 ( 2004 ), 4926 - 1976 ( 1990 ), mix design details to be got approved before commencement of the work adopting pour card system and other OK cards. Excluding the cost of form works, centering and shuttering placed in position etc, complete complying with standard specifications and as directed by the departmental officers. (RCC work)
Providing launching apron using new jeddy stone of size not less than 300 mm thick and weight not less than 40 Kg including the cost of new wedges for filling the gaps, finishing etc complete complying with standard specifications and as directed by the departmental officers
Supplying and laying with graded hard blue granite broken stone jelly of varying of size from 80 mm, 63 mm, 50 mm, 40 mm, 25 mm, 20 mm, 12 mm and 10 mm in equal proportions for formation of filter drains and filter bed as shown in drawing etc complete complying with standard specifications and as directed by the departmental officers.
Supplying and filling with clean river sand in layers of not more than 15 cm thick, well watered, rammed and consolidated etc., complete complying with standard specifications and as directed by the departmental officers.
Gravel packing in gaps between cement concrete blocks including cost of gravel and filling charges to full depth and stacking for premeasurements etc complete complying with standard specifications and as directed by the departmental officers
Supplying and erecting centering for vertical plain / RCC concrete walls of supply channel, retaining wall etc for following height with necessary supports, all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25 mm x 3 mm for bearing laid silver Oak / Country wood joist of size 7.50 cm x 5.0 cm spaced @ about 90 cm C / C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C / C, etc., complete complying with standard specifications and as directed by the departmental officers
Vertical centering- Upto 0.90 M Height
Upto 1.80 M Heightl
Upto 2.70/3.00 M Height
3.00 to 4.00 M Height
4.00 to 5.00 M Height
Supplying and erecting centering for sides and soffits and strutting upto 3.0 m height for plane surfaces such as RCC works etc, with all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25 mm x 3 mm for bearing laid silver Oak / Country wood joist of size 10 cm x 6.5 cm spaced @ about 90 cm C / C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C / C, and removing the same without any damages etc., complete complying with standard specifications and as directed by the departmental officers - Horizontal Centering
Supplying, fabricating and placing in position of Mild Steel or Ribbed Tor Steel for all RCC works as per design & drawing given including cost of steel, binding wire and labour charges for cutting, bending, laying in position and tying with binding wire, etc. complete complying with standard specifications and as directed by the departmental officers
Supplying and placing position of Plain Cement Concrete block of size 1.50 m X 1.50 m X 0.90 m of M15 grade concrete using M sand and hard blue granite broken stone jelly of size 20mm mixing with mixer machine and laying in rows, wherever necessary compacting , consolidation by using vibrators, finishing, watering, curing including the cost of erecting and centering including necessary for plain surfaces for concrete block of size 1.50 m X 1.50 m X 0.90 m MS sheets of size 1.50 m X 0.90 m of 10 gauge stiffened with MS angle of size ISS 25 mm X 25 mm X 3 mm supported by MS flats of size 25 mm X 3 mm etc complete and complying with standard specification as directed by the departmental officers
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete
Supplying and fixing PVC water stopper heavy duty of 300 mm width as per IS 15058 / 2001, including cost of all materials, labour charges, etc complete complying with standard specifications and as directed by the departmental officers
Dewatering using 7.50 HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
Supplying and fixing of PVC pipe 110 mm dia (4Kg/cm2) for weep holes provide in the wing walls of either side etc.,complete as directed by the departmental officer.
Regrading the river bed including jungle clearance deploying the heavy machinery on hour basis including cost of hire charges, fuel, labour etc complete compyling with standard specifications and as directed by epartmental officers - for regrading 150 m3 using dozer D-80-A12
Fabricating, Supplying and erection of Screw gearing steel shutters of size above width of 2.15 m x 1.35 m height consist of skin plate made out of 12mm thick mild steel plate and horizontally stiffened with 150x75mm ISMB 150 at an interval not more than 0.50m and vertical stiffeners made out of 100x50mm mild steel channel at an interval not more than 0.60m and end vertical made up of 100x50mm mild steel channel 2 Nos on both sides, provided with 100mm dia steel Rollers 2 Nos on both sides with 100mm dia MS Rollers 2 Nos on both sides with 2" dia Gun metal bushes and 1" dia roller pin for smooth operation. The shutter lifted with 12mm thick mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Providing leakage arrest pipe arrangements made with 75mm dia B-Class G.I Pipe at both ends for required height hanged in chain from the top of the shutter. The bottom seal made up of 75x10mm rubber seal covered with 65x8mm steel flats fastened with required with rust free bolts and Nuts. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipments. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipments. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipments required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc., complete.
Fabricating,supplying and fixing of top beam made out of 200 x 100 mm(ISMB 150) duly drilled to suit the Head Set Assembly with required bed bolt made out of 25 mm Mild Steel Round Rod duly threaded with suitable anchorage arrangements to a height of 0.6 m with necessary fish plate made out of 12 mm mild steel plate of size 0.30 x0.15 m, 2 Nos of to place the beam in position.Conveying and leading the top beam arrangements to the work site.Fixing the top beam arrangements at the top of the vent to the corret position including dismantling the existing eroded top beam,conveying and stacking at the section store.The to beam should be painted with two coat of anti corrosive black paint with one coat of red oxide primer etc.,The rate including the cost of materials,labours,charges for all fabricating and hoisting equipments,cost of petty civil works,charges for labours and materials including all other taxes etc., warranty for 5 years etc., complete..
Fabricating,Suppling and fixing of Screw Rod 63mm dia Mild Steel Round Rod duly machined and fully threaded to suit the head assembly with required bolt and nuts.Conveying and leading the screw rods to the work site.Fixing the screw rod to the shutter gusset plate with required bolts and nuts in proper alignment to the head set including dismantling the existing damaged screw rod,conveying and stacking at the section store.The screw rod should be painted with two coats of AC black paint over one coat of red oxide primer.The rate including the cost of materials,labours,charges for all fabricating and hoisting equipments,cost of petty civil works,charges for labours and materials including all other taxes etc., complete.
Fabricating and Suppling and fixing of Shutter Groove Angle ,made out of 100x100x10 mm Mild steel angle with required height including welding of hold fast of size 40x40x6 mm Mild Steel Angle 3 Nos on each sides and conveying and leading the groove angle to the vent etc.,Fixing the angle to the grooves with proper alignment including dismantling the existing damaged groove angles,conveying and stacking at section store.The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer.The rate including the cost of materilals,consumables,labours,charges for all fabricating and hoisting equipments and conveyance petty civil works and all other taxes., warranty for 5 years etc., complete.
Fabricating,Supplying and fixing of Headset assembly medium duty with hexagonal nut (approximate 70 Kg) made up of cast iron including moulding machining and the hexagonal nut threaded to suit the screw rod provided with thrust bearings for smooth operation.conveying and leading the headset assembly to the work site.fixing the headset assembly to the top beam by using required rust free bolts and nuts in propoer alignment including dismantling the existing damaged headset assembly ,conveying and stacking at section store.the headset assembly supplied with opening key and the both should be painted with two coats of anticorrosive black paint over one coat of red oxide primer.The rate including cost of materials,labours,charges ofr wooden pattern,mouldings and charges for all machining equipements ,conveyance charges for labours and materials and warranty for 5 years etc. warranty for 5 years etc., complete.
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead 8 Km by deploying earth moving machineries and tippers including benching formation of bunds, breaking clods, ramming, sectioning with extra watering and consolidation by power roller and including hire charges etc. complete complying with standard specifications and as directed by the departmental officers
Supply and laying porus concrete pluse of 1:4 mix (one cement and Four jelly) using hard blue granite broken stone jelly of size 20mm for 10cm dia, 30cm long including mixing ,laying finishing, curing etc., complete complying with standard specifications and as directed by the departmental officers
GST 18 % in Figures
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_794101.xls
BOQ • 0.27 MB
KeeliruppuPq.pdf
Tender Documents • 0.45 MB
PTKeeliruppu.pdf
Tender Documents • 1.43 MB
Download all tender documents and submit your bid