Unit 325, 3rd Floor, D21 Corporate Park, Sector 21, Dwarka, Dhulsiras, New Delhi-110077
Request for Proposal (“RFP”) issued by NHIT Eastern Projects Private Limited (NEPPL) for Engagement of Agency/Firm for Drain Civil works for controlling the Waterlogging conditions developing near RUB on Four-lane of Chichra-Kharagpur Road Section of NH-49 with project length of 56.120 kms in the state of West Bengal.
NSPPL/FY26-27/RFP/MHRP/Stone Pitching Works
NSPPL/FY26-27/RFP/MHRP/Stone Pitching Works
RFP
West Bengal
22 Apr 2026
22 Apr 2026
4 May 2026
Dry Stone Pitching Providing and laying dry stone Pitching of 300mm on slopes laid over prepared filter media. The stones for pitching shall be obtained from quarries and shall be sound, hard, durable and fairly regular in shape. Round boulders shall not be allowed. The size and weight of stone shall conform to Clause 5.3.5.1 of IRC: 89. No stone shall weight less than 40Kg. The size of spalls shall be a minimum of 25mm and shall be suitable to fill the voids in the pitching. The quoted rate shall include all costs necessary to complete the work, but not limited to the cost of dry stone, transportation of dry stone, disposal of excess material and laying of dry stone as per approved construction methodlogy. Ensure proper side slope for drainage and maintain safety measures including barricading and signage during the execution are essential and must be included.
Filter Media beneath Dry Stone Pitching Providing and laying filter media of 150mm thickness over the embankment slope. Before laying the pitching, the side of banks shall be trimmed to the required slope and profiles by means of lines and pegs at interval of 3m. Depressions shall be filled and thoroughly compacted. The choice of material for the filter shall be as per the technical specification or Engineer's recommendation. One or more layers of graded materials to act as a filter medium shall be provided underneath the pitching, to prevent loss of the embankment material and build up of uplift head on the pitching. The quoted rate shall include all costs necessary to complete the work, but not limited to the cost of approved filter material, transportation of filter material, disposal of excess material and laying of filter layer as per approved construction methodlogy. The rate also covers the use of necessary equipment such as compactors, rollers, excavators etc. Ensure proper side slope for drainage and maintain safety measures including barricading and signage during the execution are essential and must be included.
Plain cement concrete M-20 Providing and laying Plain Cement Concrete of M20 grade including preparation, formwork where necessary, placement of concrete as per mix design, proper compaction, finishing, and curing as per specifications. The work shall include supplying all materials, labour, tools, equipment, mixing, placing, compacting, curing, and all incidental works required for proper completion, including compliance with all safety measures .
Plain cement concrete M-15 Providing and laying Plain Cement Concrete of M15 grade including preparation, formwork where necessary, placement of concrete as per mix design, proper compaction, finishing, and curing as per specifications. The work shall include supplying all materials, labour, tools, equipment, mixing, placing, compacting, curing, and all incidental works required for proper completion, including compliance with all safety measures .
Excavation in Soil using Hydraulic Excavator and Tippers with disposal. (Excavation for Median Chute Drain including cutting and loading in tippers, trimming in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead)
Dismantling of existing cement concrete by mechanical or manual means, including breaking, removal, and disposal of the dismantled material, complete in all respects as directed by the Engineer-in-Charge.
Total Amount
Total Amount
Details of Earthen Shoulder
Total Qty
Details of Median Longitudnal Drain
Total Lenght
1. Pipe Culvert
Pipe Culvert
1 X 1 X 0.750 Mtr Chamber with Ms Weld Mesh Jali
Median Longitudinal Drain
Median Chute Drain
1. Box/Slab Culvert
Box Culvert
1 X 4 X 0.750 Mtr Chamber with Ms Weld Mesh Jali
Median Longitudinal Drain
Median Chute Drain
1. Minor Bridge
Minor Bridge
Median Longitudinal Drain
Median Chute Drain
Damaged Stone pitching details
Total Qty
Volume For Stone Pitching
Damaged Chute Drain Details
Total
Total
Rate Analysis of Chute Drain
Total Amount==>>
Chute Drain Elevation
Chute Drain Dimension
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
metadata.json
RAW_JSON
RFP-Stone-Pitching-MHRP-NSPPL-22.04.2026.pdf
TENDER_DOCUMENT • 6.53 MB
Annexure C3 A Stone Pitching works MHRP NSPPL.xlsx
BOQ_DOCUMENT • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .