Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹68.5 L
EMD Value
₹6.9 L
Closing Date
16 Jan 2020, 5:00 pmClosed
EE MI MAHOBA
EE MI MAHOBA
Construction of Checkdam Imliya Block Kabrai Lot No. 25
2019_UPMID_418277_25
566/MI/Lekha/Tender/19-20 Dt 08-01-2020
Open Tender
Civil Works
Item Rate
120 days
MAHOBA
Construction of Checkdam Imliya Block Kabrai Lot No. 25
2 documents required · 2 mandatory
₹854
EE MI MAHOBA
₹6.9 L
Yes
25 Jan 2020
9 Jan 2020
17 Jan 2020
9 Jan 2020
16 Jan 2020
9 Jan 2020
Amount
Earth work in excavation in Mar, kabar, Rankar, and kankar Mixed hard soil including lead 30.0 mt and lift 1.5 mt. (a) Earth work in excavation in Mar, kabar, Rankar, and kankar Mixed hard soil including lead 30.0 mt and lift 0.0-1.5 mt.
(B) Earth work in excavation in Mar, kabar, Rankar, and kankar Mixed hard soil including lead 30.0 mt and lift 1.5m - to 3.00mtr.
(C) Earth work in excavation in Mar, kabar, Rankar, and kankar Mixed hard soil including lead 30.0 mt and lift 3.00 mtr. - upto bed level
(a) Removal of Slush in nala bed before excavation of saturated soil
Earth work in excavation in markabar & kanker mixed saturated soil with 10 Lift.
C. C. with 1:3:6 Cement, Sand and Stone gritt of 20 to 40 mm including the cost of materials and labour etc. required for proper completion of work.
R.C.R. stone masonry work in 1:4 cement sand mortar including the cost of materials labours etc. required for proper completion of work
R..R. stone masonry work in 1:4 cement sand mortar including the cost of materials labours etc. required for proper completion of work
C.C. with 1:2:4 Cement, sand and Stone Grit of 10 to 20 mm including the cost of materials & labour etc. required for proper completion of work
Raised struck pointing in 1:2 Cement, sand mortor including the cost of material labour etc. required for completion of work
1:2 Cement Sand mortor Plaster on stone masonary including the cost of material labour etc. required for completion of work
Dry stone boulder filling/ pitching after D/S floor.
Dewatering during construction of ckeck dam by 5 HP diesel pump set
Removal of Coffer Dam
Development of Nala for incresing resorvoir on both bank/ U/S 200.00 Mtr.
MS SATYENDRA SINGH CONTRACTOR
Shri kamlesh Singh
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .