| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.2 CrAdmitted-Finance | -15.25% | ₹20.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹20.9 Cr+₹70.4 L (3.48%)Admitted-Finance VILLAGE DHAURAPALI P O P S KISHORENAGAR DIST ANGUL PIN 759122 | ANGUL | ANGUL | ODISHA | 759122 | -12.30% | ₹20.9 Cr+₹70.4 L (3.48%) | L2 | Admitted-Finance |
| 3 | L3₹22.4 Cr+₹2.2 Cr (10.7%)Admitted-Finance 3RD FLOOR ROOM NO 3004 A LAXMIPRIYA 752101 KHORDHA ODISHA INDIA | KHORDHA | ODISHA | 752101 | -6.15% | ₹22.4 Cr+₹2.2 Cr (10.7%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Finance PLOT NO GA 62 GAYATRI VIHAR PATIA BHUBANESWAR ODISHA PIN 751024 | KHORDHA | ODISHA | 751024 | - | - | - | Not Admitted-Finance Others-Non Responsive |
Tender Value
₹23.9 Cr
EMD Value
₹23.9 L
Closing Date
6 Apr 2026, 5:00 pmClosed
CE AND BM MB BURLA
Office of the Chief Engineer and Basin Manager Mahanadi Basin Burla At Po Burla Dist Sambalpur Pin 768017
Renovation of Canal System of Hirakud Dam Project of Sason Canal Section Sambalpur Irrigation Division Sambalpur
2026_CEBBU_127283_1
CE AND BM MB 46-2025-2026(Online)
Open Tender
Civil Works - Canal
Percentage
730 days
At Sason Block Dhankauda Rengali Dist Sambalpur
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹23.9 L
4 Aug 2026
16 Mar 2026
7 Apr 2026
16 Mar 2026
6 Apr 2026
16 Mar 2026
16 Mar 2026 - 6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing land in canal slope work including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick. complete as directed by the Engineer-in-charge. | - | Sqm | 2.8 | - |
| 2 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50 m lead and T&P required for the work etc. complete as directed by the Engineer-in-charge. | - | Cum | 858.6 | - |
| 3 | Earthwork in excavation of foundation in all kinds of soil including hard moorum,stoney earth mixed with boulder (except sheet rock and boulder required blasting)with all lead ,lifts and delifts including dressing and levelling the bed & slope & depositing the excavated materials at places away from the work site with all leads,lifts and delifts including cost of all labour & dewatering if required and T&P required for the work etc.Complete as directed by the Engineer-in-charge. | - | Cum | 276.9 | - |
| 4 | Filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty etc. complete as per direction of the Engineer-in-Charge. | - | Cum | 1,097.7 | - |
| 5 | Rigid & smooth centering and shuttering for PCC/RCC work including false work and dismantling them after casting including all cost of material and labour in plinth and foundation and T&P etc.complete as directed by the Engineer-in-charge. | - | Sqm | 249.3 | - |
| 6 | Supplying and fixing of 150 mm dia NP3 Hume Pipe inlcuding all cost of carriage,labour with B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | - | RM | 739.1 | - |
| 7 | Supplying and fixing of 100 mm dia NP3 Hume Pipe inlcuding all cost of carriage,labour with B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | - | RM | 614.9 | - |
| 8 | Plain Cement concrete M-15 grade with C.B.H.G coarse aggregate 40 mm down graded metal of approved quality mixing by concrete mixture and placing manually compacting with vibrator including cost of all materials, labour charges with all leads by mechanical means and placement within initial lead of 50 m and initial lift of 1.50 m for mixing concrete including conveyance,royalty and taxes etc. of all materials T &P,watering and curing, B & OC workers welfare cess etc. complete as per the direction of the Engineer in charge | - | Cum | - | - |
| 9 | Providing formwork for Concrete with F1 finish for upstream faces of dam,spillway ,glacis of barrages,unexposed surfaces of foundation block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materials and T & P etc.Complete as directed by the Engineer-in-charge. | - | Sqm | 762.8 | - |
| 10 | Supplying, fitting and placing uncoated M.S. Bar reinforcement complete as per drawing and technical specification etc. complete as per direction of Engineer-in-charge. | - | Qntl | 8,331.5 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BOQ_585202.xls
BOQ • 0.32 MB
DTCNSason.pdf
Tender Documents • 7.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .