Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 28 7 CHITABARANATHAPURAM 1ST STREET DEVAKOTTAI SIVAGANGAI DISTT | DEVAKOTTAI | SIVAGANGAI | TAMIL NADU | Admitted-Finance |
| 2 | Admitted-Finance RAMANATHAPURAM | RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector(Dev),DRDA,Ramanathapuram
District Rural Development Agency,Ramanathapuram
Improvements to the Samathuva burial ground in Package No.RSM-3/AGAMT 2021-22 of Rsmangalam Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242190_1
R7/5593/2021/dated 05.07.2022 RSM-3
Open Tender
Civil Works
Item Rate
180 days
District Rural Development Agency
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹36,000
District Rural Development Agency,Ramanathapuram
9 Sept 2022
19 Jul 2022
8 Aug 2022
19 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
90 days
Amount
Part I: construction of waitting shed And compound wall at samathuva buriyal Ground at Pakkathangudi village in Rathanur panchayat
Earth work excavation in hard soil with initial lead and lift etc. complete as per SS20B for foundation.
Filling with river sand as per standard specification including cost and conveyance of all materials to site etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site etc. complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site etc. complete.
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
RCC 1: 1.5 : 3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete.
Plastering with CM 1:3 mix to 10mm thick including cost and conveyance of all materials to site etc. complete.
Finishing the floor with granalothic flooring including cost and conveyance of all materials to site etc. complete.
Plastic Emulsion painting including cost and conveyance of all materials to site and all labour charges etc. complete.
Weathering course concrete using 20mm broken brick jelly in pure slacked lime
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.B145 (orenamental tiles)
COMPOUND WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply & fabrication of steel including its cost and labour charge etc complete
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part II: Construction of compound wall at Samathuva burial ground at Melasengudi village in Sengudi panchayat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply & fabrication of steel including its cost and labour charge etc complete
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part III:Construction of Samathuva burial ground Cremation Shed and Compoundwall, providing Borewell at kalakudi in Kothidal kalakudi panchayat
Earth work excavation in hard soil with initial lead and lift etc. complete as per SS20B for foundation.
Filling with river sand as per standard specification including cost and conveyance of all materials to site etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site etc. complete.
RCC 1: 1.5 : 3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site etc. complete.
Refilling Excavated Earth including cost and conveyance of all labour charges
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site etc. complete.
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Plastering with CM 1:3 mix to 10mm thick including cost and conveyance of all materials to site etc. complete.
Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete.
Plastic Emulsion painting including cost and conveyance of all materials to site and all labour charges etc. complete.
COMPOUND WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply & fabrication of steel including its cost and labour charge etc complete
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
CC ROAD
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site etc. complete.
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Hand Pump
Drilling of borewell 150mm dia anywhere in Tamilnadu including transportation from one place to another within the Ramanathapuram District jurisdiction in alluvial soil (or) Sedimentary strata by direct (or) reverse rotary mud circulation method using c
Reaming from 140mm/150mm dia pilot bore to 300mm dia bore as directed (sor page 247)
Labour charges for inserting casing pipes assembly (with or without slot) in the drilled hole including welding the joints for MS casing pipes and PVC coupler joint for PVC casing pipes et complete and supplying and packing the annular space with pebbles
Charges for developing the borewell with air compressor of required capacity (minimum 8 hours) including transportion, labour and fuel charges etc complete
supply of 125mm dia PVC Plain pipe
supply of 125mm dia PVC Slotted pipe
supply of 125mm dia End cap
Supply of INDIAN MARK II Hand pumpset
Supply and Delivery of the following GI, PVC pipes and Special
Supply of 32mm G.I.Pipe with coupling of (10x3m) mts with ISI
Transporting of the India Mark II hand pump and of pipes with tha all its accessories including all labour charges
Construction of hand pump platform with plain cement concrete as per TWAD TYPE DESIGN
Labour charges for errection of INDIAN MARK II Hand pumpset
Part IV:Construction of Samathuva burial ground Waiting Shed and compound wall at Karuppankudumbanpacheri village in Thumbadaikakottai Panchayat
Earth work excavation in hard soil with initial lead and lift etc. complete as per SS20B for foundation.
Filling with river sand as per standard specification including cost and conveyance of all materials to site etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site etc. complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site etc. complete.
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
RCC 1: 1.5 : 3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete.
Plastering with CM 1:3 mix to 10mm thick including cost and conveyance of all materials to site etc. complete.
Finishing the floor with granalothic flooring including cost and conveyance of all materials to site etc. complete.
Plastic Emulsion painting including cost and conveyance of all materials to site and all labour charges etc. complete.
Weathering course concrete using 20mm broken brick jelly in pure slacked lime
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.B145 (orenamental tiles)
COMPOUND WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply & fabrication of steel including its cost and labour charge etc complete
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part V:Construction of Samathuva burial ground Waiting Shed and compound wall at Silugavayal village in Pullamadai Panchayat
Earth work excavation in hard soil with initial lead and lift etc. complete as per SS20B for foundation.
Filling with river sand as per standard specification including cost and conveyance of all materials to site etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site etc. complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site etc. complete.
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
RCC 1: 1.5 : 3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete.
Plastering with CM 1:3 mix to 10mm thick including cost and conveyance of all materials to site etc. complete.
Finishing the floor with granalothic flooring including cost and conveyance of all materials to site etc. complete.
Plastic Emulsion painting including cost and conveyance of all materials to site and all labour charges etc. complete.
Weathering course concrete using 20mm broken brick jelly in pure slacked lime
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.B145 (orenamental tiles)
COMPOUND WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply & fabrication of steel including its cost and labour charge etc complete
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part VI:Construction of Samathuva burial ground Cremation Shed and Compoundwall, at Alagapuri village in Thiruthervalai panchayat
Earth work excavation in hard soil with initial lead and lift etc. complete as per SS20B for foundation.
Filling with river sand as per standard specification including cost and conveyance of all materials to site etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site etc. complete.
RCC 1: 1.5 : 3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site etc. complete.
Refilling Excavated Earth including cost and conveyance of all labour charges
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site etc. complete.
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Plastering with CM 1:3 mix to 10mm thick including cost and conveyance of all materials to site etc. complete.
Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete.
Plastic Emulsion painting including cost and conveyance of all materials to site and all labour charges etc. complete.
COMPOUND WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Supply & fabrication of steel including its cost and labour charge etc complete
Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Part VII:Construction of Samathuva burial ground Waiting Shed and Providing Hand pump at Suthamalli village in Ayingudi panchayat
Earth work excavation in hard soil with initial lead and lift etc. complete as per SS20B for foundation.
Filling with river sand as per standard specification including cost and conveyance of all materials to site etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site etc. complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyance of all materials to site etc. complete.
Steel centering, shuttering for soffits including cost and conveyance of all materials to site and all labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
RCC 1: 1.5 : 3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with CM 1:5 mix to 12mm thick including cost and conveyance of all materials to site etc. complete.
Plastering with CM 1:3 mix to 10mm thick including cost and conveyance of all materials to site etc. complete.
Finishing the floor with granalothic flooring including cost and conveyance of all materials to site etc. complete.
Plastic Emulsion painting including cost and conveyance of all materials to site and all labour charges etc. complete.
Weathering course concrete using 20mm broken brick jelly in pure slacked lime
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.B145 (orenamental tiles)
Hand Pump
Drilling of borewell 150mm dia anywhere in Tamilnadu including transportation from one place to another within the Ramanathapuram District jurisdiction in alluvial soil (or) Sedimentary strata by direct (or) reverse rotary mud circulation method using c
Reaming from 140mm/150mm dia pilot bore to 300mm dia bore as directed (sor page 247)
Labour charges for inserting casing pipes assembly (with or without slot) in the drilled hole including welding the joints for MS casing pipes and PVC coupler joint for PVC casing pipes et complete and supplying and packing the annular space with pebbles
Charges for developing the borewell with air compressor of required capacity (minimum 8 hours) including transportion, labour and fuel charges etc complete
supply of 125mm dia PVC Plain pipe
supply of 125mm dia PVC Slotted pipe
supply of 125mm dia End cap
Supply of INDIAN MARK II Hand pumpset
Supply and Delivery of the following GI, PVC pipes and Special
Supply of 32mm G.I.Pipe with coupling of (10x3m) mts with ISI
Transporting of the India Mark II hand pump and of pipes with tha all its accessories including all labour charges
Construction of hand pump platform with plain cement concrete as per TWAD TYPE DESIGN
Labour charges for errection of INDIAN MARK II Hand pumpset
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KOP & CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .