| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAdmitted-Finance | ₹45.9 L | L1 | Admitted-Finance |
| 2 | L2₹49.2 LAdmitted-Finance | ₹49.2 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Perfect Power Transformer Associates L2 | Meena Elect & Engg. Works L1 |
|---|---|---|---|---|---|
| 1.00Carriage of 315 MVA, 400/220 kV Power Transformer(BHEL make) from 400 KV sub-station Bareilly to 400 KV Sub-Station-II Muradnagar Ghaziabad | |||||
| 1.01 | Draining out of complete Transformer oil in empty oil drum from 315MVA Transformer Main Tank at 400 KV Sub-Station Bareilly . | 1 | Job | 48,990 ₹48,990 Lowest | 49,450 ₹49,450 |
| 1.02 | Create the Vacuum and filling of Nitrogen in empty tank of transformer with -50°C due point Nitrogen at 400 KV S/S Bareilly and maintained the Nitrogen pressure .25Kg/cm2 pressure upto 400 KV S/S-II Muradnagar. | 1 | Job | 84,000 ₹84,000 Lowest | 84,500 ₹84,500 |
| 1.03 | Providing of Impact Recorder before Start of Shifting of Main Tank of 315MVA T/F at 400KV Sub Station Bareilly to 400KV Sub Station Muradnagar for checking of any Impact on Core & Winding inside the Transformer Main Tank after complete of journey. Report of Impact Recorder has to submit to Supervising Engineer within 10 Days by the Contractor. | 1 | Job | 74,500 ₹74,500 | 64,500 ₹64,500 Lowest |
| 1.04 | Shifting of main tank of 315 MVA Transformer from plinth to loading place Upto 20 Mtrs distance | 1 | Job | 1,35,000 ₹1,35,000 | 1,24,950 ₹1,24,950 Lowest |
| 1.05 | Additional shifting of @ 5 Mtrs./ Per Job | 4 | Job | 24,450 ₹97,800 Lowest | 24,500 ₹98,000 |
| 1.06 | Loading of 315 MVA T/F main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle at 400KV S/S Bareilly . | 1 | Job | 1,98,000 ₹1,98,000 | 1,84,450 ₹1,84,450 Lowest |
| 1.07 | Safe Carriage of Main Tank of the 315MVA Transformer & its all accessories by Private HYDRAULIC Trailer to be Arranged by the Contractor from 400KV Sub Station Bareilly to 400KV Sub Station -II Muradnagar (Distance approx. 300 Km) Excluding the Cost of Transit Insurance. | 1 | Job | 39,80,000 ₹39,80,000 | 37,50,000 ₹37,50,000 Lowest |
| 1.08 | Opening of lashing of main tank of 315 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 315 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Truck/ Trailer at site at 400 KV S/S-II Muradnagar. | 1 | Job | 1,98,000 ₹1,98,000 | 1,68,950 ₹1,68,950 Lowest |
| 1.09 | Transit insurance for carriage of main tank and acessories of 315 MVA 400/220Kv from 400Kv Bareilly to 400KV SS II Muradnagar Ghaziabad ( Rembursement as per actual expenditure) | 1 | Job | 1,00,000 ₹1,00,000 | 69,500 ₹69,500 Lowest |
Tender Value
₹54.3 L
EMD Value
₹55,000
Closing Date
12 Jun 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
132 KV S/S LALKUANC CAMPUS , GHAZIABAD
Carriage of 315 MVA T/f
2026_UPTCL_1124355_1
T-02/ETC/GZB/2026
Open Tender
Electrical Works
Fixed-rate
15 days
Bareilly to Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
AS PER NIT
₹55,000
Ghaziabad
22 Jun 2026
12 Mar 2026
12 Jun 2026
12 Mar 2026
12 Jun 2026
12 Mar 2026
4 Apr 2026
Carriage of 315 MVA, 400/220 kV Power Transformer(BHEL make) from 400 KV sub-station Bareilly to 400 KV Sub-Station-II Muradnagar Ghaziabad
Draining out of complete Transformer oil in empty oil drum from 315MVA Transformer Main Tank at 400 KV Sub-Station Bareilly .
Create the Vacuum and filling of Nitrogen in empty tank of transformer with -50°C due point Nitrogen at 400 KV S/S Bareilly and maintained the Nitrogen pressure .25Kg/cm2 pressure upto 400 KV S/S-II Muradnagar.
Providing of Impact Recorder before Start of Shifting of Main Tank of 315MVA T/F at 400KV Sub Station Bareilly to 400KV Sub Station Muradnagar for checking of any Impact on Core & Winding inside the Transformer Main Tank after complete of journey. Report of Impact Recorder has to submit to Supervising Engineer within 10 Days by the Contractor.
Shifting of main tank of 315 MVA Transformer from plinth to loading place Upto 20 Mtrs distance
Additional shifting of @ 5 Mtrs./ Per Job
Loading of 315 MVA T/F main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle at 400KV S/S Bareilly .
Safe Carriage of Main Tank of the 315MVA Transformer & its all accessories by Private HYDRAULIC Trailer to be Arranged by the Contractor from 400KV Sub Station Bareilly to 400KV Sub Station -II Muradnagar (Distance approx. 300 Km) Excluding the Cost of Transit Insurance.
Opening of lashing of main tank of 315 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 315 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Truck/ Trailer at site at 400 KV S/S-II Muradnagar.
Transit insurance for carriage of main tank and acessories of 315 MVA 400/220Kv from 400Kv Bareilly to 400KV SS II Muradnagar Ghaziabad ( Rembursement as per actual expenditure)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
td_02.pdf
Tender Documents • 1.00 MB
BOQ_2095244.xls
BOQ • 0.33 MB
174.pdf
PDF • 0.08 MB
172.pdf
PDF • 0.07 MB
159.pdf
PDF • 0.08 MB
t02.pdf
PDF • 0.25 MB
dateexe_2.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].