Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹12.6 L+₹47,849.76 (3.93%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹12.8 L+₹63,853.03 (5.25%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹14.9 L+₹2.8 L (22.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16 L
EMD Value
₹48,000
Closing Date
23 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF COMPOUND WALLING ALONG WITH GATE AT PHC VERINAG BLOCK VERINAG
2026_RDPR_325101_45
ENIT109of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Office of the Executive Engineer REW Anantnag
₹48,000
28 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
23 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clearence by Way of engagement of labs | 5 | nos | 578 | ₹2,890 |
| 2 | Demolishing C Concrete/Stone Work/Brick Work manually /Mechanically means incld disposal of material with 50 mtrs lead as aper directions of engineer incharge | 30.42 | Cum | 1,725 | ₹52,474.5 |
| 3 | Earthwork in excavation by mechanical means in foundation trenches incld disposal lead & Lift in all kinds of soil | 1.81 | Cum | 256.85 | ₹464.9 |
| 4 | Providing and laying of stone soling including ramming with all carriages upto worksite complete job.(Plums) | 1.31 | Cum | 1,000 | ₹1,310 |
| 5 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.39 | Cum | 5,202 | ₹7,230.78 |
| 6 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 25.48 | Cum | 5,733.6 | ₹1,46,092.13 |
| 7 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.83 | Cum | 7,788.4 | ₹45,406.37 |
| 8 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.24 | Cum | 6,591.25 | ₹87,268.15 |
| 9 | BRICK WORK WITH COMMON BURNT CLAY BRICKS FPS OF CLASS DESIGNATION 75 IN FOUNDATION & plinth in cement mortor 1: 4 mix | 41.8 | Cum | 7,571.55 | ₹3,16,490.79 |
| 10 | Extra for Brick work with common burnt clay bricks in Superstucture above plinth level | 41.8 | Cum | 1,455.65 | ₹60,846.17 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1097581.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .