| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC | L1 | Accepted-AOC Being overall rate reasonable | |
| 2 | L2₹33.5 L+₹65,300 (1.99%)Rejected-Finance | L2 | Rejected-Finance Not lowest bidder | |
| 3 | L3₹34.8 L+₹1.9 L (5.91%)Rejected-Finance | L3 | Rejected-Finance Not lowest bidder | |
| 4 | L4₹36.1 L+₹3.3 L (9.95%)Rejected-Finance SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L4 | Rejected-Finance Not lowest bidder | |
| 5 | L5₹37.4 L+₹4.6 L (14.0%)Rejected-Finance | L5 | Rejected-Finance Not lowest bidder |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
1 Feb 2023, 6:00 pmClosed
GE CENTRAL KIRKEE
GE CENTRAL KIRKEE RANGE HILLS ROAD KIRKEE PUNE-411003
SMART PERIODICAL SERVICES ALONG WITH CONNECTED CIVIL WORKS IN OTM/MD ACCN AND OFFICER MD ACCN OF ZONE A UNDER GE(CENTRAL) KIRKEE.
2023_MES_573198_1
8741/E8 OF 2022-2023
Open Tender
Civil Works
Item Rate
150 days
ZONE A area
Class D Category a(i)
7 documents required · 7 mandatory
₹500
GE CENTRAL KIRKEE
₹99,000
Yes
14 Feb 2023
5 Jan 2023
3 Feb 2023
5 Jan 2023
1 Feb 2023
20 Jan 2023
5 Jan 2023 - 19 Jan 2023
Amount
NOTE FOR ALL PAINITNG AND WATER PROOFING ITEMS :- The following precautionary measures shall be ensured by the contractor before and during execution of the work :- (i) All the painting works and water proofing works shall be got executed through original material manufacturing company or their authorised applicators as approved by GE and contractor should submit MOU with the manufacturing company or their authorised applicator before execution of work and entire work shall be executed with the approved firm. (ii) Contractor shall deposit entire quantity of materials (proprietory materials) in sealed containers required for painting works covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (iii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (iv) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses and joinery.
Material and labour for preparation of old/new plastered surfaces of wall / ceiling / chajja by scrapping with trucare wall sander : L-01/H-01 (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. or equivalent makes viz Xpress sanding machine having suction vaccum bag or by manual scrapping tools where mechanical removal is not possible and filling cracks, holes etc complete and applying two coats of cement based paint including priming with alkali resistant primer complete all as specified and as directed. NOTE :- (i) Proper curing with water to be done before and after application of first coat and second coat. (ii) Rate quoted shall be deemed to be included for scaffolding up to 15 mtr height building.
Material and labour for preparation of old plastered or unplastered surfaces of wall / ceiling and applying one coat of oil bound emulsion distemper of approved tint complete all as specified and as directed.
Material and labour for preparation of new plastered or unplastered surfaces of walls and applying two coats of oil bound emulsion distemper of approved tint, including priming plastered and other surfaces with alkali resistant primer complete all as specified and as directed.
Material and labour for complete removal of existing treatment and apply walll care putty of 3 mm thick as in interior / exterior wall / ceiling surfaces of any description finished smooth and even surfces complete all as specified and as directed.
Material and labour for preparation of old plastered or unplastered surfaces of wall and applying one coat of cement based paint complete all as specified and as directed. NOTE :- Rate quoted shall be deemed to be included for scaffolding up to 15 mtr height building.
Material and labour for complete removal and preparation of old decorated treatment on wall / ceiling by scrapping with trucare wall sander : L-01/H-01 (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. or equivalent makes viz Xpress sanding machine having suction vaccum bag or by manual scrapping tools where mechanical removal is not possible and filling cracks, holes etc complete and applying two coats of oil bound emulsion distemper of approved tint including priming with alkali resistant primer complete all as specified and as directed.
Material and labour for complete removal of existing treatment for preparation of old decorated treatment on wall / ceiling / chajja by scrapping with trucare wall sander : L-01/H-01 (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. or equivalent makes viz Xpress sanding machine having suction vaccum bag or by manual scrapping tools where mechanical removal is not possible and filling cracks, holes etc complete and applying two coats of Anti fungal weather proof grade exterior acrylic emulsion paint of approved tint over a coat of weather proof primer with crack filling upto 5 bars of positive hydrostatic pressure on vertical walls without any dilution with forced coverage not more than 3.5 sqm / ltr as per manufacturer's instructions and all coats including primer to be applied with fully automatic airless spray machine of paint application with a flow speed of minimum 1 ltr per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in subsequent coats of paint complete all as specified and as directed. MAKE :- Apex Ultima Protek Asianpaints/ Nerolac excel top guard / Berger weathercoat long life 10
Material and labour for complete removal of existing treatment for preparation of old decorated treatment on wall / ceiling / chajja by scrapping with trucare wall sander : L-01/H-01 (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. or equivalent makes viz Xpress sanding machine having suction vaccum bag or by manual scrapping tools where mechanical removal is not possible and filling cracks, holes etc complete and preparation of old plastered surfaces of wall and applying two coats of lustre paint over two base coat/ two coats of primer complete all as specified and as directed.
Material and labour for complete removal of existing treatment for preparation of old decorated treatment on wall / ceiling / chajja by scrapping with trucare wall sander : L-01/H-01 (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. or equivalent makes viz Xpress sanding machine having suction vaccum bag or by manual scrapping tools where mechanical removal is not possible and filling cracks, holes etc complete and preparation of old plastered surfaces of wall and applying two coats of wall dampness treatment complete all as specified and as directed. MAKE :- Smart care damp proof, Advanced
Material and labour for preparation of old painted wooden surfaces of any description exceeding 10 cm in width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed.
Material and labour for preparation of old painted steel surfaces of any description exceeding 10 cm in width or girth and applying one coat of synthetic enamel paint of approved tint complete all as specified and as directed.
Material and labour for preparation of old painted steel surfaces of any description exceeding 10 cm in width or girth and applying two coats of synthetic enamel paint of approved tint complete all as specified and as directed.
Clearing away roots, and trees not exceeding 30 cm girth on buildings at any height including all grass vegetation, saplings, shrubs, brushwood, undergrowth, and removing rubbish upto a distance of 50 metres outside the periphery of the area under clearance except in the case of surface dressing which includes for all the foregoing except clearing away of trees complete all as specified and as directed.
Material and labour for rendering 12mm thick on fair faces of brick or concrete surfaces of wall in CM (1:6) including taking down old cement plaster complete all as specified and as directed.
Material and labour for 15mm thick cemet plalster in CM (1:4) over wall / concrete surfaces finishing the surfaces even and smooth without using extra cement,including taking down old cement plaster, complete all as specified and as directed.
Material and labour for 5mm thick rendering on concrete surface of ceiling in CM (1:3) and rendering is to be finished even and smooth without using extra cement,including taking down old cement plaster.complete all as specified and as directed.
Material and labour for water proofing treatment of external walls, chajjas and newly plaster surfaces by applying two coats of elastomeric coating material after clearing the surfaces thoroughly and sealing all cracks with acrylic sealing compound complete all as specified and as directed. MAKE :- Dr FIXIT / PIDILITE / FOSRAC /EXCOT
Material and labour for cleaning treatment of external walls of stone masonary by applying 1 coat Sagatech SC @ 2.5 litre per square metre (Stone and stone masonry cleaner) Make:-Saga polymer only (approved by trial) or equivalent after cleaning the surface throughly and sealing all the pointing with cement and sand mortar with approved water proofing additive complete all as specified and as directed.
Material and labour for preparation of new surfaces (plastered or un-plastered) of walls and applying two coats of cement based paint over a coat of primer complete all as specified and as directed.
Material and labour for preparation of new plastered surfaces of any description and applying three coats of white wash on ceiling/chajjas complete all as specified and as directed.
Material and labour for washing, rubbing down and stopping of distempered and painted surfaces of manglore tile, AC sheet roof and applying two coats of exterior acrylic emulsion paint over one coat of exterior primer complete all as specified and as directed.
L.K.R.TIWARI CONSTRUCTION
MAHESH DADAJI BACHHAV
VP DEVELOPERS AND CONTRACTOR
greenstone construction
Pratap enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .