Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical REJECTED DUE TO FIRMS HAS NOT COMPLETED THE WORK ON TIME DURING SEASON 2022-23 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
11 Jun 2025, 9:00 amClosed
GENERAL MANAGER
THE KISAN SAHKARI CHINI MILLS LTD. MAHMUDABAD (OUDH), SITAPUR -261203
BOILER FABRICATION AND ERECTION WORK SERVICES FOR SEASON 2025-26
2025_KSCMS_1044447_1
KSCM/152/C/GM/2025-26
Open Tender
Miscellaneous Works
90 days
THE KISAN SAHKARI CHINI MILLS LTD MAHMUDABAD OUDH
PLEASE REFER TO TENDER DOCUMENTS
3 documents required · 3 mandatory
₹590
THE KISAN SAHKARI CHINI MILLS LTD
₹30,000
3 Jul 2025
3 Jun 2025
11 Jun 2025
3 Jun 2025
11 Jun 2025
3 Jun 2025
3 Jun 2025 - 11 Jun 2025
Amount
For 20 Ton Walchand Nagar make Boilers
Drum to Drum tube size 63.5mm O.D. & sucessfuly hydroulic testing at 32 Kg/Cm² Dismentaling of old tubes, Fabrication of new tube as per drg./sample
Side Wall tube size 70mm O.D (Row no 18 to 25)Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
Relief Tube size 76.2mm O.D.Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
Roof tube size 76.2 mm O.D. Dismentaling of old tubes ii) Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
Screen Tube size 70mm O.D. (Row no 16-17) Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
Super Heater coil tube size 44.45 mm O.D. Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
Dismentaling, Fabrication and erection of Nipple
Economiser 24 tube of 4" od size Dismantling of old tube and bends. Fabrication of new tubes as per drawing / sample. Frabrication of new tubes successfully hydrolic testing at 32 Kg/cm² (material of coils on tube i.e. 3mm plate to be supplied by party)
Economiser 24 tube of 4" od size Dismantling of old tube and bends. Fabrication of new tubes as per drawing / sample. Frabrication of new tubes successfully hydrolic testing at 32 Kg/cm² (material of coils on tube i.e. 3mm plate to be supplied by factory)
Drum to front header Rooftube 70mm O.D.
Dismentaling of old Air heater tubes of boiler No. 1 & 2 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.)
For 30 Ton Taxmaco make Boilers
Drum to Drum tube size 63.5mm O.D. (Row No 6-13) Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 32
Side Wall tube size 76.2mm O.D Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm²
Roof tube size 76.2mm O.D. Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm²
Steam Relief Tube size 76.2mm O.D. Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm²
Steam Circulation tube from Drum to super water header 76.2mm Dismentaling Fabrication of tubes Fitting of tubes & trial
Down tube pipes Drum to side header (6 Nos) Dismentaling of old tubes Fabrication of new tube as per sample with flange Fitting & hydroulic testing
Super heater coils tube size 44.45mm O.D. Dismentaling of coils Fabrication of new coilas per drg./sample Errection along with luga/clamps & hydroulic testing at 40 Kg/Cm²
Super heater coils tube size 76.2 mm O.D. Dismentaling of coils Fabrication of new coilas per drg./sample Errection along with luga/clamps & hydroulic testing at 40 Kg/Cm²
For Texmaco make 30 Ton Boiler
Dismentaling Fabrication with welding of MS Flats size 50 mm X 4mm thick (Flats would be supplied by the party) then erection of Economizer coils (26 Nos) size 44.45mm od X 4.06 mm thick (supplied by factory) with hydraulic testing at 36 kg/cm² pressure at our 30 Ton capacity Texmaco boiler. Side plates and cover of economizer chamber will also by fitted by the contractor
Dismentaling Fabrication & Erection of Economizer coils (26 Nos) size 44.45mm od X 4.06 mm thick (supplied by factory) with hydraulic testing at 36 kg/cm² pressure at our 30 Ton capacity Texmaco boiler. Side plates and cover of economizer chamber will also by fitted by the contractor
Machining of cap seat Eliptical
Machining of cap seat Round
Machining of header seat at site Eliptical
Machining of header seat at site Round
Re-threading of cap bolt if required
Dismentalling, fabrication & errection of Nipple of any size
Dismentalling of old & weak air heater tubes of boiler no 3 and fitting new tubes
Drum to Drum, Bank tubes 63.5mm O.D. (tube no 14 to 17) Dismentaling of old tubes Bends replacement of old tubes by new tube.Errection & successfully hydroulic testing at 32 Kg/Cm²
Dismentaling of old Air heater tubes of boiler No. 3 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.) Supporting plate to be dismantled at the time of dismantaling the tube and the plates to be fitted by the contractor / fabricator on fitment of new tube. (The new supporting plate of Air Heater to be supplied by Factory)
Dismentaling of old Air heater tubes of boiler No. 3 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.) Supporting plate to be dismantled at the time of dismantaling the tube and the plates to be fitted by the contractor / fabricator on fitment of new tube. (The new supporting plate of Air Heater to be supplied by Contractor / Fabricator)
ABHAY ENTERPRISES (BID ID -5244428)
ARESCO ENGINEERING WORKS (BID ID -5244439)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid