Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹29.9 L+₹1.6 L (5.51%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹30.6 L+₹2.4 L (8.31%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹31.5 L+₹3.2 L (11.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹32.7 L+₹4.4 L (15.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49.6 L
EMD Value
₹99,220
Closing Date
6 Oct 2026, 4:00 pmClosed
Office of Ex. Engineer PWD RnB Division Pahalgam
Office of Ex. Engineer PWD RnB Division Pahalgam
Development of Park at Yanner Pahalgam
2026_PWDJK_326461_1
ENIT NO 83 OF 2026-27
Open Tender
Civil Works
Percentage
60 days
Pahalgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Centralized Designated Pooling Bank Account
₹99,220
7 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A) Development of Yenner Park bwo Fencing. Engagement of JCB for Levelling of ground and removal of big boulders and diposal of surplus material as directed by EIC. | 19 | Hour | 1,016.95 | ₹19,322.05 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 529.04 | Cum | 164.2 | ₹86,868.37 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in foundations trenches etc including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 86.72 | Cum | 225.18 | ₹19,526.48 |
| 4 | P/L of dry nallah soling tightly hand packed i/c carriage charges and headload charges complete job. | 12.98 | Cum | 847.46 | ₹11,000.03 |
| 5 | Providing and laying in position cement concrete of specified grade Of 1:4:8 mix ( 1 cement : 4 coarse sand : 8 graded stone agg.40 mm nominal size excluding cost of centering and Shuttering all work up to plinth . | 10.81 | Cum | 4,561.36 | ₹49,308.3 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 99.58 | Cum | 5,778.52 | ₹5,75,425.02 |
| 7 | Structural steel work in tubular sections, in frames including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 8,600 | KG | 105.9 | ₹9,10,740 |
| 8 | Steel work welded in built up sections/framed work, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel
primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 412.8 | KG | 159.21 | ₹65,721.89 |
| 9 | Brick work with FPS bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 cement, 6 coarse sand) i/c extra for Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto floor
V. | 18.22 | Cum | 7,914.1 | ₹1,44,194.9 |
| 10 | Centering & Shuttering inc strutting, propping etc and removal of formwork for foundations, footings etc | 346.5 | SQM | 251.04 | ₹86,985.36 |
stage.html
html • 0.03 MB
finance_1104272.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1104272.xls
BOQ • 0.29 MB
83cor.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .