| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.7 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹25.2 L+₹2.4 L (10.7%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹26.0 L+₹3.2 L (13.8%)Rejected-Finance | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹26.6 L+₹3.7 L (16.4%)Rejected-Finance | L-4 | Rejected-Finance L-4 | |
| 5 | L-5₹28.3 L+₹5.5 L (23.9%)Rejected-Finance | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S Yamin L7 | High Tech Metal India L3 | Adhunik Builders L2 | M/s Vijay Enterprises L4 | M/s Jai Hanuman Construction L5 | RRR CONSTRUCTIONS L1 | PRAGATI BUILDERS L6 | PRAHLAD NARAIN KOLI L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition/Dismantling of Brickwork or stone/ boulder masonry, built in cement mortar incl all quoins, arches, pillars, etc, complete all as specified and directed . | 37 | Cum | 100 ₹3,700 | 200 ₹7,400 | 50 ₹1,850 Lowest | 150 ₹5,550 | 180 ₹6,660 | 100 ₹3,700 | 500 ₹18,500 | 150 ₹5,550 |
| 2.00 | M&L for Brickwork with subclass 'B' bricks (old size bricks), straight or curved on plan exc 6m mean radius, built in CM 1:6 complete all as specified and directed . | 37 | Cum | 4,500 ₹1,66,500 | 4,000 ₹1,48,000 | 5,500 ₹2,03,500 | 4,299 ₹1,59,063 | 3,200 ₹1,18,400 | 4,000 ₹1,48,000 | 3,500 ₹1,29,500 | 3,000 ₹1,11,000 Lowest |
| 3.00 | Taking down cement plaster of any description on concrete surfaces such as soffit of RCC slab, chajjas and brick walls, Ceiing etc including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed | 1,100 | Sqm | 10 ₹11,000 Lowest | 20 ₹22,000 | 15 ₹16,500 | 10 ₹11,000 Lowest | 10 ₹11,000 Lowest | 10 ₹11,000 Lowest | 10 ₹11,000 Lowest | 15 ₹16,500 |
| 4.00 | M&L for rendering 15mm thick in CM 1:4 on of brick work or concrete surface finish ever and smooth (w/o using extra cement) incl WPC as per user manual complete all as specified and directed. | 1,369.57 | Sqm | 199 ₹2,72,544.34 | 170 ₹2,32,826.83 Lowest | 175 ₹2,39,674.67 | 175 ₹2,39,674.67 | 220 ₹3,01,305.3 | 180 ₹2,46,522.52 | 200 ₹2,73,913.91 | 200 ₹2,73,913.91 |
| 5.00 | M&L for preparation of new plaster surface & apply two coats of cement based paint over a coat alkali primer resistance incl one layer of 3mm thick wall care compound of altek/birla putty on old scraped surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed . | 1,778.27 | Sqm | 50 ₹88,913.48 | 170 ₹3,02,305.83 | 35 ₹62,239.43 | 30 ₹53,348.09 Lowest | 65 ₹1,15,587.52 | 60 ₹1,06,696.17 | 30 ₹53,348.09 Lowest | 50 ₹88,913.48 |
| 6.00 | M&L for two coat of Acrylic smooth exterior emulsion paint over one coat of acrlic primer incl one layer of 3mm thick wall care compound of altek/birla putty for exterior/interior on old scraped wall/ceiling surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed .
Note : Colour and make as approved by Engr-in-Charge. | 100 | Sqm | 99 ₹9,900 | 65 ₹6,500 Lowest | 75 ₹7,500 | 80 ₹8,000 | 85 ₹8,500 | 65 ₹6,500 Lowest | 70 ₹7,000 | 110 ₹11,000 |
| 7.00 | M & L for preparation of old wall surfaces by removal of existing treatment and apply two coats of cement based paint over a coat alkali primer resistance incl one layer of 3mm thick wall care compound of altek/birla putty on old scraped surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed . | 100 | Sqm | 60 ₹6,000 | 30 ₹3,000 | 45 ₹4,500 | 40 ₹4,000 | 60 ₹6,000 | 65 ₹6,500 | 25 ₹2,500 Lowest | 50 ₹5,000 |
| 8.00 | M & L for preparation of old surfaces by removal of existing treatment and apply one coats of cement based paint over a coat alkali primer resistance incl one layer of 3mm thick wall care compound of altek/birla putty on old scraped surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed . | 120 | Sqm | 50 ₹6,000 | 20 ₹2,400 Lowest | 55 ₹6,600 | 55 ₹6,600 | 55 ₹6,600 | 50 ₹6,000 | 25 ₹3,000 | 35 ₹4,200 |
| 9.00 | M&L for providing and laying cement mortar near ground level factory made kerb stone of M-25 grade cement concrete inposition to the required line, level and curvature, jointed with cement mortar 1:3, including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete all as specified and directed . | 0.9 | Cum | 12,000 ₹10,800 | 7,500 ₹6,750 | 7,500 ₹6,750 | 8,700 ₹7,830 | 7,200 ₹6,480 | 4,500 ₹4,050 Lowest | 14,000 ₹12,600 | 8,000 ₹7,200 |
| 10.00 | M & L for preparation of old stone, concrete surfaces of any description over 10 CM width or girth and applying one coat of plastic emulsion paint (Weather Coat) on old footpath/colour tiles/ kerb stone etc (colour and pattren as per approved by EIC ) complete all as specified and directed. | 100 | Sqm | 50 ₹5,000 | 40 ₹4,000 | 65 ₹6,500 | 50 ₹5,000 | 50 ₹5,000 | 60 ₹6,000 | 35 ₹3,500 Lowest | 60 ₹6,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
4 Jun 2026, 6:00 pmClosed
GE (AF) FARIDABAD
GE (AF) FARIDABAD
REPAIR TO COMPOUND WALL, FOOTPATH, HARDSTANDING, INTERLOCKING, KERBSTONE, STATIC WATER TANK, FENCING AND OTHER ALLIED MISC WORKS AT AF STN NARAINA UNDER AOR OF GE (AF) FARIDABAD
2026_MES_766917_1
GE (FBD)/AF-T-14/2026-2027
Open Tender
Civil Works
Item Rate
180 days
Naraina
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) FARIDABAD
₹80,000
Yes
3 Jul 2026
21 May 2026
6 Jun 2026
21 May 2026
4 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition/Dismantling of Brickwork or stone/ boulder masonry, built in cement mortar incl all quoins, arches, pillars, etc, complete all as specified and directed . | 37 | Cum | - | - |
| 2 | M&L for Brickwork with subclass 'B' bricks (old size bricks), straight or curved on plan exc 6m mean radius, built in CM 1:6 complete all as specified and directed . | 37 | Cum | - | - |
| 3 | Taking down cement plaster of any description on concrete surfaces such as soffit of RCC slab, chajjas and brick walls, Ceiing etc including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed | 1,100 | Sqm | - | - |
| 4 | M&L for rendering 15mm thick in CM 1:4 on of brick work or concrete surface finish ever and smooth (w/o using extra cement) incl WPC as per user manual complete all as specified and directed. | 1,369.57 | Sqm | - | - |
| 5 | M&L for preparation of new plaster surface & apply two coats of cement based paint over a coat alkali primer resistance incl one layer of 3mm thick wall care compound of altek/birla putty on old scraped surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed . | 1,778.27 | Sqm | - | - |
| 6 | M&L for two coat of Acrylic smooth exterior emulsion paint over one coat of acrlic primer incl one layer of 3mm thick wall care compound of altek/birla putty for exterior/interior on old scraped wall/ceiling surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed .
Note : Colour and make as approved by Engr-in-Charge. | 100 | Sqm | - | - |
| 7 | M & L for preparation of old wall surfaces by removal of existing treatment and apply two coats of cement based paint over a coat alkali primer resistance incl one layer of 3mm thick wall care compound of altek/birla putty on old scraped surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed . | 100 | Sqm | - | - |
| 8 | M & L for preparation of old surfaces by removal of existing treatment and apply one coats of cement based paint over a coat alkali primer resistance incl one layer of 3mm thick wall care compound of altek/birla putty on old scraped surfaces or new plasterd surfaces and obtain smooth finish using sand paper complete all as specified and directed . | 120 | Sqm | - | - |
| 9 | M&L for providing and laying cement mortar near ground level factory made kerb stone of M-25 grade cement concrete inposition to the required line, level and curvature, jointed with cement mortar 1:3, including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete all as specified and directed . | 0.9 | Cum | - | - |
| 10 | M & L for preparation of old stone, concrete surfaces of any description over 10 CM width or girth and applying one coat of plastic emulsion paint (Weather Coat) on old footpath/colour tiles/ kerb stone etc (colour and pattren as per approved by EIC ) complete all as specified and directed. | 100 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tenderdocu14.pdf
Tender Documents • 1.07 MB
BOQ_858891.xls
BOQ • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .