Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33,593Admitted-Finance | ₹33,593 | L1 | Admitted-Finance |
| 2 | L2₹36,199Admitted-Finance | ₹36,199 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S AB ELECTRICAL AND MECHANICAL WORKS L1 | VALLEY ELECTRICAL AND MECHANICAL WORKS L2 |
|---|---|---|---|---|---|
| 1.00Mechanical transportation, loading, unloading and handling of various items such as pump parts, motors, starters, voltage stabilizers, coil assemblies, welding tools & plant, etc. using appropriate means of transport as under: (Submersible motor) | |||||
| 2.00 | Private car, auto-rickshaw or similar with 1.0 km lead | 2 | Trip | 150 ₹300 | 150 ₹300 |
| 3.00 | Extra per kilo meter for lead >1.0 kms upto 5.0 kms (To & Fro) | 8 | Kms | 200 ₹1,600 | 200 ₹1,600 |
| 4.00 | Extra per kilo meter for lead >5.0 kms upto 10.0 kms (To & Fro | 8 | Kms | 150 ₹1,200 | 150 ₹1,200 |
| 5.00Disconnecting of all motor leads, dismantling of motor, draining off the M.oil (if applicable) and collection in suitable pan, taking out the rotor from the stator, and complete disassembly as per requirement of job: | |||||
| 6.00 | >10HP upto 60 HP (12.5 HP) | 1 | Job | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 7.00Complete rewinding of stator coils of 3-phase LV horizontal/ vertical induction motor/ submersible motor/ autotransformer/ voltage stabilizer/ etc. with suitable copper wire after complete removal of burnt-out winding, cleaning of slots, etc. (Submersible Motor) (Note: The unserviceable scrap copper generated is not taken into account for estimation of rates and shall be credited separately). | |||||
| 8.00 | Providing and fitting of finished new electrolytic grade copper wire windings with insulation in place of damaged windings including all allied jobs - per kg of winding. | 6 | Kgs | 1,999 ₹11,994 | 2,100 ₹12,600 |
| 9.00Assembling of all motor parts, refilling of drained out m.oil (if applicable), coupling and alignment with pump, reconnecting of leads and testing on full load. | |||||
| 10.00 | >10HP upto 60 HP (12.5HP) | 1 | Job | 1,000 ₹1,000 | 1,000 ₹1,000 |
Tender Value
₹33,791
Closing Date
8 Jun 2026, 4:00 pmClosed
Ex Engineer Jalshakti Mech. Div Sgr
Office of the Ex Engineer Jalshakti Mech. Div Sgr
Repair works for 12.5 HP open-well submersible motor at WSS LD Stage 1st. (S. No. 48938)
2026_PHE_310427_1
JSMDS/e-NIT-09 of 05/2026
Open Tender
Miscellaneous Works
15 days
LD Hospital
As Per NIT
2 documents required · 2 mandatory
₹0
12 Jun 2026
20 May 2026
9 Jun 2026
21 May 2026
8 Jun 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mechanical transportation, loading, unloading and handling of various items such as pump parts, motors, starters, voltage stabilizers, coil assemblies, welding tools & plant, etc. using appropriate means of transport as under: (Submersible motor) | - | - | - | - |
| 2 | Private car, auto-rickshaw or similar with 1.0 km lead | - | Trip | - | - |
| 3 | Extra per kilo meter for lead >1.0 kms upto 5.0 kms (To & Fro) | - | Kms | - | - |
| 4 | Extra per kilo meter for lead >5.0 kms upto 10.0 kms (To & Fro | - | Kms | - | - |
| 5 | Disconnecting of all motor leads, dismantling of motor, draining off the M.oil (if applicable) and collection in suitable pan, taking out the rotor from the stator, and complete disassembly as per requirement of job: | - | - | - | - |
| 6 | >10HP upto 60 HP (12.5 HP) | - | Job | - | - |
| 7 | Complete rewinding of stator coils of 3-phase LV horizontal/ vertical induction motor/ submersible motor/ autotransformer/ voltage stabilizer/ etc. with suitable copper wire after complete removal of burnt-out winding, cleaning of slots, etc. (Submersible Motor)
(Note: The unserviceable scrap copper generated is not taken into account for estimation of rates and shall be credited separately). | - | - | - | - |
| 8 | Providing and fitting of finished new electrolytic grade copper wire windings with insulation in place of damaged windings including all allied jobs - per kg of winding. | - | Kgs | - | - |
| 9 | Assembling of all motor parts, refilling of drained out m.oil (if applicable), coupling and alignment with pump, reconnecting of leads and testing on full load. | - | - | - | - |
| 10 | >10HP upto 60 HP (12.5HP) | - | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_1004224.xls
BOQ • 0.39 MB
CORRIGENDUM-Date-Extention-NIT-09.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid