Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.6 CrAccepted-AOC | ₹57.6 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹58.8 CrRejected-Finance | ₹58.8 Cr | L2 | Rejected-Finance L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non-responsive |
| 4 | Rejected-Technical PREM KUNJ APARTMENT FLAT NO 3C MPD ROAD JAGDISHPUR BHAGALPUR BIHAR | BHAGALPUR | BIHAR | 811211 | - | - | Rejected-Technical Technically Non-responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non-responsive |
Tender Value
₹52.5 Cr
EMD Value
₹52.6 L
Closing Date
18 Jul 2024, 5:00 pmClosed
Project Director (Technical)
JUIDCO Bhavan, Kutchery Chowk
Development of Transport Nagar, Ranchi (Phase 2) on EPC mode including Defect Liability Period of 3 years
2024_UDD_87417_1
JUIDCO/NIT/TN/P2/RNC-622
Open Tender
Civil Works
548 days
Ranchi
Please refer tender documents
5 documents required · 5 mandatory
₹25,000
₹52.6 L
JUIDCO Bhavan, Kutchery Chowk
14 Oct 2024
27 Jun 2024
19 Jul 2024
27 Jun 2024
18 Jul 2024
27 Jun 2024
27 Jun 2024 - 4 Jul 2024
5 Jul 2024
Amount
Development of Transport Nagar, Ranchi (Phase 2) on EPC mode in the State of Jharkhand within the project site including Architectural Planning & Design, Detailed Structural MEP, Fire fighting Design & Drawing, Preparation of detailed Estimate and bill of quantities including detailed topographical survey, geotechnical survey and hydrological survey; Engineering Procurement, obtaining approval from municipal and statuatory bodies, Project execution & construction including Truck Parking Area, Power, Water supply and sanitation (including Sump, Overhead Water Tank and Roof top Tank with water lifting arrangement), Sewer network, electrification work including CCTV Surveillance System, storm water drainage, rain water harvesting, landscaping, Solar Lighting, construction of internal roads, integrated building, service station, Treated Effluent Sump, Fire fighting Sump with Pump, Compound wall, retaining wall, widening of approach road (4 lane to 8 lane) within the available ROW thereafter during the Defect Liability Period of 3 year
Set 1: Site Levelling and Retaining Wall
Set 2: Construction of Integrated Building (including all Civil Works, services and components for the building such as Plumbing, Fire fighting, Electrical Work, Elevator, Surveillance System etc.), Storm Water Drain, Rain Water Harvesting, Parking Area, Service Station, Over Head Tank, and other services such as Fire Tank (including related components), Underground Water Tank (including related components), Electrical Room.
Set 3: Truck Parking Area, External electrification and lighting work, Storm Water Drain, rain water harvesting, Surveillance System, landscaping, construction of internal roads, Widening of Approach Road (from 4 lane to 8 lane) and Construction of Compound Wall, Deep Boring
Set 4: Treated Effluent Sump, Fire fighting Sump, Overhead Tank (ESR) (all Including Civil and MEP Works)
BSR INFRATECH INDIA LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid