| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 LAccepted-AOC | L1 | Accepted-AOC Lowest BID | |
| 2 | L2₹47.1 L+₹1.5 L (3.26%)Rejected-Finance 60 1 C C ROAD RAGHAV NAGAR DEORIA | DEORIA | DEORIA | UTTAR PRADESH | L2 | Rejected-Finance Highest BID | |
| 3 | L3₹48.0 L+₹2.4 L (5.26%)Rejected-Finance | L3 | Rejected-Finance Highest BID | |
| 4 | L4₹48.5 L+₹2.9 L (6.27%)Rejected-Finance | L4 | Rejected-Finance Highest BID |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
22 Jul 2026, 5:00 pmClosed
EO NPP Hata
EO NPP Hata
Construction Of Pond Near Karmaha math
2026_DOLBU_1167993_1
155
Open Tender
Civil Works
Percentage
120 days
ward number 03 karmahanagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
EO NPP Hata
₹2.3 L
29 Jul 2026
10 Jul 2026
23 Jul 2026
11 Jul 2026
22 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Running of 5HP Pump for Dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL ,SN -12 (3) | - | Cum | 105 | - |
| 2 | Excavation in foundation in ordinary soil (loam clau or sand) including lift upto 1.50 m & lead up to 30 m including filling watering and ramming of excavated earth into the trenches or into space between the building and sides of foundation treanch or in to the plinth removal & disposal of surpluse earth as directed by the engineer in charge up to distance of 30 m from the foundation trenches ( excluding royalty) (SN - 251) | - | Cum | 120 | - |
| 3 | R.Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap):(DSR 20.3) | - | RM | 2,791 | - |
| 4 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick wark (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SI 504 | 1 | Qtl | 58 | ₹57.94 |
| 5 | Concrete with 4 cm gauge Brick ballast, Fine Sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour and T&P etc. required for proper completion of work, finish to required template as per direction of Engineer-in-charge.as per S.I no 275 | - | Cum | 3,170 | - |
| 6 | M-15 brick work in 1:4 & c/ sand mortar in foundation and plinth | - | Cum | 4,555 | - |
| 7 | E/w in cutting or embankment in ordinary soil ,cartage up to 6 km | - | Cum | 311 | - |
| 8 | Concrete with 4 cm gauge Brick ballast, Fine Sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour and T&P etc. required for proper completion of work, finish to required template as per direction of Engineer-in-charge.as per S.I no 275 | - | Cum | 3,390 | - |
| 9 | R.C.C.slab work with cement and approved coarse sand & 2 cm gauge approved stone ballast in the proportion of 1:1.5:43excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G.gi binding wire and including necessary cenering & suttering etc.and also including supply of all material including work complete in all respectin. R.C.C. T-Beam,slab roof,lintel beam, Plinth beam & RCC Columns. SI 288 | - | Cum | 8,335 | - |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick wark (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SI 504 | - | Qtl | 5,800 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_2190576.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .