| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹8.2 L+₹660.61 (0.08%)Rejected-AOC | L2 | Rejected-AOC Accept |
| Sl No | Description | Qty | Unit | SREE VINAYAGA CONSTRUCTIONS L1 | THEERAN TRADERS AND BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00Construction of Waiting shed with Water Supply Arrangements at Vasantha Nagar Burial ground H/O Pudupalayam Agraharam | |||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 18.61 | Cum | 235 ₹4,373.35 Lowest | 260 ₹4,838.6 |
| 3.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 14 | Cum | 123.26 ₹1,725.64 Lowest | 130 ₹1,820 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 19.19 | Cum | 5,419.52 ₹1,04,000.59 Lowest | 5,419.52 ₹1,04,000.59 Lowest |
| 5.00 | Cement Concrete in 1 : 2 : 4 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 10.5 | Cum | 6,796.32 ₹71,361.36 Lowest | 6,796.32 ₹71,361.36 Lowest |
| 6.00 | Refilling the basement with excavated earth other than sand complying the Standard specifications | 9.28 | Cum | 42.85 ₹397.65 Lowest | 42.85 ₹397.65 Lowest |
| 7.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc | |||||
| 8.00 | Below GL | 36.9 | Sqm | 516.5 ₹19,058.85 Lowest | 516.5 ₹19,058.85 Lowest |
| 9.00 | Upto Roof | 59.16 | Sqm | 1,033 ₹61,112.28 Lowest | 1,033 ₹61,112.28 Lowest |
| 10.00 | Column & Sunshade | 36.38 | Sqm | 1,033 ₹37,580.54 Lowest | 1,033 ₹37,580.54 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,460
Closing Date
30 Jun 2025, 3:00 pmClosed
Block Development Officer (VP) pallipalayam
Block Development Office pallipalayam
Construction of Waiting shed with Water Supply Arrangements at Vasantha Nagar Burial ground H/O Pudupalayam Agraharam in Pallipalayam Block of Namakkal District under AGAMT-II-2025-26
2025_RDTN_572634_13
4554/2025/T6
Open Tender
Civil Works
Item Rate
180 days
pallipalayam
Required document as per Schedule
2 documents required · 2 mandatory
₹0
₹8,460
Yes
8 Aug 2025
24 Jun 2025
30 Jun 2025
24 Jun 2025
30 Jun 2025
24 Jun 2025
Amount
Construction of Waiting shed with Water Supply Arrangements at Vasantha Nagar Burial ground H/O Pudupalayam Agraharam
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement Concrete in 1 : 2 : 4 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Refilling the basement with excavated earth other than sand complying the Standard specifications
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Below GL
Upto Roof
Column & Sunshade
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Reinforced cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Brick work in C.M 1 :3 using second class bricks including cost and conveyance of all materials to site and labour charges etc complete
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc, complete .
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Emulsion Painting two coats with approved Paint over one coat of Primaring coat of Cement Paint over new cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Providing EPL Arrangements
Supplying and Fixing of Cost and Supply of 63 MM OD PVC Pipe including all labour charges etc
Earth Work Excavation for Pipe Line Trench including all labour charges etc
Laying and Joining of 63 MM PVC Pipes including all labour charges etc
Refilling the Pipe Line Trench including all labour charges etc
Supply and delivery and fixing of 2000 litre HDPE tank including all labour charges etc
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
THEERAN TRADERS AND BUILDERS (BID ID -1385694)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_684561.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .